Building permit intelligence · Boston, MA
17-25 Blackfan St has 11 municipal building permits on file in Ward 4. The latest recorded activity was a long form/alteration permit permit dated Dec 12, 2025. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 2 km of this address.
Installation of new HVAC equipment and associated ductwork, electrical tie-ins for units, wall board rework, new fire protection piping/sprinklers, and plumbing piping. Permit #SF1…
Demo points from pump skid, new panel for new UPS - VFDs, Well Temp sensors, Lockout points, Pressure sensors, Steam Valves, HEX Valves, DP Valve/DP sensor install 8th floor, Pump/…
Interior Pharmacy Renovation
Renovation of 1st Floor Space for new Exam Rooms and Offices @ 17 to 25 Blackfan St 04 Boston MA 02115
Renovation of 1st Floor Space for new Exam Rooms and Offices @ 17 to 25 Blackfan St 04 Boston MA 02115
3 mapped permits within 2 km, shown on the intelligence map above.
This address has 11 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 17-25 Blackfan St is dated Dec 12, 2025. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 17-25 Blackfan St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Installation of card access and camera devices for security purposes for Bucket 2B Lower Levels.
Nurse call system in MRI suite, LV wiring
ENE299X. Main 707. 7th Floor. Extend existing 120 volt ATC circut new VAV and install controls for room.
New Special Purpose 20a recep for OR Equipment
Electrical renovation of Par Excellence Rooms in the Main Building. Work includes receptacle replacement
Installing 300 telecommunication wiring