Building permit intelligence · Boston, MA
122 W Concord St has 19 municipal building permits on file in Ward 9. The latest recorded activity was a extren permit dated Feb 17, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Renovations - Exterior
Renovations - Exterior
Renovations - Exterior
Renovations - Exterior
Gas
Renovations - Interior NSC
1 mapped permit within 2 km, shown on the intelligence map above.
12 other addresses on W Concord St with municipal permit records in Boston.
This address has 19 permit records in PropertyLabs' public history and is located in Ward 9. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 122 W Concord St is dated Feb 17, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 122 W Concord St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Renovations - Interior NSC
Renovations - Exterior
Work to include installing three (3) new windows in existing locations, as well as, installing a new double French door in an existing locations, all at the rear of the building.
Wire 2 bathrooms, 1 hallway and 1 master bedroom.
remodel of second floor 2 toilets 2 sinks 1 tub 1 shower
Unit #1 work including direct replacement of finishes of Master Bathroom and Guest Bathroom. New plumbing fixtures, light fixtures, tile, vanity and stone countertops. No structura…
Relocate Stove
Rewiring garden level remodel of kitchen dining and loving rooms.
Remodel kitchen and bath.
The garden level of the unit will see the Kitchen and Powder Room upgraded. The Kitchen will receive new cabinetry, tile back splash, stone, counter tops and appliances. The Powder…
install 4 110 volt smoke detectors in front hallway
repoint fronf of building