Building permit intelligence · Boston, MA
130 Commonwealth Av has 12 municipal building permits on file in Ward 5. The latest recorded activity was a intren permit dated Jul 22, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Renovations - Interior NSC
Single Family Dwelling COO for Single Family Dwelling ALT514701, issued: 10/8/2015 &; SF453973, issued: 3/16/2015
We are running gas lines for (4) log set units. We are reconnecting (2) gas stoves, (2) dryers, (1) grille, not running gas piping for this, just reconnect
New steel posts and W8x24 beam on ground floor. New wood post, and W8x15 on first floor. (2) new W8x31 columns, new W8x15 beam, new W12x16 beam, new W10x15 beam. Steel work shown o…
We are working on the master bathroom remodel
1 mapped permit within 500 m, shown on the intelligence map above.
12 other addresses on Commonwealth Av with municipal permit records in Boston.
This address has 12 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 130 Commonwealth Av is dated Jul 22, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 130 Commonwealth Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovation consisting of lighting and power
Low Voltage Wiring TV/Telephone/Networking/Stereo/Shading
For the installation of a low voltage fire and carbon monoxide alarm system.
For the installation of alarm system
Renovation of interior to consist of new bathrooms, kitchen, gym, glass railing/walls, framing, tile, paint and wood floor re-finish. Modification of electrical and HVAC to new lay…
Photo Shoot for commercial. Install Temporary tow behind Generator on the street for power distribution to Lights and cameras. Install March 26, 2013 for One day. Dave Norcott (508…
Remove interior connecting;door between 130 Commonweath Ave and 132 Commonwealth;Ave;unit #9;and in-fill portal with 2-hour fire rated assembly.