Building permit intelligence · Minneapolis, MN
1256 Penn Ave N has 41 municipal building permits on file in Near - North. The latest recorded activity was a mechanical permit dated Feb 4, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
ComMFDNR
ComMFDNR
ComMFDNR
ComMFDNR
Interior Remodel - 5th Floor certificate of occupancy required: no special inspections required: no const type: 2A occupancy: B 2020 MSBC sprinklered: yes architect: Edward Kodet I…
Relocating existing chilled beams for new layout and add one new chilled beam and connect to existing piping per approved plan.
4 mapped permits within 500 m, shown on the intelligence map above.
7 other addresses on Penn Ave N with municipal permit records in Minneapolis.
This address has 41 permit records in PropertyLabs' public history and is located in Near - North. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 1256 Penn Ave N is dated Feb 4, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1256 Penn Ave N in the PropertyLabs platform, along with alerts when new permits are filed at this address.
FOR SUMMIT ACADEMY/SUITE 4200 - DEMO AND RELOCATE SINK
Summit Academy TI certificate of occupancy required: no ***** special inspections required: no***** const type: 2A ***occupancy: B ***2020 MSBC***** occupant load: 147 ***** sprink…
Reconfiguration of HVAC system including supply diffusers, return grills and all associated duct work. Reusing existing water source heat pump. Refer to attached drawings.
CONVERT MAIN FLOOR RETAIL SPACE TO OFFICE SPACE B occupancy. II-A fully sprinkler. Fully accessible. No SAC. No CO
ELECTRIC WATER HEATER, FLOOR DRAIN, RESTROOM SINK, TOILET, BREAKROOM SINK
CODE REVIEW FOR DHS LICENSE OF EXISTING TENANT SPACE STE 5300. NO WORK REQUIRED. OCCUPANCY B.
3 ton heat pump dutwork chilled water piping, exhaust fans.
Refer to Attached drawings.
3 of 3 mech permits for this addy submitted8/23/18 5th floor build out suite 5300 HHS/Swing space.
2 of 3 mech permits for this addy submitted8/23/18 Refer to attached drawings.
TENANT BUILD OUT SUITE 5100 (MAA #02) certificate of occupancy required YES mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance su…
TENANT BUILD OUT AT SUITE # 5400 (MAA) certificate of occupancy required YES mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance s…
TENANT BUILD OUT #4300. (JJL) certificate of occupancy required: no mechanical plans required for certificate of occupancy NA mechanical plans/letter of means of compliance submitt…
BATHROOM
12 fixtures
electric water heater and 2 other-sinks
MINOR REVISIONS ON 4TH FLOOR FROM PREVIOUS PLAN AND PERMIT TO INSTALL CORRIDOR WALLS AND TENANT DOORS AT 2 LOCATIONS. (DMH#1) Const type: Occupancy: B 2015 MSBC sprinklered: YES 20…
Install 3 heat pumps and ductwork.
(4) FAN COILS/DUCT/GRID per engineered drawings -1st floor level
FOR 1ST FLOOR/FINANCIAL ADVISOR - BREAK/REST ROOM(S)
FOR 1ST FLOOR/FINANCIAL ADVISOR - BREAK/REST ROOM(S)
Build Wealth- 1st floor tenant office Build out (MAA#1) certificate of occupancy required YES. Newly occupied tenant space. (See attached bulletin) mechanical plans required for ce…
BUILD-OUT TO APPROX. 6,340 S.F. TENANT SPACE FOR FITNESS CENTER. (DMH#1) INSTALL NEW PARTITION WALLS FOR RECEPTION AREA, 1 OFFICE, OPEN LOCKER SPACE AND 3 SINGLE USER SHOWER AND RE…
3th Floor heating and ventilation Chilled beam piping and ductwork per engineered drawings
FOR 3RD FLOOR - 2 DISHWASHER CONNECTIONS, 2 KITCHEN SINKS AND FLOOR DRAIN
OFFICE SPACE ON LEVEL 3. certificate of occupancy required yes mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ cons…
buildout approximately 15,000 sq ft of office space on third floor. sck#1 certificate of occupancy required yes mechanical plans required for certificate of occupancy mechanical pl…
Install the following HVAC equipment:(All Hydronic, HW and Chilled water) 15 finn tube, 5 cabinet unit heaters, 1 unit heater, 5 fan coils, 40 chilled water beams, 4 in-line fans,…
LEVEL 3 TENANT IMPROVEMENT/CHILLED BEAMS & FTR PER ENGINEERED DRAWINGS
FOR LEVEL 3 TENANT IMPROVEMENT - HANDWASHING SINK, TOILET, LAVATORY, SHOWER, KITCHEN SINK, AND FLOOR DRAIN
INSTALL 4 TEMPORARY HEATERS AT ONE MILLION BTU EACH
SUPPLEMENTAL WORK AS FOLLOWS: ALL PERMANENT GAS PIPING SHOWN ON PLANS, HYDRONIC PIPING AT MAIN RISERS (THROUGH FLOOR VALVES), MECHANICAL ROOM PIPING, ROOF PIPING AND HYDRONIC MECHA…
MIXED USE BUILDING, PARKING GARAGE WITH OFFICE SPACE AND RETAIL (MAA#01) CERTIFICATE OF OCCUPANCY REQUIRED: YES CONST TYPE: II A NUMBER OF STORIES: 5 OCCUPANCY: A3, B, M, S2 2015 M…
FOOTING AND FOUNDATION PERMIT FOR FUTURE BUILDING. (MAA #01) CERTIFICATE OF OCCUPANCY REQUIRED CONST TYPE: II A NUMBER OF STORIES: 5 OCCUPANCY: A3, B, M, S2 2015 MSBC SPRINKLERED:…