16000 NE 10TH St has 120 municipal building permits on file in Crossroads. The latest recorded activity was a electrical no plan review permit dated Jul 10, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 9 mapped permits within 500 m of this address.
A Nonresidential Repair or Replacement Electrical Project Involving (1 HVAC Equipment - Inside)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Light Fixtures)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Alteration to Existing Structure Electrical
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
9 mapped permits within 500 m, shown on the intelligence map above.
This address has 120 permit records in PropertyLabs' public history and is located in Crossroads. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 16000 NE 10TH St is dated Jul 10, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 16000 NE 10TH St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Receptacles, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (10 Light Fixtures, 1 Added or Altered Branch Circuits)
Remove and replace existing water damaged insulation and ceiling, Replace with new insulation and GWB
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 HVAC Equipment - Outside, 6 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Security System)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits)
A Nonresidential Repair or Replacement None Project Involving (1 Drinking Fountain), 12273
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
Replace and install new 5-ton split system. Existing unit is R22. Lineset will be replaced. Replace actuators if needed.
Replace and install new Air Handling and condensing units. Existing units are R22. Reuse existing duct and economizer. New acuators on AHU-9. New lineset to be installed.
A Nonresidential Alteration to Existing Structure Project Installing {1-Boiler or Compressor 100,001 to 399,000 BTU}. Lochinvar Knight Boiler installation – 285,000 btu/h.
A Nonresidential Alteration to Existing Structure None Project Involving (1 Water Heater Electric < 60 gallons)
A Nonresidential Alteration to Existing Structure Electrical
Crossroads Boiler Replacement - provide and install 2 new Heat Pump Water Heaters and 2 pumps. Connect to existing gas, hot water supply & return piping, condensate, relief drain a…
Seattle/King County Public Health exercising existing MOU with City of Bellevue to activate a community point of distribution in Community Center.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (500 Speaker Wire)
Crossroads Split System Replacement
A Nonresidential Repair or Replacement None Project Involving (1 Water Heater Electric < 60 gallons)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Alteration to Existing Structure None Project Involving (1 Water Heater - Tankless)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 T-Stat or HVAC Controls)
Replace existing defective air handler and condenser unit.
A Nonresidential Repair or Replacement Electrical Project Involving (1 Temporary Service)
Provide power for new HVAC equipment.
Install one 15 ton A/C condenser unit to existing system.
A Nonresidential Repair or Replacement Electrical Project Involving (1 Temporary Service)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Temporary Service)
A Nonresidential Repair or Replacement Fire Alarm Transmitter
A Nonresidential Repair or Replacement Fire Alarm Transmitter
A Nonresidential Repair or Replacement Electrical, 0
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Temporary Service)
Installation of a 20.01(kw) solar photovoltaic system, will be install on roof of property.
Installation of a 20.01(kw) solar photovoltaic system, will be install on roof of property.
A Nonresidential Alteration to Existing Structure Electrical
Change of use to include E-occupancy for daycare
A Nonresidential New Structure Low Voltage Only Project Involving (1 Security System), all floors
A Nonresidential New Structure Low Voltage Only Project Involving (1 Telecommunications System), throughout building
A Nonresidential New Structure Low Voltage Only Project Involving (12 T-Stat or HVAC Controls)
Install new 200 amp electrical service for street lights and rrfb pedestrian system.
185 heads.
anual transfer switch and outlet for redundant generator - 200amp feeder and breaker
Added/altered branch circuits. Extending existing lighting circuit for pathway light.
A Non Residential Repair or Replacement Project Installing {4 Added or Altered Branch Circuits}, changing out lamps and ballast, like for kind
Light fixtures, receptacles and switches.
A Non Residential Repair or Replacement Project Installing {10 Toilet, 3 Urinal, 7 Bathroom Sink, 1 Drinking Fountain}, Women's Bathroom
Proposal to build a concrete-paved pedestrian ramp for public convenience. Proposal includes two seating area and landscape improvements.
Install 1000 amp temp service *Add on carnival or street fair - amusement rides/inflatables per Bob Llyod*
A Non Residential Alteration to Existing Structure Project Installing {25 T-Stat or HVAC Controls}
Water heater
A Non Residential Alteration to Existing Structure Project Installing {15 T-Stat or HVAC Controls}, Install Hvac Building Controls
Childcare registration for the Crossroads Community Center.
Generator/Carnival or Street Fair.
Plug-in inflatables.
Install 1000 amp temp service
Modification of CUP for Crossroads Community Park.
Steep slope buffer reduction for theatre at Crossroads Community Park.
Two vehicle charging stations.
Two vehicle charging stations.
Install heat pump.
Replace existing 200 amp panel. Install new landscape controller and lighting circuits. Trench and backfill for new service.
A Commercial Replacement project installing {Hot Water Tanks} Remove two existing hot water tanks and replace with one new hot water tank
Conference time 5/28/2009 @ 1:30 pm. New Community Center expansion for Youth Theatre.
Replace (2) a/c units.
Install optional standby system.
Move light pole from the east to the west 8'. Existing 20 amp circuit.
A Commercial Alteration project installing {Low Voltage Telecommunications System} INSTALL CABLING FOR (4) CAMERAS
Put (4) pole lights on existing circuit, addition of (1) 20 amp for cameras.
Replace 2 raidant boilers
A Commercial Replacement project installing {Hot Water Tanks}
Install parking lot lights.
Voice and data cabling.
Installation of 5000 sq ft skate park. Includes minor land use exemption.
Additions to a security system.
Install (20) devices to new system. **Rev 1 - Add on 25 devices.
112 sprinkler heads.
A Commercial Alteration project installing {Low Voltage Thermostat Wire}
Expansion of Crossroads Community Center
Addition of existing building, 2 new subpanels of 155 amps.
See fixture list.
Install (4) A/C units, (4) exhaust fans, replace (3) existing rooftop units & install (1) new fooftop unit.
Expansion and renovation of Crossroads Community Center.
Expansion and renovation of the Crossroads Community Center
Expansion and renovations of Crossroads Community Center
Haul route for COB Parks Community Center Expansion-estimated cut-haul is 130 cy or 8 to 11 loads. ROW Fees = $-0-. See Special Conditions and Attachments.
Skate court and community center - 35.4 acre park. Conference date: 9/30/04 @ 3pm
Install (1) 3 phase 15 amp exhaust fan circuit.
Install relief fan on gym system.
New children's play area Hauling permit required for 10+ truckloads. Call Jon Regalia 425-452-4599.
Add 4 devices
Data/Telcom
Extend five electrical circuits
Add 1 head to existing system
extend circuits to install new exit light, automatic door opener, install 2 fixtures
Construct vestibule @ building entry *Includes minor land use exemption*
add new sprinkler heads
Add 2 HVAC grilles and 2 diffusers
(4) sprinkler heads
Relocate 6 troffers and existing circuits in room 111, 112 and reception area **Add on troffers and circuits in room 110**
Add suspended ceiling in conference room #111 and #112 **Added on ceiling in room #110**
Install 3 new light poles with fixtures
2 space heaters 15801 NE 15th St.
gas hwt - site is: 15801 NE 15th St
Replace existing sub panel with new, wire in new gas furnace and hot water tank 15801 NE 15th St
Remove old propane tank and install new furnace and associated ductwork 15801 NE 15th St
gas piping (7) 15801 NE 15th St
Wire new 5 ton AC Unit
Install new air handler with AC and new supply ductwork
Add 2 lights and light switch in loft and wire new air handler
Air handler with a/c and hot water coil
Infill non bearing wall
Cracks in wall by column support.
1 complete HVAC system
Plumbing No Plan Review · Jul 21, 2026