Building permit intelligence · Boston, MA
1245 Adams St has 163 municipal building permits on file in Ward 17. The latest recorded activity was a electrical permit dated Jul 21, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 5 mapped permits within 2 km of this address.
Electrical
Low Voltage
Electrical
Electrical
Low Voltage
Electrical
5 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Adams St with municipal permit records in Boston.
This address has 163 permit records in PropertyLabs' public history and is located in Ward 17. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1245 Adams St is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1245 Adams St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Plumbing
Plumbing
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Gas
Gas
Plumbing
Gas
Gas
change out existing recessed lights, fans and run a dedicated 20 amp circuit for jacuzzi tub in main and common bath
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Plumbing
Plumbing
Electrical
Electrical
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Plumbing
install receptacles, wire disposal - Building permit SF1538867
Replace exising countertop and add cabinetry - to include plumbing and electrical
1 REPLACEMENT WINDOW
island remodel, under cabinet lights
remodel of bathroom in unit B604
Replacement of Shower Fixtures, vanity and top, new shower glass doors
FIXTURE REPLACEMENTS, KITCHEN SINK, DISH WASHER, DISPOSAL, AND LAV SINK, NEW STOPS, FAUCETS.
Remove existing cabinets. Install new cabinetry. Install kitchen appliances . Install new kitchen sink and dishwasher.ALL WORK BEING DONE IN UNIT D608
Dishwasher Swap
Unit B207 - Kitchen renovation
Remodel kitchen. Remove old cabinets and install new cabinets and countertop.
Extension of existing loft space in unit B603, work to include structural framing and addition of (2-3) sprinkler heads FA device as needed
Sixty (60) Residential Units Certificate for Unit #102 only; ALT835852 issued 12/18/18, SF829242 issued 5/11/18
replace 4" PRV AND MOP SINK
Replacement of two risers from CPVC to copper, 1st floor to 6th floor.
Work to be performed in condominiums as follows: #101, #104, #201, #204, #304. Replacement of 5 toilets, 5 lavatories and 5 dishwashers.
water damage in unit walls demoed wiring to be checked for water damage outlets ,switches and light fixtures to be replaced in damaged area
replace outlets on damaged wall
replace 4 outlets on wall where sheetrock was removed
replace outlets, switches light fixtures in water damage area wiring checked for water damage in damaged area
replace outlets switches and light fixtures wiring tested for water damage
replace outlets ,switches, and light fixtures in water damaged area wiring tested for water damage
replace outlets, switches and light fixtures in water damaged area wiring checked for water damage
replace outlets , switches and light fixtures in water damaged area wiring checked for damage
Installation of 4 domestic boilers and 2 domestic hot water heaters.
Installation of 4 domestic boilers and 2 domestic hot water heaters. These were installed in the basement of 1243 Adams St, Dorchester.
Painting the entire inside of the unit. Paint cabinets. Replaced counter tops. Remove Laminate floor. Install 3/4 inch subfloor. Install and finish hardwood floor.
Renovations to Water Damaged Unit, including, painting, plumbing, drywall
Renovations to Water Damaged Unit, including electrical, painting, tiling, plumbing, flooring, drywall
Renovations to Water Damaged Unit, including electrical, painting, drywall
Renovations to Water Damaged Unit, including electrical, painting, tiling, plumbing, flooring, drywall
Renovations to Water Damaged Unit, including electrical, painting, drywall
Renovations to Water Damaged Unit, including electrical, painting, tiling, plumbing, flooring, drywall
Renovations to Water Damaged Unit, including electrical, painting, tiling, plumbing, flooring, drywall
Renovations to Water Damaged Unit, including electrical, painting, tiling, plumbing, flooring, drywall
1st floor Unit # 101 Renovations to Water Damaged Unit, including electrical, painting, tiling, plumbing, flooring, drywall.
Remove and reinstall fixtures for new tile work. Install new shower valve
Install of 6 outlets and 2 switches.
Replace 5 smoke detectors and relocate 1 horn/strobe
replace kitchen counter receptacles and disposal and dishwasher
demolition of interior ceilings, walls and floors in units 404, 301, 203, 202, 201, 102
Removal of; water damaged walls, ceilings and floors. Work in units 101,104,204 &; 304 No new lay-out. Another permit to be secured for remodeling.
unit # 306 Kitchen Remodel
Completion of unfinished loft and addition of stairs to access the loft.
Work to be completed in Unit #102 only - Light gauge metal framing, drywall, electrical, HVAC, plumbing, relocation of sprinkler heads and relocation of smoke detectors and strobes…
Modify existing fire alarm and local smoke detectors. Relocate system speaker strobe. Reinstall devices per drawing by JB Engineering.
Replacement of dishwasher
kitchen upgrades
Finish work two bathrooms and one kitchen
Modify existing fire alarm and local smoke detectors. Relocate system speaker strobe. Reinstall devices per drawing by JB Engineering.
Unit CH 2-Replace existing kitchen cabinets
shower remodel
Anticipation of permit #ALT835852. Cost reflected on ALT835852
Modify the existing fire alarm system by relocating smoke detectors and speaker strobe detector.
KITCHEN AND 2 BATHROOMS REMODEL
unit 102 - installing kitchen sink - disposal - dishwasher - 2 lavs -2 water closets - 2 showers and 1 soaking tub
install kitchen cabinets.
Remove and replace floor/wall tile. Remove and replace shower/toilet plumbing fixtures. Paint walls ceilings. This is for both bathrooms in the unit
Replace a toilet and sink
replace kitchen sink, vanity
Unit 102- Removing interior finishes;of the;kitchen, bathroom, flooring;and interior non bearing partitions for exploratory. Alt to be filed.
Relocate plugs in bedroom/living room wall. Add outlets in island for microwave and cooktop. Relocate switch in guest bedroom. Add electric floor heat in bathrooms
Install box for dryer in laundry room and do finish work in laundry and bathroom in #204
Replace kitchen cabinets,replace bath vanity.Construct two small walls and extend ceiling sofitt.Relocate electrical outlets. New flooring and painting.; Unit #409.
Put back some blueboard that was removed due to water damage Install tile around bathtub to match existing tile Reinstall vanity Lay down new linoleum tiles in bathroom and laundry…
due to damage from fire and water - remove drywall from behind stacked washer/dryer. Inspect wire and device - replace 30A outlet and device box.
Replacement of one kitchen sink install new dishwasher re-install existing garbage disposal
Removing all the existing cabinets and installing new Ikea cabinets and counter tops Unit B603
replace toilet , lav sink, kitchen sink and shower unit
add outlets and lights
installing non structual walls to add office and den
Frame interior partition walls. Gypsum board and plaster.
install 12 120 volt outlets 6 switches 2 fan lights and 4 lights 3 new branch circuits in loft
replacement kitchen lav tops
adding in undercounter lighting and crown lighting
Kitchen & Bath remodel
supply and install new Reznor gas fired roof top unit
Remove existing bathroom fixtures and sheetrock from walls and ceilings all plumbing fixture to remain in same original place install new shower, durrock , blueboard and plaster. i…
replace shower valve, replace toilet and lavatory
Add receptacles and lighting to existing bathroom and kitchen
remodel kitchen and bathroom
Removal of kitchen cabinets and appliances, installation of new cabinets and appliances. Including associated plumbing, rough/finish. New flooring, new lighting, and painting. Mast…
retest 2" gas line basement garage
Relocate HVAC Whalen Unit due to Interior Renovations. Building Permit # SF571638
Relocate HVAC Whalen Unit due to Interior Renovations. Building Permit # SF571635
install 20 amp dedicated circiut for washing machine. Install arc fault/gfi breaker in panel.
Unit 602: Relocate 1 fan coil unit, 1 four-gang switch and 1 outlet Unit 607: Relocate 1 fan coil unit, 1 four-gang switch and 1 outlet
Interior renovations to Unit 602 including loft access.
Interior renovations to Unit 607 including loft access.
60 Res Units #1536/2008; Certificate of Occupancy for;unit #609 only SF452605, issued: 3/18/15 &; ALT474708, issued: 10/30/15
Wire for and install 5 x 120 volt smoke and smoke/Co detectors, also; remount low voltage horn/strobe boxes and relocate wiring
In unit#609; metal and wood stud framing on both levels, structual framing over master bedroom and kitchen, structual plans attached, install wood framed staiscase to second floor,…
Wire a new bathroom
remodel 6th floor room 601 "plumbing"
Renovation of Bathroom, including new flooring and bathroom fixtures. Suite 506
Bathroom Construction. Including new walls, plumbing and fixtures. Suite 601
Interior renovation to Unit # 605. Stairway to mezzanine storage. Closet and storage loft. Cost on SF # 464504,sprinkler in closets
Complete wiring of renovated unit
Unit 605 Minor demo. New lights and outlets
Interior renovations to Unit # 605 Upgrade interior from rental to condominium sale.
Demo existing walls, doors and frames. Demo existing kitchen, existing bathrooms, existing flooring. Supply and install rough plumbing, rough electrical. Supply and install all new…
renovate 4 bathrooms and kitchen
Make safe and restore power following a domestic hot water pipe break at the 5th floor common area.
Remove all unwanted finishes as noted on plans dated 12/2/2014. Includes removal of Flooring, cabinets, countertops, plumbing fixtures (not salvaged), electrical fixtures (not salv…
Rewire new kitchen layout as needed. Relocate laundry appliances.
Replace kitchen cabinets and counter. Re-tile guest bathroom and laundry. Install new wood floors. Upgrade lighting. General finish upgrade and painting
Renovating kitchen and bath
unit 203f New kitchen cabinets New bath fixtures and tile Paint throughout widen bedroom door replace closet bifolds
Install a seperate 120/240 volt, 100 amp, single phase service for an access control gate to the property from the Central Ave driveway. The NStar work Order number is #1786910.
Furnish and install all telephone, cable TV, data, and security wiring
Furnish and install a new fire alarm detection and notification system.
Install Low Voltage DDC system for Automatic Temperature Control for Boilers & HVAC system
Short Form Bldg Permit · SOL · Jul 20, 2026