Building permit intelligence · Boston, MA
1-3 Center Pz has 140 municipal building permits on file in Ward 3. The latest recorded activity was a electrical low voltage permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 3 mapped permits within 2 km of this address.
Low voltage cabling for Year-up 1-3 Center PZ floor 3
New work on 3rd floor for existing tenant expansion, new classrooms, meeting rms. finishes, MEP's, FA/FP
renovation to the fire alarm system for the new tenant
Renovation and New Work Dental Office
15 security devices on the 3rd floor of 1 Center Plaza for tenant PCG Security Systems GC-266140
3 mapped permits within 2 km, shown on the intelligence map above.
This address has 140 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1-3 Center Pz is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1-3 Center Pz in the PropertyLabs platform, along with alerts when new permits are filed at this address.
renovation to the 6th floor for new tenant
make safe, interior demolition and layout on 3rd floor. Full permit for build out to follow.
Install 3 sinks on the 3rd floor at 1-2 Center Plaza
Supply and install plumbing for office remodel. Other is ejector pump.
DENTAL OFFICE RENOVATION TO ADD POWER, LIGHTING & MODIFICATION TO FIRE ALARM.
Install 134 Ca6a data cables for Public Consultants Group 1 Center PLZ
Fire Alarm scope assocaited with tenant renovations on the 3rd floor. Install new devices on new wiring and relocate existing devices all tied to existing system.
Electrical scope associated with tenant renovations on the 3rd floor. New light fixtures, lighting controls, receptacles, & poke thru's to be installed throughout.
111 telecom drops on the 3rd floor of 1 Center Plaza for tenant PCG CZ-267190
HVAC CONTROL WIRING AT 3 CENTER PLAZA ON THE 3RD FLOOR
HVAC CONTROL WIRING ON THE 3RD FLOOR
Renovations of existing space on the 3rd Floor for new offices, conference Rooms and common areas. Work includes removal of finishes, drywall, painting, flooring, ceilings, millwor…
Demo/make safe existing space. Install temp power, temp lighting and pig tail for grinder
Demolish pantry style sink, electric water heater, and floor drain. Demolish associated water piping on 3rd floor. Demolish associated drainage piping in the 2nd floor ceiling.
No work. Update layout to Caveau (1 Center Plaza) include stanchions and minor layout changes. Change Occupant load from 424 to 450 Occupants. Including changes that were made in t…
Interior demolition of existing space on the 3rd Floor.
Offices, Retail Stores, Parking,; Restaurant#36A/#37, Outdoor Seating for 34 Persons and Body artCertificate for Body Art;ALT-1698087 Issued 10/03/2025
Interior office renovation for the expansion of dental office into adjoining suite. Work to include modification to electrical, fire alarm, plumbing, HVAC and FP for new office lay…
Amending ALT1497937 to change occupancy from beauty salon to Body art (Studio12). No work to be done
Add new face to existing store front sign and new channel letters over the door.
Install new 200 amp 3 phase feed to retail space with 277v panel, transformer, meter socket and 208v panel
Install CCTV system
Offices, Retail Stores, Parking,; Restaurant#36A/#37, Outdoor Seating for 34 persons and Beauty Salon and Body ArtCertificate for Beauty Salon &; Body Art ( Suite 33 )ALT1612804 Is…
Meixiang Kass the owner of Pretty Chic is a tenant (suite 33) located at 3 Center Plaza, Boston, MA 02108 in Sola Salon. Meixiang Kass the owner and tenant (suite 33) is applying f…
Install new fire alarm equipment for Hanscom Credit Union.
Install a security system
1 for 1 replacement of all smoke detectors in 1 Center Plaza.
renovating store front to bank
Hascom Federal Credit Union unit 03: New plumbing to water heater, toilet, lavatory sink, utility sink and breakroom sink in unit.
Installation of network cabling and data locations.
installation of controls for existing walk in cooler, door heater controls, electrical defrost control
Install power and lighting for new storage room and new Idf room built within current tenants space
2 CP, 2nd Floor: Build new storage room and IDF room in existing office suite. Modify existing conference room to make larger. Repaint entire office suite. Patch carpet as needed.…
lighting retrofit, replace 7 fixtures and 2 switches
Renovation to an existing System at 3 Center Plaza 6th flr. - Costello Medical Adding (1) Strobe, (1) Speaker/Strobe
Renovation of an Existing Space at 3 Center Plaza 6th Floor - Costello Medical
Re: 3 Center Plz, renovations to existing tenant space on the 6th fl, includes selective removal of tenant restroom to create employee dining area &; 1 new conference room, patchin…
1 for 1 replacement of all smoke detectors at 1 Center Plaza.
Fit out new space for new Bank tenant
Plumbing connection for mother's room sink in an office.
Offices, Retail Stores, Parking,; Restaurant #36A Take out and #37 Sit Down, Outdoor seating for 34 Persons and Beauty Salon Excluding Nails.Certificate for Beauty Salon Excluding…
Run data cables for security system.
Install and Wire complete fire alarms system for space as per plan.
Offices, Retail Stores, Parking,; Restaurant#36A/#37, Outdoor Seating for 34 Persons and Beauty Salon;Certificate for Offices - Floors 7, 8 &; 9ALT1502800 Issued 8/23/2023
Alarm Controls Systems shall provide and install a functionally complete access control system for the front door and back side door. System will include a Mircom telephone entry s…
wire 40 low voltage thermostats. all wiring is low voltage address is 1-3 center plaza tenant is Sola Salon
Plumbing piping and fixtures at Sola Salon; Other Items : (40) Salon Sinks & (40) Shampoo Bowls
Gas piping to (3) Hot Water tanks
3 Center Plaza - Sola Salon Run and install lighting, power, and equipment as per plan.
Telecom: Furnish & Install 26 data locations @ 7th and 8th fl
Install new light fixtures and receptacles. Also, add new lighting controls on an existing lighting control system.
Modify the existing fire alarm system by adding 1 audio/visual notification device and 5 visual notification devices.
Install (1) set of face-lit channel letters, 18"h x 8'11-3/4"w, "(Logo) Sola Salon"; Install (1) internally illuminated sign cabinet with push thru acrylic letters, 37"h x 11'10"w,…
Spotify - 7th,8th &; 9th Floors - Renovate select areas of existing offices work includes drywall, electrical, fire alarm, sprinkler, plumbing, HVAC, and finishes
Change of occupancy to include Beauty Salon (excluding nails). Tenant fit up for a Sola Beauty Salon Studios. Associated MEP and Fire protection work.eplan
Offices, Retail Stores, Parking, Bank, Restaurant #36A/#37, Outdoor Seating For 34 Persons &; Restaurant With Live Entertainment Use.Certificate for Restaurant With Live Entertainm…
installation of 30 wifi data drops Coje Management
Renovations of space on the 4th Floor in 2 Center Plaza. Work includes removal of finishes, patching, drywall, painting, ceilings, flooring, HVAC, Plumbing, Electrical, Fire Alarm…
Add 3 new speaker strobes on the 4th floor for NITSCH
Renovation to branch power and lighting circuits on the 4th floor for NITSCH. Some new light fixtures and receptacles
to install 2 sinks and 1 water heater on 2 center plaza 4th flr
Run control wiring for hvac system
Electrical work for new tenant space Caveua
Upgrade to fire alarm system for new tenant space Caveua
Run A/V cable for sound, lights Run lines for Data
Offices, Retail Stores, Parking, Bank, Restaurant#36A/#37, Outdoor seating for 34 persons.Certificate for 8th floor offices.ALT1295603 Issued 3/25/22 &; SF1295614 Issued 2/10/22
21-0110-10 AV Low Voltage Cabling AV Cabling Only. NBBJ 8th Floor
22-0111-20 NBBJ Studio Access Control
Install wiring within office cubicles on 8th floor for NBBJ.
Change of occupancy to include live entertainment use. Build out restaurant as per plan framing, electrical, plumbing, sheetrock, HVAC, fire alarm, sprinkler, finishes on the first…
8th floor office renovation - pantry areas
Install wiring within office cubicles on 8th floor for ACLU.
The Dubliner - Replace the existing signs with new ones that are similar in look and size as per the attached BPDA approved drawings.
22-0110-10 NBBJ Low voltage Data only-209 devices
Structured Cabling and Sound Masking
Install wiring within office cubicles on 8th floor for ACLU
OME 22-075 Beacon Properties- 2 Center Plaza. Furnish and install low voltage wiring & devices per engineers drawings.
OME 22-075 Beacon Properties - 2 Center Plaza. Furnish and install electrical power and fixtures per engineers drawings.
The planned project is a tenant fit-out in an existing building, located at 1 Center Plaza, Boston, MA and classified as business occupancy. Project scope of work includes a new of…
Rough waste, vent, and water piping for three kitchen sinks, one lavatory, and one water closet
Tenant fit-out in an existing building located at 1 Center Plz, Boston, MA and classified as business occupancy. Project scope includes a new office suite on the 8th floor for busi…
TO BEGIN WORK UNDER ALT 1291973 WHILE PLANS ARE UNDER REVIEW. Cost reflected on longform;
Electrical for remodel of 8th floor commercial suite. Work includes lighting, lighting controls, receptacles, new panelboards, HVAC electrical.
Install fire alarm devices for remodel of commercial suite. Work includes smoke detector and notification devices.
Install card access for 6 doors at RealPage on the 4th floor of 3 Center Plaza
REMOVE INTERIOR PARTITIONS NO STRUCTURAL WORK
Offices, Retail Stores, Parking, Bank, Restaurant #36A/#37(Outdoor Seating for 34 Persons);Certificate for the 3rd floor;Offices, Conference Rooms, Catering Kitchen and;Common Area…
minor renovation to existing tenant space
Network wiring fro Swiss RE 3 center plaza 5th floor
Security additions for Operations of Court Management MA Trial Courts
Install wiring within office cubicles on 3rd floor for Twitter
Card access system for Twitter floor 3 of 1-2-3 Center Plaza
Offices, Retail Stores, Parking, Bank, Restaurant#36A/#37, Outdoor seating for 34 persons Certificate for:;Bank ALT1079543 issued 7/8/20
Fabricate and install one internally illuminated entryway sign with push trough acrylic letters as per the attached drawings.
2 CENTER PLAZA - 5TH FLOOR - MASS TRIAL COURT: NEW CARPET. NEW PAINT THROUGHOUT. REMOVE MISCELLANEOUS NON-STRUCTURAL PETITION WALLS. REPAIR CEILING AS NEEDED. REPLACE OLD LIGHTS. N…
Low Voltage wiring permit for Twitter at 1-2-3 Center Plaza (3 floors)
renovation to the tenant space for new tenant Twitter
renovation to the 3rd floor for new tenant space for Twitter
Offices, Retail, Parking, Bank, Restaurant w/outdoor seating (34 ppl) Certificate for the;Offices - ;6th &; 7th floors ALT941883;- 6/18/19 &; A1037904 - 6/10/20 ;
Install 381 low voltage network cables
Installation of a low voltage security and camera system at 1 Center Plaza for Salem Five bank. (Wiring done by electrical contractor.)
Job#20-084, 1-3 Center Plaza; Salem 5, 1 Center Plaza 1st Floor Bank Branch - Install of Cat 6 Cable and LV Plenum as Requested
Fit out vacant space to be a new Bank branch. Work to include framing a few interior partitions for office separation.; Minor MEP, FA and Sprinkler work.;;;;;;;;;;;; E- Plans
Install smoke detector, speaker strobe, and strobe only.
Install wiring wiring within office cubicles on 2nd, 5th, and 6th floors for Grub Hub
Offices, Retail, Parking, Bank, Restaurant w/outdoor seating (34 ppl) Temporary Certificate for the 6th &; 7th floor Offices.; Certificate expires on 8/25/20- pending issuance of A…
Minor interior demo on 3rd floor, new fit-out will encompass part of CP1 and CP3 and the entirety of CP2. 3rd floor (1-2-3 Center Plaza) for new tenant (Twitter). New offices,conf.…
Job#20-084, Salem 5 Bank Branch 1st Floor Tenant Renovation. Existing Fire Alarm Modifications.
Job#20-084, Salem 5 Bank Branch 1st Floor Tenant Renovation. Existing Distribution.
Beacon Communities - Floors 6 &; 7 -; Amend;LF permit;ALT966091. Removing a tenant stair from the scope. Add two offices, conference room and open workstation. New walls, architect…
Install new outlets, sign circuits, timeclock replace lights, install data conduit and new heat pump
6TH Floor: Plug in power for 30 new desk work stations to existing receptacles.
AV Wiring for the installation of 67 speakers for Grubhub at 1-2 Center Plaza, Boston
Offices, Retail Stores, Parking, Bank, Restaurant#36A/#37, Outdoor Seating for 34 persons Certificate for the 5th floor Offices ALT1007949 issued: 10/7/19
Install (1) New 480V Meter Socket, (1) New 200 Amp 480V Disconnect, (1) New 30 KVA Transformer, (1) New 100 Amp Disconnect and (1) New 3P 4W Panel.
1-2 center plaze install 2 new 200a meters on 5th floor
new service for the ASM Space on the 5th floor
Disconnect temp wiring and install permenant power from Eversource Vault
Install five card access proximity readers to control the five entry doors. Electric locks provided and installed by GC. Location at 2 Center Plaza, 6th & 7th Floor. Tenant Name Be…
Low Voltage Wiring permit for IANS at 2 Center Plaza 5th Floor
Existing Fire alarm Panel Upgrade Panel Only No New Devices
Existing Fire Alarm Panel Upgrade. Fire equipment only no new devices.
Interior tenant fit out, per plans.
Installation of Plumbing for two kitchen sinks on the 6th and 7th floors.
Network wiring for Beacon Communities on 6th floor
Installing 18 new devices in an existing tenant space for new tenant Beacon Communities
Renovations of existing
Temp generator power for film production Set 9-19-19
OME JOB#19-143 1 Center Plaza - Boston Periodontics. Furnish and install new fire alarm wiring and devices to be tied into the existing building system per the engineer's drawings.
OME JOB#19-143 1 Center Plaza - Boston Periodontics. Furnish and install power, lighting, tele/data provisions, floor cores, and power to dental equipment per the engineer's drawin…
Existing Office renovations on the 6th and 7th Floors of 2 Center Plaza. Demolition of existing Offices on 7th floor. New offices, team room, open office and pantry on the 6th and…
OME JOB#122 - Awaken 180 Tenant fit up including fixtures, branch wiring, and demo
Offices, Retail Stores, Parking, Bank, Restaurant#36A/#37, Outdoor seating for 34 persons ;Certificate for Offices- W20 - 2nd Floor -Only Alt918423 issued 2/7/19
Network wiring for Zafgen
renovation to the 6th floor tenant space for Zafgen