Building permit intelligence · Boston, MA
150 Seaport Bl has 115 municipal building permits on file in Ward 6. The latest recorded activity was a other permit dated Jul 8, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Other
Electrical
Electrical
Electrical
Electrical
Fire Alarm
1 mapped permit within 2 km, shown on the intelligence map above.
7 other addresses on Seaport Bl with municipal permit records in Boston.
This address has 115 permit records in PropertyLabs' public history and is located in Ward 6. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 150 Seaport Bl is dated Jul 8, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 150 Seaport Bl in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Fire Alarm
Electrical
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Gas
Gas
Gas
Gas
Fire Protection/Sprinkler
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Plumbing
Gas
Fire Alarm
Electrical
Change Occupancy
Low Voltage
Low Voltage
Combining and remodeling units 19C &; 19E. Remodeling work to include electrical, plumbing, sprinkler head adjustments to accommodate the new layout, board &; plaster, tile, millwo…
add outlets and switches and lights
Renovations - Interior NSC
Renovations - Interior NSC
Rework outlets, switches and recessed lights throughout. Add motorized shades throughout.
Addition of light fixtures locations in kitchen, study and bedrooms. Addition of outlets to serve televisions and window coverings.
Hang two Chandeliers in Unit 16-D
Unit 19F - Install additional outlets in bedrooms, living room and Laundry room. Relocate switch for powder room mirror and primary closet light. Add (2) wall sconce locations in e…
Gas
Plumbing
Renovations - Interior NSC
Gas
Plumbing
Demo make safe
Change of occupancy to combine 2 units into 1, the occupancy of the building will reduce from 114 units to 113.;Change floor plan to match proposed plan removing/adding few walls t…
Erect
Erect
Demolition - Interior
Electrical
Renovations - Interior NSC
Unit #7B- Relocate TV outlets in living room, Install light fixture in dining room, Install wiring for (2) ceiling lights in primary bedroom, Install wiring for closet light and sc…
Installation of Pre-Engineered Ansul Fire System per NFPA 17A, State and Local Codes.savr restaurant;
Install outlets in livingroom, ad relocate switches
Relocating of 3 sprinkler heads to accommodate tenant renovation in Unit #16E. Relocate one pendant and one side wall into the new soffit in the master bedroom. Remove and cap the…
Unit 6A - Install wiring for light fixtures in Living room and Den, Relocate outlets, and add 20amp circuit in Living room. Install wiring for two additional outlets in Primary bed…
Relocate three existing sprinkler heads
Unit PH2E - Install (5) new GFCI-protected receptacle circuits for pantry convenience receptacles and appliances
Custom Millwork Installation in Master Bedroom, Guest Bedroom, Den and Living Room.
Unit 16E: Install recessed light fixtures in bedrooms 1,2&3. Relocate light switches & convenience receptacles in the living room and bedroom 1 wall. Install an additional outlet i…
Replacing switches with radiora switches Add 6 new radiora keypads Add 3 lights in living room Add 1 light in bedroom Relocate 1 switch in living room Mount tv on wall in office
UNIT 12E: Adding soffits for lighting in 2 locations in the living room and one in the front bedroom, adding lighting, adding lighting control. Paint and wallpaper
• Provide rework of the bedroom and closet layout. • Provide framing, blueboard and plaster for dropped ceilings in Office #1 &; 2 for recessed lights. • Provide removal of existin…
Plumbing associated with shower
Unit 14B: Installation of (3) recessed lights in the master bedroom. Installation of decorative tape light at millwork in the master bedroom and living room.
We will be installing 3 tvs with Speakers. We will also be installing 8 shades.
Low voltage work for TVs, shades, speakers, network
Interior Renovations to Unit 14B. Removal of interior finishes for addition of built in cabinets with integrated lighting. Plaster & Painting. No change to egress or occupancy
Interior non structural framing of ceilings for electrical work by others. Blueboard, plaster and pant after electrical install.
remove a tub and install shower system, remove cuptle closet inserts and install new built on cabinets on the same location. Install built in cabinets on the bedroom 2, install a g…
Add/replace lighting, switches and outlets
Replacing existing fixtures and upgrading devices in kitchen and bath. All circuits commencing work shall have AFCI/GFCI Protection..
150 Seaport - SAVR. Low Voltage HVAC Control Wiring. AG - 221095
Replacing/upgrading/adding devices to kitchen area, installing recessed lighting and upgrading ocp safety devices
Remodel Suite 9E on the 9th Floor
Short Form application for interior renovation of residential suite at 150 Seaport Blvd, Suite 9E. Scope includes selective removal and upgrade of finishes such as drywall, floorin…
Apartment #5B. Replacement ceiling light fixtures, Addition of recessed lighting in Den and Bedroom 2
Rough wiring ONLY. Rough wire SAVR restaurant speakers and Cat6 data
Update fire protection drawings to show removal of coverage in half bathrooms in condo units per code and design. ERT766946
One day Owner event permit for 125 occupants. ERT766946Event on 09/22/2022; all day.
Savr Restaurant : Relocations and New devices per engineered drawings for new fit-out of Restaurant
Savr Restaurant ; New fit-out for Restaurant Space
Fitout of SAVR Restaurant Space
Fitout of SAVR Restaurant Space
installation of deluge systems on 19 balconies one on each floor
Installation of preaction systems
clarify ERT766946 and ALT 1182177 erect 22 levels, 3 below ground garage, 114 units, mixed use include Restaurant at L1, L2, and mezzanine, pools with amenity areas.No work associa…
Penthouse Fitout
Fitout of Penthouse
150 Seaport St. Security Residences. Misc. Low Voltage HVAC Control Wiring. AG 197530
Interior fit up of new restaurant consisting of interior partitions, floor, wall, and ceiling finishes, millwork, plumbing, sprinkler, HVAC, Electric, and fire alarm at 1st Floor,…
Install 55 DAS antennas and buildout 1 Main DAS room and instal power supplies in 5 IDF's
This Alteration is in conjunction with Permit ERT766946, scope is per submitted plans and language in permit alteration narrative dated 12/1/2020. Such scope consists of: added;Pet…
Gas Piping for Temporary Babfar Heaters.
Gas piping for temporary Babfar heaters/
150 Seaport - St. Regis Residences. Misc. Low Voltage HVAC Control Wiring - NB - 197754
Install low voltage cable and connectivity on Parking Levels P3, P2, P1, and Floors 1-22 for tel/data.
Gas piping for temporary Babfar heaters
Temp service to new location at ground level for approx. 18 months
Permit to place a temp generator on site while we relocate temp service
New construction of 114 unit condominium.
New construction of a 114 unit condominium.
temp service for site work ground level duration of about 18 months
Erect 22 Level plus 3 below grade levels of Mixed use Development. Total height of the building is 250 feet above grade, 3 levels of parking below grade, level 2 has restaurant, A3…
unit fit up
1 st floor temporary
all floors
Remove the existing one story, a 135000 sf structure know as the Whiskey bar.; Dig Safe 20183813749