Building permit intelligence · Bellevue, WA
105 111TH Ave SE has 8 municipal building permits on file in West Bellevue. The latest recorded activity was a mechanical no plan review permit dated Jul 20, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 9 mapped permits within 500 m of this address.
A Single Family Residential New Structure None Project Involving (1 Ductless Heat Pump, 2 Fireplace Insert - Gas, 2 Dryer Exhaust Duct, 2 Stove or Cooktop, 1 Barbecue, 7 Bath Fan,…
A Single Family Residential New Structure None Project Involving (6 Toilet, 9 Bathroom Sink, 3 Dishwasher, 2 Clothes Washer, 2 Floor Drain, 6 Shower, Tub, or Combo, 1 Bar Sink, 3 K…
A Single Family Residential New Structure Electrical
A Single Family Residential Decommission Storage Tanks
A Single Family Residential New Structure Electrical Project Involving (1 Temporary Service)
9 mapped permits within 500 m, shown on the intelligence map above.
This address has 8 permit records in PropertyLabs' public history and is located in West Bellevue. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 105 111TH Ave SE is dated Jul 20, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 105 111TH Ave SE in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Single family home new construction, 21-132639. Includes right of way and storm connection. Does not include mechanical, electrical, or plumbing.
Demo and New SF construction
A Single-Family Replacement project installing {Furnace <= 100,000 BTU}
Mechanical No Plan Review · Jul 20, 2026