Building permit intelligence · Boston, MA
108-110 Mount Vernon St has 6 municipal building permits on file in Ward 5. The latest recorded activity was a short form bldg permit permit dated Jun 17, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 19 mapped permits within 500 m of this address.
South Elevation: Cut and point mortar joints. Replace bricks and various caulking. Paint fire escapes.
West Elevation (Alleyway): Various caulking. Cut and point mortar joints. Replace damaged bricks. Scrape, paint windows and trim. South Elevation (Left side): Various caulking. Cut…
sealant replacement, brick repointing, painting and minor patching of some sills/headers
Remove existing shower tile ,walls and floor tile leaving all ceiling and walls and subfloor remove existing tub replace with floor standing ,retile shower walls and floor and wall…
replacement of existing bathroom and kitchen fixtures
19 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Mount Vernon St with municipal permit records in Boston.
This address has 6 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 108-110 Mount Vernon St is dated Jun 17, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 108-110 Mount Vernon St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Complete electrical work as part of general construction. Kitchen Remodel, (2) bathroom remodels and replacement of existing devices and lighting throughout the residence.
Gas Permit · GAS · Jul 29, 2026