Building permit intelligence · Boston, MA
15 Hecla St has 8 municipal building permits on file in Ward 15. The latest recorded activity was a side permit dated Sep 14, 2023. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Siding
First Floor wire for one quad and two duplex receptacles in middle and rear bedroom on one arc fault circuit. Install new fixture box and reinstall light fixture in bedroom.
wire for four (4) 120volt smoke detectors and two (2) 120volt smoke/carbon detectors in each unit wire for six (6) 120volt smokes in the public stairwells and one (1) 120volt smoke…
wire for five tv points in unit #2 and five tv points in unit #3
rewire Units #2 and #3 Kitchen,bathroom,dining and four bedrooms in each unit Wire front and back stairwell lights and smokes Install public meter and public panel
2 mapped permits within 500 m, shown on the intelligence map above.
10 other addresses on Hecla St with municipal permit records in Boston.
This address has 8 permit records in PropertyLabs' public history and is located in Ward 15. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 15 Hecla St is dated Sep 14, 2023. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 15 Hecla St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
replace plumbing fixture full bathroom on third floor and kitchen sink, replace new hot water heater and forced water boiler replace steam boiler on second floor
replace steam boiler for unit#2 repace forced hot boiler for unit#3
Unit 1, Painting. . Unit 2, Painting and Cosmetic work. Change layout of non-load bearing walls. Update Kitchen with new appliances and cabinets. Refinish floors Unit 3, Painting a…