Building permit intelligence · Boston, MA
1660-1670 Soldiers Field Rd has 23 municipal building permits on file in Ward 22. The latest recorded activity was a short form bldg permit permit dated Apr 28, 2026. Permits at this address represent $1MM–$5MM in total declared construction value.
Replacing pressure switch before 1st butterfly valve
Make safe of equipment and counters
REMOVE FIXTURES AND CAP DRAIN LINES
Starbucks is closing. Scope is to remove trademark items-Removal of all casework, cabinets, fixtures, artwork and furniture.
Tara Realty Trust: low voltage wiring to replace existing access control panel with new and terminate (2) existing card readers to the new panel located in IT closet.
7 other addresses on Soldiers Field Rd with municipal permit records in Boston.
This address has 23 permit records in PropertyLabs' public history and is located in Ward 22. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1660-1670 Soldiers Field Rd is dated Apr 28, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1660-1670 Soldiers Field Rd in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Replacing roof top
Renovation of existing work bar to become a new Staples Studio Office work place located in the back of the store
Renovation of existing Work Bar to become a new Staples Studio work place located in the back of the store.
Voice and data cabling
Install all necessary plumbing for store remodel
Reconfigure front line of the Starbucks Coffee Shop at this address including 10-20A outlets, 2-40A outlets and 4 new light fixtures
Update coffee bar and finishes at a Starbucks Coffee No life safety work.
Offices, T.V. station, retail w/ accessory office, restaurant #36a &; 37, accessory tower COO for Offices (Workbar) Alt581278 issued 5/23/2016
Alteration to existing Fire Alarm System at Staples.
Installation of plumbing fixtures
Remodel in Staples.
Remodel at Staples. Installation of 26 data points.
New floor tile in the dining area. New wall finishes in the dining area and restrooms. Update light fixtures. Update furniture. Replace the ice machine. Install a grab n go fridge…
This project encompass the addition of accessory office space within the existing Staples location. This project includes the the construction of new interior partitions and finish…
Install new 20 amp circuit for freezer
Disconnect and reconnect front counter appliances.
Minor remodel of exisitng Starbucks to re-configure service line layout and update millwork. Minor electrical and plumbing work for relocated equipment. Seperate permits will be pu…
Removal and offsite disposal of nominal 40LF of interior non-bearing partition.