Building permit intelligence · Boston, MA
1 Harbor St has 152 municipal building permits on file in Ward 6. The latest recorded activity was a intren permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Renovations - Interior NSC
Fire Alarm
Electrical
Low Voltage
Low Voltage
Low Voltage
1 mapped permit within 2 km, shown on the intelligence map above.
This address has 152 permit records in PropertyLabs' public history and is located in Ward 6. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1 Harbor St is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1 Harbor St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Fire Alarm
Fire Alarm
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Electrical
Low Voltage
Low Voltage
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Electrical
Plumbing
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
ELEC: Installation of (8) duplex receptacles and (1) 5HP exhaust fan
LV: Installation of (8) T/D outlets
LV HVAC Control Wiring
Installation of New Mechanical ductwork and Exhaust Fan.
Remove and reinstall ceiling devices and light fixtures in one room on 2nd floor. Utilize existing homeruns, devices and fixtures.
Warehouse, Administrative Offices, Bank, Laboratories, and Manufacturing;Certificate for Labs on the 2nd floor.;ALT 1735615 Issued 8/1/25
Installation of special waste piping to serve trench drains. (456500-1)
Connecting 77 Furniture Fixtures at 1 Harbor St 2nd floor. Vertex Company
Renovation of 2nd Floor lab space. Add (3) AV-speaker strobe units and (6) magnetic door locks. Tie into existing FA loop. Additional devices are existing to remain.
Customer is replacing 12 sets of cubicle with new. We relocated 4 existing circuits and wired 12 furniture whips on the second floor
Existing Roof Top Unit is being replace with a new unit that has the same electrical requirements. The existing 3 phase 480V 250A circuit will not reach the new unit disconnect mea…
This project includes installation of a firewater containment pit and rework of existing MEP's.
This project will include a modification to an existing lab by upgrading area requirements for use of hazardous material storage and use.
Install 1 dedicated 480V 3 Phase circuit and 3 dedicated 120V Circuits Wire control panel fora tablet press and coater in room 134
Renovation of existing space on 2nd floor with lighting and power. Installation of load bank for existing generator.
Vertex - Kilo Lab Modification. MISC Low Voltage HVAC Control Wiring FK 253800
Remove urinal and replace with water closet.
Installation of domestic water piping and waste piping for dedicated special waste system. (456500-1)
This project will include modifications to existing labs by upgrading area requirements for use of hazardous material storage and use for laboratory.;eplan
Install dust collector that needs to be tied into fire alarm panel
Supplemental Chiller Replacement Project. Adding steel to existing steel platform.
2nd floor renovation of 4 rooms. Install 3 new horn strobe units, tie into existing loop.
Vertex Micronizer - Phase II. MISC Low Voltage HVAC Control Wiring FK 253474
Fire alarm work in an existing building, relocating (2) horn/strobes, adding (2) amber horn/strobes and (6) new modules to monitor (2) new Fike Dust Collectors
This project consists of a renovation to a 300 sqft storage room within an existing building at 1 Harbor Street, Boston, MA. The scope includes new Cat6 cabling to new tel/data out…
Installation of water and waste piping serving plumbing fixtures in lab space. (885809-1)
Phase 2 of renovation on 2nd floor. Demo existing, install 7 new lights, 1 exit, devices, disconnects, j-box, sensor and switches, one transformer, two panelboards and VFD's on roo…
This 1,000 sqft project involves modifications to an existing laboratory space, including a downflow booth, milling room, and a cleaning/fume hood room. Additionally, this work inc…
The project scope and renovations are limited to the Spare Parts Room (562) . Will include adding 1 sprinkler head
Install one mop sink on 1st floor
Providing two 1200 KVA Rental Generators for 1 week. One Generator to power select pieces of gear during existing main switchboard shutdown to refeed existing 1200A service. One Ge…
Verex - Mircronizer Project. MISC Low Voltage HVAC Control Wiring. FK 253474
Renovation of 3 rooms on 2nd floor. Demo existing, install 10 new lights, an exit, devices, disconnects, j-boxes, sensors and switches. Phase 1 consists of storage room, Phase 2 fo…
This project consists of a renovation to a 300 sqft storage room within an existing building at 1 Harbor Street, Boston, MA. The scope includes interior improvements, with work lim…
Installation of (8) new emergency showers and relocations of (1) emergency should and (1) eyewash within lab space. Minor drywall openings to allow for in wall plumbing piping and…
Renovation of the First and Second Floor of a commercial building.
Warehouse, Administrative Offices, Bank, Laboratories, and Manufacturing;Certificate for Manufacturing, Labs, Office and Staff Support Areas on the Mezzanine Level.ALT 1474912 Issu…
; Warehouse, Administrative Offices, Bank, Laboratories, and Manufacturing;; Certificate for Chemical Storage Room - Level 1; ;ALT1552670 Issued February 09, 2024;
;Warehouse, Administrative Offices, Bank, Laboratories, and Manufacturing;;Certificate for Lab on the 2nd floor.;ALT 1552660 Issued February 12, 2024
Refeed existing 1200A service from new 3000A switchboard in VCGT GMP Fit-out space. The current 1200A service feeds the VCGT GMP Warehouse and runs from the Retail Switchboard in t…
Low voltage building automation and controls @ VERTEX MANUFACTURING CENTER, 1 HARBOR STREET,BOSTON, MA 02210 - 1st fl
Connect furniture feeds for 19 stations
Run low voltage communication wires in new conduits for Hazmat alarm system on 1st floor.
Vertex 2nd Fl Mech Rm Wire HRO Pump equipment for Einstein's Solutions Inc. Wire replacement HRO pump equipment in 2nd Fl Mech. Rm for Vertex. Wire HRO pump skid, tank, polisher,&…
Addition of Hazmat system to 1st floor project: bring 120v feed to (9) pull stations, install horn/strobes and install empty conduit for communication wires.
Existing switchboard to be field modified to add new section, extend existing bus and provide (3) new 800A breakers.
Remove existing device and replace with new device in one room. Install new pull station and horn/strobe in corridor outside of Solvent storage room.
Remove and replace existing lighting, control panel, exit sign and FA device utilizing existing branch circuit wiring in one room.
Provide wiring for access doors and 2 cameras
Provide new detectors and speaker/strobe devices and relocate existing devices for renovated space. All existing and new strobe devices will be synchronized.
Install Fire Alarm system for new lab space & office for new Vertex Manufacturing Facility. Existing initiating circuits to be modified to accommodate new architectural fit out for…
Install Fire Alarm system for new lab space & office for new Vertex Manufacturing Facility. Phase 1 of 2.
Providing a 2000kw Rental Generator for 1 week to power select pieces of gear during existing main switchboard shutdown. Installation of new Eaton 4000amp switchboard section to ex…
Provide temporary service power from 2meg Generator. Furnish and install disconnect switches fed through tap rule from main feeders to feed permanent panels and UPS. Cut over from…
Install an outdoor 1 phase 75KVA transformer with disconnects and two 150A 1 Phase feeder wiring for parking lot trailers
Install 4 Cat6A data line to the parking lot trailer
Temp Office Trailer
Provide wiring for card access, and CCTV for Vertex buildout
Low voltage Environmental Monitoring System (EMS) for logging room conditions.
Low voltage building automation and controls @ VERTEX MANUFACTURING CENTER, 1 HARBOR STREET,BOSTON, MA 02210
Low voltage building automation and controls @ VERTEX MANUFACTURING CENTER, 1 HARBOR STREET,BOSTON, MA 02210
Install Data Cabling
Install Data cabling
Interior MEPS and architectural renovation from office space to lab on second floor;to consist of;interior;level 1 lab renovation. Exterior roof addition of steel dunnage and insta…
Level 1. Interior MEP and Architectural renovation of chemical storage room. FA/FP included. [ePlan]
Adding breakers to existing panels, disconnects for new equipment and branch wiring.
Interior addition of new ductwork, mechanical pipe, electrical, and 3 sprinkler heads for new owner equipment in existing warehouse. This work does not impact the current use of th…
Install Delta Building Automation System for HVAC Controls. @ Work area - Flr 2 / Roof/ Vertex VMC Flr 2 Kilo Lab
Renovation of existing space on 1st & 2nd floor with lighting and power for some new lab space.
43049P VERTEX T1D FIT OUT-New lab space in existing building
Lab fitout on the 2nd floor of Vertex
MEP tie in and stub outs for future renovation work including new electrical breakers, mechanical pipe, plumbing pipe, and duct work. Cost of project is reflected onALT1552660'
Phase 1 of 2: Install a 3000amp service in an existing space to facilitate a new lab space & offices for a new Vertex manufacturing facility. Building will have a 2 meg generator l…
Phase 2 of 2: Install a 3000amp service in an existing space to facilitate a new lab space & offices for a new Vertex manufacturing facility. Building will have a 2 meg generator l…
Installation of new tele/data cabling
43049P-VERTEX T1D FIT OUT-NEW LAB SPACE IN EXISTING BUILDING
Installation of BA security devices at Radius Bank 1 Harbor St STE 102 Boston MA 02210 (010-09220-02)
Fit-out of 33,872SF of warehouse space into manufacturing space, 14,226SF expansion of mezzanine level equipment area, new clean rooms, QC labs, material staging, office and staff…
Warehouse, Administrative Offices, Bank, Laboratories, And Manufacturing;Certificate For Clean Room Manufacturing;Space with Supporting Technical AreaALT1395363 Issued 12/14/2022
Wire Conical Dryer and Oven Class 1 Div 2 In Room 137 Install 2 dedicated 480V 30A 3 Phase circuits and wire two control Panels and sensors in Room 149
Temp Fire Alarm during construction for pull stations, module and heat detectors.
43049P-VERTEX T1D FIT OUT-NEW LAB SPACE IN EXISTING BUILDING
Installation of wiring devices, horn/strobe units, light fixtures, and breakers. Installation of interconnecting control wiring for the Vertex Glatt equipment.
Install 9 data lines for signal lights on the first floor
Demo of existing warehouse. Temp. lighting and construction power. Fitup of lighting, generators, switchgear and transformers
Performing enabling in 30,000sf warehouse space. Includes removal of existing materials, make safe, cut/cap MEPs, spray fireproofing, and rough work pending long form permit ALT147…
Add 2 emergency stop switched to existing hot water heater
Install seven 2-Port Data drops in Glatt Coating Room and Tech Space. Install ceiling data ports int he Glatt Tech Space.
Install three horn/strobe units, four control modules and a multi voltage relay device in the Glatt Room/Tech Space
Remove compromised hot water heater and replace with new heater.
Disconnect 120v circuit feeding and existing gas hot water heater to be replace and reconnect once complete
Elec app. Per BPDA approval 1-17-23 and engineer stamped plan, replace non-illuminated existing blade with new projecting blade sign @ 30" x 30". To read: 1 Harbor Street.
Wire 400A 3 Phase 480V Circuit for roof top Chiller with isolation transformer
Install Delta HVAC Controls / Building Automation System for Albireo Energy @ 1 Harbor St. Boston MA 02110
Install Delta HVAC Controls / Building Automation System for Albireo Energy @ 1 Harbor St. Boston MA 02110
T21291- To provide temporary power to owners critical loads during preventative maintenance utility outage. We will have it there for up to 1 week. And the work will be located on…
Renovation of an existing 1,500sf storage room into a clean room manufacturing space, with a supporting technical area for the MEP manufacturing equipment.
Installation of wiring devices, horn/strobe units, light fixtures, breakers, and one distribution panel for the Vertex Glatt System. Installation of interconnecting control wiring…
Renovation of existing laboratory with new fixtures and piping (885486).
Installing (2) gas fired humidifiers with piping (885486).
We are performing interior demo in an existing 1,500sf storage room. This will include make-safe, cut/cap MEPs, demo for new door openings, and rough work in the upper Mechanical s…
Warehouse, Administrative Offices, Bank, Laboratories, And ManufacturingCertificate For Offices (2nd Floor)ALT1290533 Issued 3/7/2022