Building permit intelligence · Boston, MA
1 Exeter Pz has 234 municipal building permits on file in Ward 5. The latest recorded activity was a amendment to a long form permit dated Jul 27, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 26 mapped permits within 500 m of this address.
Amendment to ALT1817504 to note all work was completed in one phase vs. two phases listed on initial ALT permit.
Renovations - Interior NSC
Fire Alarm
Fire Alarm
Electrical
Electrical
26 mapped permits within 500 m, shown on the intelligence map above.
This address has 234 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1 Exeter Pz is dated Jul 27, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1 Exeter Pz in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Fire Alarm
Electrical
Electrical
Fire Alarm
Fire Alarm
Electrical
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Plumbing
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Plumbing
Plumbing
Plumbing
Fire Alarm
Electrical
Fire Alarm
Fire Alarm
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Connect 34 office cubicles on the 12th floor.
Interior renovation of the full 12th floor and partial 11th floor at 699 Boylston St. -(6) pull 22/6 cable to HID card readers -(6) connect card readers -(3) connect small 2 door a…
Job #20203 Volition Capital 11th &; 12th Floors 699 Boylston Street AV System Install. Work to be done at 699 Boylston St
13 telecom drops on the 10th floor of 1 Exeter Plz (699 Boylston St) for tenant KFO RS-257520
Remove a kitchen sink and water heater above then relocate same setup on the floor with new electric water heater. Adding new single bathroom.
Fire alarm scope associated with a partial tenant renovation on the 10th floor of 699 Boylston Street. Installation of new devices tied to an existing system.
Electrical scope associated with renovations on the 10th floor of 699 Boylston Street. New receptacles, light fixtures, lamps, & controls to be installed.
Network wiring for Volotion on the 11th and 12th floors
Interior renovation of the full 12th Floor and partial 11th Floor at 699 Boylston St. Work includes new power, lighting, and fire alarm upgrades.
Interior renovation of the 12th floor and partial 11th floor at 699 Boylston St. consisting of new Fire Alarm upgrades.
Addition of two kitchen to office area.
Renovations of existing space on the 10th Floor. Work includes removal of finishes, Drywall, Patching, Painting, Ceilings, Flooring, millwork, HVAC, Plumbing, Electrical, Fire Alar…
Interior renovation of the full 12th floor and partial 11th floor at 699 Boylston St. Work includes minor demolition, non structural gypsum wall board partitions, new finishes (cei…
Demo of a sink
The project is located in 699 Boylston Street 11th/12th Floor, Boston, MA. The project consists of renovations to the corridor and whitebox. This project consists of interior parti…
Demo/make safe existing fixture locations. Furnish and install new fixtures in bathrooms, located @ 699 Boylston Street 7th fl
Removal of existing bathroom fixtures for new paint and tile. New sinks and lav faucets to be installed, existing urinals and toilets to be re-used. All existing drains, vents, and…
Permit for work at 699 Boylston St, which is part of 1 Exeter Plaza. Minor non-structural changes. New millwork and finishes including flooring, paint, etc.
The project is located on 699 Boylston St 11th Floor. The project consists of alterations of an existing interior restroom. Architectural upgrades such as ceiling and any MEP work…
;Offices, Bank, Retail, &; Restaurant with Take Out;;Certificate for Offices 4th Floor;;ALT1666249 Issued 12/2/2025, SF1661443 Issued 10/18/2024;
Installation of one set of face-lit channel letters reading "Berklee" and one face-lit blade sign reading: Melo Acai & Smoothie Bar at Berklee". Approved by landmarks Application #…
Interior: Office upgrades on the 4th floor to include relocation of interior partitions and architectural upgrades. MEP, FA, FP work included. Associated with SF1661443
Renovation of an Existing Space on the 4th Floor
This project is on the 4th floor. It consists of removal of interior partitions, upgrades to architectural finishes including new walls, as well as the removal of existing HVAC, el…
Renovation of existing sink rough plumbing in former TB12 Space
Offices, Bank, Retail, &; Restaurant with take out 36A to include College/ University Education, Dance StudiosCertificate for Dance Studio - (699 Boylston Street, Lower Level)ALT16…
Change in the occupancy to include the following uses:;College/ University;education with classroom and dance studios.;No work to be done. Work completed under ALT1613847:;Renovati…
Install and relocate Low voltage wiring at 699 Boylston st. Berklee College of Music.
Low Voltage Audio Visual work, 3 studio spaces Displays Speakers Low voltage racks
Provide low voltage interlock wiring for HVAC upgrades. Work will take place at Berklee College of Dance on the 1st floor of 699 Boylston Street.
Install receptacles 1st floor 699 Boylston st
Card access and camera system for Berklee on lobby and basement levels.
Renovation of existing space on the first floor - cafe space. Work to include; selective demo, plumbing and electrical and millwork. Health dept approved plans included. Building k…
;Offices, Bank, Retail, &; Restaurant with Take Out 36A;;Certificate for Offices on 8th Floor;ALT1578426; Issued 4/3/2024 &; SF1562461 Issued 1/17/2024
Lower level dance studio- 699 Boylston- installation of interior partitions and upgrade to architectural finishes. Scope of work to also include MEP/FA/FP.
OME JOB#24-057 699 Boylston Street - Berklee College of Music Dance Studio. F&I lighting & power per the engineer's drawings.
OME JOB#24-057 699 Boylston Street - Berklee College of Music Dance Studio. F&I additional fire alarm devices as shown on the engineer's drawings.
This project is located at 699 Boylston Street, 12th Floor. The project is to include drywall, tile, paint, and countertop upgrades. There will also be minor upgrades to light fixt…
Demolition of hand sink and relocation of electric hot water heater.
Structured Cabling/Network cabling
The project consists of interior renovations to include removal and installation of interior partitions, removal & roughing MEP system. No life safety work.
Installing new fire alarm devices for tenant fit-out renovation.
Installation of two doors of card access control for a future 8th floor commercial office tenant (BAA).
Replacement of 6 bathroom sink and faucets. Re-use of existing plumbing connections, toilets and flushometers.
OME JOB#24-039 699 Boylston Street - Cornerstone Research. F&I (2) new recessed downlights, & rework power for minor restroom renovation.
Demo of the 12th Floor @ 699 Boylston, and Renovation of Restrooms on the floor.
Demolition of 12th floor office space. This work is DEMO ONLY. This short form will ultimately be tied to a long form permit for further renovations once full drawings are issued.
Renovation to the 8th Floor of 699 Boylston for Boston Athletic Association.
This project will involve architectural, mechanical, electrical, plumbing, and fire protection/fire alarm updates and improvements. There will be no demo associated with this proje…
OME JOB#24-028 699 Boylston St - Bank of America Exeter Plaza. F&I (2) floor boxes for new TV displays & receptacles in the front vestibule for video displays.
Interior Renovation bank of America;
Minor removal of existing interior walls, removing exiting sink, coil up controls, install temp lights, turn up existing sprinkler heads in preparation for the build out of this sp…
Replace two existing "Bank of America" channel letter signs mounted on raceways with new 1'- 11 5/8" x 19'- 8 1/8" signs mounted on raceways. Approved by Landmarks.
Installation of a Shower stall on the 7th floor,
In existing office space on the 7th floor build out 3 new offices and shower room for tenant, The Balt Group, includes reworking existing duct, lighting, electrical and plumbing, r…
Small Renovation to the 7th Floor of 699 Boylston for Balt Group.
Renovation to the 8th Floor For Waterway.
Renovations to existing office space to add 4 new offices with glass fronts, including reworking lights, power & HVAC, installing new finishes, sprinkler relocates to accommodate n…
S22-1166 Hub Office 699 Boylston St 7th Flr - "Stax Consulting" - Workstation Electrical
Low Voltage wiring permit for Stax at 1 Exeter Plz 7th Floor, Boston, MA
Pantry sink replacement and Mother's Room sink replacement
Install wiring within office cubicles on floors 15 and 16 for Cerulli.
Renovation of existing office space for new tenant
Offices, Bank, Retail, &; Restaurant with take out 36ACertificate for: Offices - 15th &; 16th floors onlyALT1338668 issued 6/1/22
Renovations of existing space on the 7th Floor for Stax. Work includes removal of finishes and upgrades to finishes - Flooring, Painting, Patching, and minor Electrical work.
699 Boylston Street - Cerulli Associates Misc. Low Voltage HVAC Control Wiring. AP - 220734
Network wiring for Cerulli
Installation of card access control on three 15th floor controlled tenant doors.
Installation of fire alarm devices for newly renovated office space
Renovation of existing space to new offices
Fitout of Cerulli Associates 15th & 16th Floor Spaces
Cerulli Associates -; 15th &; 16th Floors -; Renovations of existing Office space on the 15th &; 16th Floors.; Work includes removal of finishes, drywall, patching, painting, light…
Offices, Bank, Retail, &; Restaurant with Take Out 36ACertificate for: Office(s) Suite #1002 - 10th fl.ALT1273784 issued 1/25/22
Install wiring within office cubicles on 10th floor for Mapfre
Reconfiguration of the 10th-floor suite, approximately 8,000SF. Interior fit-out includes demo, electrical, fire alarm/protection, mechanical, and plumbing.
Install wiring within office cubicles on 3rd floor for Stax Consulting.
OME JOB#22-007 699 Boylston St. - MAPFRE Commerce Insurance. Furnish and install (4) new wall mount speaker/strobe devices.
OME JOB#22-007 699 Boylston St. - MAPFRE Commerce Insurance. Furnish and install power, lighting, and tele/data pathways per the engineer's drawings.
Demo & framing ahead of ALT1273784 being issued.
Offices, Bank, Retail, &; Restaurant with Take out 36A Fitness CenterCertificate for: Office(s) 2nd fl.ALT1221668; issued 7/27/21
Audio Visual Installation
Interior office renovation on the 15th floor at 699 Boylston Street to include selective removal of finishes, new architectural finishes including drywall and paint, minor upgrades…
Installation of plumbing for a kitchen sink on the 2nd floor,
Installing 8 new Fire Alarm devices in an existing tenant space for new tenant - Transformative Capital
Renovation of existing office
2nd floor new power and lighting for office area and new bathrooms
Stax 3rd floor - minor demo of non-structural interior partitions and flooring and millwork
Renovations to existing tenant space at 1 Exeter Plaza(aka 699 Boylston Street) on the 2nd floor, select demo of drywall, install new office fronts, flooring, ceiling & painting, H…
Low Voltage Wiring permit for STAX at 699 Boylston Street 3rd Floor
Renovations to existing restrooms at 1 Exeter Plaza(aka 699 Boylston St) on the 2nd floor, demo of existing toilet partitions and finishes, drywall, tile and painting, install new…
Low voltage wiring permit for Copley Equity at 699 Boylston St FL 8
Low Voltage wiring permit for Algebris at 699 Boylston St 10th Floor
Added outlet to existing office space
Installation of card access control on one door for Copley Equity Partners on the 8th floor at 699 Boylston Street, Boston, MA.
Installing 9 new Fire Alarm devices on an existing tenant floor for new tenant - Copley Equity
kitchen sink
kitchen sink
Interior office renovations on the 8th floor of 699 Boylston for tenant Copley Equity. New interior finishes and fixtures (GWB and glass partitions, floorcoverings, wallcoverings,…
Added outlet to existing office space
Interior office renovations for tenant Algebris Investments on the 10th FL of 699 Boylston. Removal and replacement of interior finishes and fixtures (floorcoverings, wallcoverings…
new fixtures on existing bathroom
Install Audio Visual Equipment
Relocate 4 existing teldata outlets & install 4 new teldata outlets @ 699 Boylston St - Flrs 2 & 3
Minor AV Upgrades for E-Trade on the 2nd Floor
Remove and replace Pump controller
10th Floor Bathroom renovation. New finishes throughout. Minor FP work. No FA work. No strucutral work. No egress changes.
Renovations to existing Restrooms.
BATHROOM RENOVATIONS
Interior renovation of existing men's and women's rooms on the 3rd floor. Replace existing finishes and fixtures with new in place. New counters, drywall, floor tile, paint, access…
Offices, Bank, Retail,;Restaurant with take out 36A and Fitness Center Certificate for: Fitness Center only ALT943147;- 5/9/19 ;
Offices, Bank, Retail and Restaurant with Take Out. Certificate for Offices 6th floor and Restrooms 4th and 5th floors. ALT928206 Issued March 8, 2019 ;
Offices, Bank, Retail, &; Restaurant with take out Certificate;For:;Offices, Core Restrooms, Elevator Lobby and Common Corridor-15th.fl., -Only Alt891861;- 11/28/18
Offices, Bank, Retail,;Restaurant with take out 36A and Fitness Center Certificate for Fitness Center only ALT943147 Issued 5/9/19 *Temporary certificate-expires-9/26/19-pending co…
Installing 29 devices in an existing tenant space for new tenant TB12
Low voltage A/V
Offices, Bank, Retail, &; Restaurant with take out Certificate for Offices;15th &; 16th floors for The Wing -Only Alt 914342 issued 2/13/19, A931109 issued 6/4/19
Fitout of TB12 Commercial Space
Changes to the Engineered Plumbing Drawings in association with ALT914342.
Installation of Tel/Data, CATV, Low Voltage Lighting Control Devices for Retail Fitout TB-12.
TB-12 Fitout Occupancy to Include 2 New Tenant Distribution Panels added to Existing Service, New Lighting, Branch Circuits, Wiring Devices, Etc.
Installation of a card access control system on the 15th floor for the new tenant Solel Partners.
Installation of a stand-alone access control keypad on the 15th floor on the men's and women's room doors.
TB - 12 -;; Change Occupancy to include Fitness Center.; Interior fitout of first floor Retail level entrance and Lower level Fitness Center facility.; Work includes new finishes,…
Installing 32 new fire alarm devices in existing tenant space for new spec suite tenant
Low Voltage Wiring permit for Solel Partners at 699 Boylston St 15th Floor
Installation of voice data cabling
Furnish and install new 400 amp bus plug, 75 KVA transformer, and panel board on 15th floor.
core toilet room renovation
Fire Alarm Additions
Tenant Fitup, and minor bathroom renovations.
Renovation of Existing Bathrooms
bathroom renovation
Renovation of existing shell space
Cornerstone - Floors 4,5 &; 6 -; Office renovations;on the 6th floor and Restroom renovation on the 4th and 5th floors to include: selective demolition, drywall, flooring, ceiling,…
Fitout of the Wing restaurant space
Demolition of interior finishes for new tenant fit out.
Renovation existing space
Renovations of space on the 15th &; 16th floors for The Wing. Work includes removal of finishes, drywall, patching, painting, flooring, ceilings, HVAC, Electrical, Plumbing, and Fi…
Alteration to existing FA system in shell space
Install one fire alarm strobe only device in new bathroom on 2nd floor of AT&T space at 699 Boylston Street
Install power feeds to (3) store signs, fed from and existing 120v circuit.
plumbing work in att store for hp bathroom (699 Boylston St)
adding bath on 2nd floor 2 rec/1 fan/1 plug/vanity light. Work do be done @699 Boylston in At&;t
Minor interior renovations (9) new recp, (7) empty conduits for teler line relocate (2) existing receptacles @ 699 Boylston St for Bank of America
Minor interior demo(furniture,flooring), new finishes in BOA branch.lighting relocates, rebrand /support ATM locations.
Interior renovations on vacant 15th floor. Renovate existing core restrooms. Build out new elevator lobby and common corridor. Build out new office suite and leave vacant space for…
S18-938, Connect jumpers, receptacles and plug in base feeds for office workstations @ 699 Boylston St 3rd floor, "stax".
RETROFIT CORE TOILET ROOM
Install signage for AT&;T. 1 illuminated globe logo. 1 set of illuminated channel letters AT&;T 1 set of door vinyls.
OME18-241 7th Floor Restroom Lighting Renovation
7th floor common restroom renovations. Replace existing finishes and fixtures with new. No changes to egress, FP or FA.
Demolition of existing flooring and casework at copy/print & kitchen/pantries on the 4th, 5th & 6th Floors. Installation of new flooring and casework.
Electrical shutdown of main switchboard for preventive maintentence.
Install low voltage cabling, connectivity, and system components associated with Distributed Antenna System (DAS) upgrades to be performed at the AT&T Core Store at 699 Boylston St…
Fitout of Cava Mezze Grill Restaurant Space.
Fitout of Cave Mezze Grill Restaurant Space
Replacement of 20 low voltage CCTV cameras.
New single occupant employee bathroom on second floor of existing AT&;T Retail Store. No structural alterations. Work includes partitions, fixtures, finishes and related electrical…
Expand kitchen for tenant "Stax" on multi-tenant 3rd floor. New non-structural interior partition, rework acoustical ceiling and soffits, painting, and flooring.
Low Voltage Wiring Permit for Blue Moon Capital at 699 Boylston St. 7th Floor
Renovation to existing space for Blue Moon Capital
Interior renovations on the west side of multi-tenant 7th floors. New non-strucutral interiors partitions (drywall and glass), cabinetry, paint, and reworked MEP's.
Offices, Bank, Retail &; Restaurant with Take Out Certificate for Offices (3rd Floor - Gradifi) ALT730039 issued 7/21/2017
Replacement of finishes including paint, sales fixtures, and flooring. Install new closets in the room, and a raised platform. Lighting additions will also be completed, no change…
renovation of an existing office space
renovation of a new office fit out
Installation of plumbing for a kitchen sink on the 4th floor,
Replace lighting at Cerulli Assoc., 617-227-6817.
Provide new door & threshold. Install new through-box at teller counter. Paint. Relocate furniture.
Tenant fit up for FRB/Gradifi on the 3rd floor of 699 Boylston Street. Lighthouse Job # 17-10359
installation of a kitchenette
Gradifi - 3rd Floor: Build out of tenant space to include selective demo of finishes, all new drywall partitions, glass fronts,ACT, flooring, lighting, plumbing, new HVAC boxes, ne…
Interior demolition on the 15th and 16th floors of 699 Boylston St. Both floors being demolished back to shell condition. Demolition includes non-structural partitions, ceilings, f…
To connect led sign reading bank of Boston to 20 amp circuit supplied by others, total load is 2 amps. 120 volts
38- new data outlets & wire & install (3) TV's
Renovation to the TPRV Space on the 7th Floor
Expansion of the existing server room. One new wall, painting, new carpet and resilient flooring, relocating of existing lighting. No life safety or structural work.
Tenant renovations on the Exeter St. side of multi-tenant 7th floor - demolition of existing offices and meeting areas, new open office and copy area. New finishes including paint,…
Installing new fire alarm devices in existing tenant space (Marketing Suite)
Plumbing Reno - 699 Boylston Street Marketing
Interior fit out of existing office space on east side of 7th floor. Existing entrances/exits to office space will remain, no changes in egress. Demolition of interior GWB partitio…
Renovation to the 7th Floor into a Marketing Suite
INTERIOR RENOVATION OF 8TH BOSTONIA TENANT SPACE. RELOCATE EXISTING SWITCHES IN PERIMETER OFFICES, RELOCATE TWO FLOOR CORES
Certificate of Occupancy · CHGOCC · Jul 30, 2026