Building permit intelligence · Boston, MA
12 Channel St has 136 municipal building permits on file in Ward 6. The latest recorded activity was a intren permit dated Jul 23, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Renovations - Interior NSC
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
1 mapped permit within 2 km, shown on the intelligence map above.
This address has 136 permit records in PropertyLabs' public history and is located in Ward 6. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 12 Channel St is dated Jul 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 12 Channel St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
City of Boston
City of Boston
City of Boston
City of Boston
City of Boston
Fire Alarm
Electrical
Electrical
Low Voltage
Low Voltage
City of Boston
City of Boston
City of Boston
City of Boston
Electrical
Electrical
City of Boston
City of Boston
Fire Protection/Sprinkler
Plumbing
Plumbing
Fire Alarm
Electrical
Electrical
Fire Alarm
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
City of Boston
City of Boston
Electrical
Electrical
Other
relocate new sink and associated plumbing connections
Actual Job site address is 11 Channel Street There are currently 2 tenants be fed by 2 breakers and 1 meter we are adding a meter to break up the units electrical bills
City of Boston project for BDPA department, new offices, conf rm, finishes, new/reworked MEP's, FA/FPFee waiver BPDA project
BPDA Suite 605 Interior Fit-Out. Install new notification devices
BPDA Suite 605 Interior Fit-Out
BPDA Suite 605 Interior Fit-Out. Demolition of existing electrical and lighting and installation of new
renovation to bathroom
rough drainage plumbing only for 3/4 bathroom on 9th floor for city of Boston planning office
site mobilization for new City of Boston project, layout removal of existing partitions,finishes. Full permit in 2 weeks when design/budget is complete
Repairs to loading dock platform and roofing replacement for canopy; new handrails and stair treads, toilet room modifications to meet ICC/MA building and MAAB accessibility codes.
Provide & Install 1-3" C with (2) New 100A Single Phase Feeders from existing Distribution Panel to new Dual Port EV Charger in Parking lot.
soil borings in parking lot and drive aisles
Low voltage only, power wiring by others. Thermostat wiring for two loading dock heaters, three rooftop units and eight valve boxes, thirteen thermostats in total
Remove a rusted conduit to the fire pump and replace
Roof recover project
Low voltage temperature control wiring
Install fire devices for stairway pressurization
Stairway pressurization. Provide power to VFD and install 2 lights
On the northeast corner of the building installation of a 18' x 91' metal screen with lettering at the top and a freestanding lettering at the front edge of the canopy below. Assoc…
Improvements to 5 existing stairs including a new stair pressurization system, mechanical, electrical &; fire protection, selective demolition &; abatement, repairs at roof &; wall…
2 Air handlers
Replace existing elevator recall devices
9th floor- replace 25 fluorescent fixtures with 25 LED fixtures. Install 12 new 120 volt receptacles. Install 2 circuits to feed office.
Installation of new HVAC system on the 9th floor for BPDA
Alt permit being applied for sprinkler work at 12 channel st 5th floor renovation project. plans indicate Mechanical and electrical work arch finishes; Short form permit 1451172 is…
Elevator modernisation to address equipment obsolescence and excessive wear to meet current safety regulations.
Abatement, removal of old mechanical equipment and window and doors replacement
Furnish and install complete Electrical power wiring package associate with the 5th floor HVAC Upgrade and Office Fitout. Including New Lighting, Relocation of Transformer, new pow…
Restaurant36A, Offices, Light Manufacturing, Printing Plant, Photo Lab, Wireless Communications and Function; Space for 385 People.Certificate for Offices and Light Manufacturing S…
Office space renovation. HVAC, Electrical, Misc Carpentry, Painting
install kitchen sink, point of use 120v water heater, pump for drainage. Plumb water into office space, rough out water pipes Connect drain to pump to discharge kitchen sink into 2…
TRIN110 - provide electrician and labor for installing HVAC low voltage controls for (7) VAV's, (2) EF's, (11) motorized dampers, (3) AHU's
Installing 12 data locations in Suites 601/602.
Installed a new 100 amp 277/480 Volt switch on bus duct and new 100 amp panel.switch on bus duct and new 100 amp panel.
Addition of a mothers privacy room and a mechanical room slop sink to an existing office.
tenant upgrade to space Droplette
Upgrade fire alarm for expanded tenant space Droplette
Replacement of antennas and upgrade of equipment at existing wireless installation located on site
Installing 18 new devices in an existing space for new tenant - Mass Fallen Heros
Tenant improvements within two adjacent 6th floor tenant suites incl. installation of partitions for offices and meeting rooms, expanded open factory work areas with new lighting,…
Install security cables for future card access system
Mass Fallen Heroes - 12 Channel Street. Low Voltage HVAC Control Wiring. AG-220108
Mass Fallen Heroes Suite 603 demo, new power and lighting. Installation of new panelboards and transformer
Mass Fallen Heroes Suit 603 tel/data wiring
3 offices ,the rest is a print shop
#130 feet of 8' tall partion wall in a 10 foot ceiling. 3 5/8" metal stud with 1/2" drywall creating 3 office spaces and 2 10 foot long seperation partions 3 3' flat slab metal doo…
Renovation to existing office space. Includes installation of bathroom and kitchen fixtures & electric water heater.
1. Update electrical panel only 2. Update lighting and power
Install 3 phase 30 Amp circuit to compressor, install 30 Amp single phase circuit
BPDA-EDIC 12 CHANNEL STREET -PAYETTE ARCHITECTS- MODEL FABRICATION LAB- Open existing floor plan, minor mechanical and electrical upgrades to existing systems. No fire alarm or fir…
6th Floor Demo and temporary light fixtures
2 security devices on the 1st floor of 12 Channel Street
Removing and replacing (3) antennas, and installing: (3) Remote Radio Units; (3) quadplexers, and (3) 6x12 hybrid cables and removing/replacing (1) equipment cabinet, and adding (1…
12 Channel St. It’s a city of Boston job. 15-20 dual data locations for the transportation dept. 1st floor
provide supports and inspection of UL listed furniture feeds.
Ground Floor. Selective lead paint abatement; Selective demolition; New office space including storage space, breakroom, accessible toilet upgrade; New acoustical partitions; New s…
13,765 sf office fit out will include heating ventilation and air conditioning upgrades, new electrical and lighting, bio-based tile flooring, plumbing fixtures, interior storm win…
Selective lead paint abatement; Selective demolition; New office space including storage space, breakroom, accessible toilet upgrade; New acoustical partitions; New suspended ceili…
9 th floor 13,765 sf office fit out will include heating ventilation and air conditioning upgrades, new electrical and lighting, bio-based tile flooring, plumbing fixtures, interio…
low voltage data and telephone wiring
reservation of an office spaces for offices
remove and relocate fire alarm smokes and speakers add smokes and speaker strobes perform testing
City of Boston: 12 Channel Street 9th Floor Office building plumbing renovations.
renovation to 12 channel street office / workstation area suite 105
Operations Center: Provide control interlock wiring for 2 ERVs and 11 VRFs. All work is low voltage
Replace 3 existing antennas with 3 new antennas on the roof of the building within existing flue canisters, relocate existing equipment as needed, add appurtenant equipment per pla…
renovation to 12 channel street suite 105 office /workstation areas
12 Channel Street Operations Center plumbing renovations.
With in Unit 506 build out replica guestrooms to support the Haymarket Hotel (ERT923956) & the completion of design and coordination. The intent is to modify the leased space elect…
Interior office fitout in unit 603. No fire alarm, sprinkler, or egress change, no life safety alterations. Interior office fitout only. accurate dollar amount will be reconciled a…
AT&;T: Add 3 new panel antennas to existing wireless facility mounted on roof of building. New antennas will be at same centerline height and adjacent to the 9 existing antennas. A…
Restaurant #36A, Offices, Lt Mfg,Printing Plant, Photo Lab, Wireless Communications and function space for 385 people Certificate for the 2nd floor Offices ALT960165 issued: 7/15/1…
Upgrade T-Mobile Sub-panel to 200A
Installation of (198) Cat5e cables for tel/data outlets
Mass Robotics, low voltage HVAC control wiring - AP, 186582
tenant fit out for massrobotics
mass robotics - 2nd Floor - Scope of work consists of a tenant fit-out of the second floor space at 12 Channel Street in Boston. The work includes new, non-structural partition wal…
Install new and reuse existing addressable fire alarm system
New and reuse existing addressable fire alarm
Demo existing level 2 space for new power , lighting and some fire alarm
Demo existing level 02 space for new fitout work. Demolition consist of concrete ramp, doors &; frames, CMU wall, windows, wall, plumbing fixtures, ceiling, remove and replace rubb…
Restaurant #36A,Offices, Lt. Mfg., Printing Plant, Photo Lab, Wireless Communications and Function Space for 385 people Certificate for 9th floor Offices - Only ALT898125 issued 12…
relocate/add several fire alarm devices for the new 9th floor layout.
Installation of CCTV security device at Gentex Corporation 12 Channel St Suite 9 Boston MA 02210 (8-61065-03)
Removing and replacing (3) antennas and (3) radios on wireless communication facility.
Installation of Access security device at Republic Building Contractors Inc 12 Channel St 9th Floor Boston, MA 02110 (8-61065-02)