Building permit intelligence · Boston, MA
142 Chestnut St has 37 municipal building permits on file in Ward 5. The latest recorded activity was a roof permit dated May 14, 2026. Permits at this address represent $500K–$1MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 2 km of this address.
Roofing
Roofing
Electrical
Electrical
Plumbing
Plumbing
3 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Chestnut St with municipal permit records in Boston.
This address has 37 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 142 Chestnut St is dated May 14, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 142 Chestnut St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Disconnect and reconnect (3) rooftop units.
Interior/Exterior Work
Plumbing
Renovations - Interior NSC
- Guest bath renovation - 2nd floor
Renovations - Exterior
Change Occupancy
Fire Alarm
Change Occupancy
Speaker & Data Cable
3rd Floor - Return Unit from Single Unit back to original layout of Two Units.;;;;;;;;;;;;;E- Plans
New Rough-in for a Kitchen, Laundry and Full Bathroom
Bathroom Remodel
up dating three piece bathroom in unit #4
Guest bathroom remodel.
Split up unit #7 from unit#8-9. #7 Add 3 plugs & relocate entry switches. #8-9. Wire new kitchen, bath and laundry. Relocate entry switches. Wire for new bedroom , closet and hvac.
;Renovation of Unit 7 and 8/9; (interior work).
INSTALL 3 WINDOWS INTO EXISTING OPENINGS
Install 5 windows into existing openings
installing 2 windoes
Slite relocation of 3 existing devices, Due to renovations
(13) Family Dwelling c/o-For Unit #7 -only 02-5905, issued 2/20/08, 1742 2/5/2009
Renovating bathroom
Bathroom Renovation.
wire condo unit on third floor and add to existing unit
Remodel existing master bathroom including plumbing fixtures, electrical fixtures, tile, plaster and paint. New trim in the adjascent bedrooom as well as plaster repairs and new pa…