Building permit intelligence · Bellevue, WA
13630 SE Allen Rd has 68 municipal building permits on file in Eastgate. The latest recorded activity was a electrical no plan review permit dated Jul 21, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
A Nonresidential Repair or Replacement Electrical Project Involving (1 HVAC Equipment - Outside)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test), N/A
Install replacement ductile iron water mains, fire hydrants, water services and water system appurtenances and abandon in place most of the existing AC water main, in the right-of-…
Park in ROW to remove bare poles. See original permit 16 127124 TJ.
4 mapped permits within 500 m, shown on the intelligence map above.
This address has 68 permit records in PropertyLabs' public history and is located in Eastgate. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 13630 SE Allen Rd is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 13630 SE Allen Rd in the PropertyLabs platform, along with alerts when new permits are filed at this address.
1" irrigation water meter Drop-in in a CIP-installed 1.5" service line and setter. Service for a public ROW project. ROW landscaping planter/ irrigation will be maintained by Parks…
Installing PV system on rooftop
This project will install sidewalk and landscaping planter on the west side of 138th Ave SE between SE Allen Road and SE 40th Street including crosswalks and associated curb ramps…
This project will install six foot wide sidewalk with planter on the west side of 138th Ave SE (from SE Allen Rd to SE 40th St) along the Tyee Middle School frontage. The project a…
A Nonresidential Repair or Replacement Electrical Project Involving (1 Temporary Service)
A Nonresidential Repair or Replacement Fire Alarm Transmitter
EXT (11/27/17 kb). Install 1 recloser & 3 GOP switches. Replace poles P4, P5, P6 & P7 & remove OH wire as shown on attached work sketch. ANY TREE TRIMMING MUST NOTIFY HOMEOWNER 48…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (54 Telecommunications System), NW side of the campus
Add (33) devices to 4 new portable classrooms (P1 P2 P3 P4) at Tyee Middle School. Will tie in to existing fire alarm system. Joint venture between SimplexGrinnell & Scott's Electr…
Electrical and low voltage services for 4 portable classrooms
Installation of 4 new portables, north west of school.
Underground conduits only - service and fiber, fire, intercom, and security (On Waiver list)
A Non Residential Alteration to Existing Structure Project Installing {13 Telecommunications System}
Replaces expired 09-130730 UE.
A Non Residential Alteration to Existing Structure Project Installing {10 Security System}
Install refrigeration equipment (walk in coolers).
Upgrading existing soccer field by removing existing concrete curbs and utilities and installing new pathway, concrete curb, bleachers and turf.
Construct Middle School.
Install three (3) new PSE 30' Class 4 wood poles, downgrade wattages on two (2) existing poles, install new light on one (1) existing pole, and run 390' of #2 OH tpx. Portion of wo…
Install fire suppression system.
Install low voltage security system.
A Other Alteration project installing { Low Voltage Data Cable System }
Install (50) T-Stats.
Installation of voice and data systems.
Install (1,364) heads on new system.
Grease Interceptor 2500 gallon
Install sprinkler underground piping.
Demolition and construction of middle school, some frontage improvements for all holidays with typical weekend construction noise hours and early/late finish (6am to 8pm) on rare o…
Detention vault for new school facility.
Install (461) devices on new system.
Install 1 gas water heater, 1 generator, 1 HVAC complete system, 1 radiant heat. Added Ref for walk in coolers.
Add and relocate Utilities for new school and community gym remodel. Storm is 2010 Code and Standards.
Install per fixture list.
Demo of existing school and construction of new school and community gym remodel.
Replacement of school building and related site improvements with new building, parking and utilities.
Haul route, frontage improvements, and storm drain crossing (Allen Rd) for demo/rebuild of middle school building and parking lot. With revisions to this right of way permit, addit…
Install complete new system.
Install 1 building mounted ext ltd sign @ 25 sq ft and 1 freestanding ext ltd sign @35 sq ft.
Demo and rebuild middle school.
Demo and construct new 120,000 sq ft two-story middle school. 4 new lower tennis courts. 35% submittal.
Preapplication conference date of 02/19/2009 @ 1:30pm. Modernization of facilities.
4048 134th Ave SE; Conversion from Septic
4160 134th Ave SE; Conversion from Septic
4040 134th Ave. SE; Conversion from Septic
4030 134th Ave. SE; conversion from septic
Application to provide sanitary sewer service to 14 single-family residences by extending the City's sewer infrastructure. Proposed sewer extension will impact protected slope and…
Application for Critical Areas Land Use Permit to provide sanitary sewer service to 14 single-family residences by extending the City's sewer infrastructure. Proposed sewer extensi…
Install sprinkler system with 10 sprinkler heads.
Placement of (2) portable classroom buildings.
Transport 2 piece modular school 13'6" x 14' 8" x 32' building from Kelsey Creek & 2 mobile units 14L x 15 W x 16'1" H from Interlake School both units going to Tyee Middle School.…
Install (2) 200amp for portables.
Placement of portable classroom units at an existing middle school.
Add/Relocate 21 heads
14 devices
Install telecommunications/data cabling
Install low voltage wiring to control panels.
Small classroom remodel with new lights, outlets and adding 59.52 amps.
See fixture list.
(2) Unit Ventilators, (1) Fan Coil Unit and (3) Exhaust Fans.
Addition and improvements to existing classrooms. Convert two classrooms for use as middle school science classrooms and connecting prep room.
Conference date: 3/25/04 - Existing school is proposing to expand two classrooms and improve them for use as science classrooms.
Chemical based fire suppression system