Building permit intelligence · Boston, MA
116-120 Brighton Av has 11 municipal building permits on file in Ward 21. The latest recorded activity was a electrical low voltage permit dated Jun 22, 2026. Permits at this address represent $500K–$1MM in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
running 8 speaker in the front dinning area. adding 30 camera and 15 cat6 internet drop
Install a 36'' x 36'' double-sided blade sign and an awning for the business
Modify existing sprinkler system per attached engineered drawings, for restaurant buildout under permit ALT1516486
Installation of new Kidde suppression system on individual bbg tables with electronic detection and manual acuation, also upgrade existing system to current code.
Re-work existing fire alarm system per attached engineer approved drawings, to suit tenant modifications to the space under permit ALT1516486
2 mapped permits within 500 m, shown on the intelligence map above.
8 other addresses on Brighton Av with municipal permit records in Boston.
This address has 11 permit records in PropertyLabs' public history and is located in Ward 21. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 116-120 Brighton Av is dated Jun 22, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 116-120 Brighton Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Modify existing fire alarm system to suit new tenant, per attached engineer approved drawings.
fitting out this space for a Korean bbq restaurant . installing a whole new lighting system to the space. 20 new 20 amp circuit for the lighting. keep some exist outlet circuit but…
RENOVATION, RESTAURANT BUILD AS PLAN.
RENOVATION, RESTAURANT BUILD AS PLAN.
2.15.24 UPDATED;Description of work;BY ARCHITECT:;;Change of occupancy of the structure from Autobody and existing restaurant w/takeout and live entertainment use to Autobody and R…
Interior non structural selective demo : drop ceiling, bar counter remove, kitchen equipment, floor tiles and panels.