Permit history for 1812 Sir Isaac Brock Way

  1. AssemblyPermit IssuedProject value hiddenJul 14, 2026

    Renovation of existing classroom into three separated rooms; two labs and one central study lounge

  2. ResidentialPermit IssuedProject value hiddenJun 19, 2026

    Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)

  3. ResidentialPermit IssuedProject value hiddenJun 19, 2026

    Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)

  4. ResidentialPermit IssuedProject value hiddenJun 19, 2026

    Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)

  5. ResidentialPermit IssuedProject value hiddenJun 19, 2026

    Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)

  6. ResidentialPermit IssuedProject value hiddenJun 19, 2026

    Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)

  7. ResidentialPermit IssuedProject value hiddenJun 19, 2026

    Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)

  8. ResidentialProject CompleteProject value hiddenJun 19, 2026

    Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)

  9. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  10. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  11. AssemblyProject CompleteProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  12. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  13. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  14. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  15. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  16. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  17. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  18. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  19. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  20. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  21. AssemblyProject CompleteProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  22. AssemblyProject CompleteProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  23. AssemblyUnder InspectionProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  24. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  25. AssemblyUnder InspectionProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  26. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.

  27. AssemblyPermit IssuedProject value hiddenMay 8, 2026

    Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.

  28. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  29. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  30. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  31. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  32. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  33. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  34. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  35. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  36. AssemblyPermit IssuedProject value hiddenMay 6, 2026

    Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.

  37. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.

  38. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.

  39. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.

  40. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.

  41. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.

  42. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.

  43. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.

  44. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.

  45. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.

  46. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.

  47. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.

  48. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.

  49. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.

  50. AssemblyPermit IssuedProject value hiddenApr 24, 2026

    Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.

  51. AssemblyPermit IssuedProject value hiddenApr 21, 2026

    Alterations to the existing assembly building for new lab space, MACKENZIE CHOWN D206, Department of Earth Sciences.

  52. AssemblyPermit IssuedProject value hiddenFeb 27, 2026

    To demolish the 2-storey building and reconstruct as 3-storey, 6000 m² (GFA) Brock Student Union Building. Phase 2 alterations to existing portion of building included in scope of…

  53. AssemblyUnder InspectionProject value hiddenJan 29, 2026

    Alterations to the second floor of Welch Hall to convert the existing Resource Centre into three teaching-focused spaces.

  54. AssemblyProject CompleteProject value hiddenOct 10, 2025

    Installation of 2 partition screens with mag locks on the third floor of the Rankin Family Pavillion.

  55. AssemblyUnder InspectionProject value hiddenSep 9, 2025

    Alterations to the sprinkler system for new architectural layout.

  56. AssemblyUnder InspectionProject value hiddenMay 12, 2025

    Renovation of approx. 623m2 of existing open access computer lab and associated seminar room into five 5 new computer labs. SCOTIA BANK HALL

  57. Designated StructureUnder InspectionProject value hiddenAug 30, 2024

    To construct a demountable stage (Stageline SL100) from August 30, 2024 to September 06, 2024.

  58. AssemblyUnder InspectionProject value hiddenAug 14, 2024

    Alterations to level 200, Brock University THISTLE COMPLEX.

  59. AssemblyProject CompleteProject value hiddenJul 31, 2024

    Alterations to the electrical system on Level 200 at Matheson Learning Commons, Brock University.

  60. AssemblyProject CompleteProject value hiddenJun 29, 2024

    Alterations to WH09G Research Lab, basement level within Welch Hall, Brock University.

  61. Plumbing OnlyProject CompleteProject value hiddenJun 20, 2024

    Replacing 160m of aging 200mm water service pipe for hydrant leads

  62. AssemblyProject CompleteProject value hiddenApr 19, 2024

    Renovation of office space D302 to remove demising wall and increase size of classroom D303 in MACKENZIE CHOWN "D" Block.

  63. Temporary StructurePermit IssuedProject value hiddenAug 29, 2023

    Erect a demountable stage (Stageline SL100 Stage) from Sept 2/2023 to Sept 3/2023 for 'Brock University'.

  64. ResidentialUnder InspectionProject value hiddenJul 31, 2023

    Alteration to Replace Doors and Adding Security Door System in Alan Earp Residence

  65. AssemblyProject CompleteProject value hiddenJun 20, 2023

    Interior Alterations to Classroom Mackenzie Chown 400 Level.

  66. AssemblyProject CompleteProject value hiddenMar 21, 2023

    Renovation to Existing Offices and Meeting Room, Schmon Tower level 4.

  67. AssemblyProject CompleteProject value hiddenOct 21, 2022

    Interior alterations to a washroom and electrical room in the 'Captain John Decew' building (Brock University).

  68. AssemblyProject CompleteProject value hiddenOct 21, 2022

    Interior alterations to a washroom and electrical room in the 'Schmon Tower' building

  69. AssemblyUnder InspectionProject value hiddenAug 23, 2022

    Alteration to Change School Lab into Classroom

  70. ResidentialPermit IssuedProject value hiddenMay 6, 2022

    Replace Doors and Update Access Control on Levels 1, 4, and 5 at 'Alan Earp Residence - Brock University'

  71. AssemblyProject CompleteProject value hiddenApr 28, 2022

    Interior Alterations to Create New Entrance and Research Space

  72. AssemblyProject CompleteProject value hiddenApr 7, 2022

    Replace Fire Alarm (Kenmore Centre)

  73. AssemblyProject CompleteProject value hiddenMar 9, 2022

    Alter Interior of Offices at 'Mackenzie Chown Complex Block A' (MCA) and Construct a Link between Offices of 'MCA' and 'Goodman School of Business' 'Brock University'

  74. AssemblyProject CompleteProject value hiddenFeb 10, 2022

    Install Floor Mounted Hold Open Device

  75. Sign PermitUnder InspectionProject value hiddenNov 19, 2021

    Install (1) Wall Sign for Brock University

  76. AssemblyProject CompleteProject value hiddenSep 24, 2021

    Proposed Extension of Existing Fire Sprinkler System for 'Inniskillin Hall' Addition

  77. Temporary StructureProject CompleteProject value hiddenSep 1, 2021

    Install Two 20' x 20' Temporary Tents, Two 10' x 10' and One (800sf) Hexagon (with Walls) From Sept 5/21 to Sept 20/21

  78. Temporary StructureProject CompleteProject value hiddenAug 31, 2021

    To Install Five 20' x 20' Temporary Tents (With Walls) from September 1,2021 - September 19, 2021

  79. AssemblyProject CompleteProject value hiddenJul 23, 2021

    Renovate Existing Office Space at Second Floor for 'Thistle Complex'

  80. ResidentialProject CompleteProject value hiddenJul 23, 2021

    Alternative solution for treatment of vertical standpipe riser piping with fire protection insulation providing fire resistance rating of 1 hr - Construct Superstructure Only for '…

  81. AssemblyProject CompleteProject value hiddenJun 22, 2021

    Partially Enclose Existing Interior Mezzanine to Create an Office Space on Level 300

  82. AssemblyProject CompleteProject value hiddenApr 29, 2021

    Construct a Two Storey Addition to 'Inniskillin Hall - Brock University'

  83. Plumbing OnlyPermit IssuedProject value hiddenApr 14, 2021

    New site servicing for Inniskillin Addition

  84. ResidentialPermit IssuedProject value hiddenDec 9, 2020

    Install Sprinkler and Standpipe Systems for 'Residence 8 - Brock University'

  85. Sign PermitProject CompleteProject value hiddenOct 21, 2020

    Install One (1) Wall Sign for Brock University - "Goodman School of Business" Oct 21/20 called Applicant advised of pick up sending someone from Brock - jzh

  86. AssemblyProject CompleteProject value hiddenJul 20, 2020

    Expand Existing 'Hungry Badgers Food Court at Tim Hortons and Cafeteria (South Block and Walker Complex) - Brock University'

  87. AssemblyProject CompleteProject value hiddenJun 30, 2020

    Alter Laboratory Rooms at Second floor of 'Mackenzie Chown Complex - Brock University'

  88. AssemblyProject CompleteProject value hiddenJun 16, 2020

    Remove Existing Exit Sign and Add Door Hardware at (2) Doors at 'Cairns' Bioscience Building - Brock University'

  89. AssemblyProject CompleteProject value hiddenJun 10, 2020

    Modify Existing Sprinkler System at 'Walker Sports Complex - Brock University'

  90. ResidentialProject CompleteProject value hiddenApr 3, 2020

    Construct Superstructure Only for 'Residence 8 - Brock University'

  91. Plumbing OnlyProject CompleteProject value hiddenJan 6, 2020

    Site servicing for New Residence 8 and Parking Lot M $2,000 Water Testing

  92. AssemblyPermit IssuedProject value hiddenDec 24, 2019

    Alter Interior of 'East Academic Computer Lab Design Services - Brock University' to Create a Computer Room from Two Existing Seminar Rooms

  93. ResidentialProject CompleteProject value hiddenDec 17, 2019

    Construct Foundation Only for 'Residence 8 - Brock University'

  94. AssemblyUnder InspectionProject value hiddenNov 21, 2019

    Modifications to Sprinkler System & Plumbing (Ground Floor - Guernsey Market Hall) Starbucks

  95. Temporary StructureProject CompleteProject value hiddenOct 16, 2019

    To erect a 40' X 80' tent (with sidewalls) from Oct 17/2019 to Oct 21/2019 for "Bock University"

  96. AssemblyProject CompleteProject value hiddenOct 8, 2019

    Alter Interior of Third Floor Faculty Offices of International Centre 'Brock University'

  97. AssemblyProject CompleteProject value hiddenSep 19, 2019

    Construct a Two Storey Addition to 'The Zone - Brock University'

  98. Plumbing OnlyUnder InspectionProject value hiddenAug 12, 2019

    Onsite Servicing, Upgrading and replacing ****Fees to be established by Plumbing Team****

  99. AssemblyUnder InspectionProject value hiddenAug 9, 2019

    Alter Interior of 'Hungry Badgers Food Court - Brock University'

  100. ResidentialProject CompleteProject value hiddenJul 19, 2019

    Alter Interior and Construct Addition to 'Brock University - Decew Residence'

  101. ResidentialProject CompleteProject value hiddenJun 26, 2019

    Replace Existing Doors and New Card Access Controls, Fire Alarm Modifications at 'Lowenberger Residence'

  102. Business & Personal ServicesUnder InspectionProject value hiddenJun 19, 2019

    Alter Interior of Administration Space 'Thistle Building - Brock University'

  103. Temporary StructureProject CompleteProject value hiddenMay 31, 2019

    Erect a 40 ft x 80 ft Tent with Sidewalls from June 8, 2019 to June 16, 2019

  104. AssemblyProject CompleteProject value hiddenMay 26, 2019

    Construct New Wall/Door w Maglock 13th Floor 'Schmon Tower - Brock University'

  105. Business & Personal ServicesUnder InspectionProject value hiddenMay 23, 2019

    Alter interior to Administration Offices 'Cairns Biolinc - Brock University'

  106. ResidentialProject CompleteProject value hiddenMay 13, 2019

    Replace Existing Cladding with New Aluminum Panels at 'Brock University - Lowenberger Residence'

  107. AssemblyProject CompleteProject value hiddenApr 4, 2019

    Alter Interior of 'Mackenzie Chown Labs H316, H318, and H324 at Level 300 - Brock University'

  108. MercantileProject CompleteProject value hiddenJan 2, 2019

    Alter Interior 'Pizza Pizza' at 'Brock University'

  109. AssemblyUnder InspectionProject value hiddenSep 12, 2018

    Renovate Existing 'Tim Hortons - Brock University'

  110. Temporary StructureProject CompleteProject value hiddenAug 1, 2018

    Construct 40 x 120 Tent with Sidewalls - Aug 14 - 21/18

  111. ResidentialUnder InspectionProject value hiddenJun 12, 2018

    Replace Plumbing Risers in 'Lowenberger Residence'

  112. ResidentialUnder InspectionProject value hiddenJun 4, 2018

    To Repair Floor Structure from Fire in Unit # 1113 Install Insulation, Repair Fire Separations, and Install new HVAC System

  113. Temporary StructureProject CompleteProject value hiddenJun 1, 2018

    To erect 40' x 80' tent with sidewalls and stage from June 2 - 9, 2018

  114. ResidentialUnder InspectionProject value hiddenMay 24, 2018

    Changing Doors and Hardware at Student Residence

  115. IndustrialPermit IssuedProject value hiddenFeb 12, 2018

    To Remove 4 old Generators & Install 2 New Generators and Replace 1 Chiller at 'Cogeneration Facility - Brock University'

  116. AssemblyProject CompleteProject value hiddenNov 17, 2017

    Alter Interior of Library - Fifth Floor - 'Schmon Tower Brock University'

  117. Temporary StructureProject CompleteProject value hiddenOct 11, 2017

    Erect a 40' x 80' Frame Tent with Sidewalls

  118. Temporary StructureProject CompleteProject value hiddenSep 14, 2017

    To Erect a 40x60 Tent with no side walls - Sept 15/2017 - Sept 17/2017

  119. AssemblyUnder InspectionProject value hiddenSep 11, 2017

    Install Kitchen Exhaust Hood and Fire Suppression Systemfor 'Pita Pit - Brock University' (formerly 'Ben & Jerrys')

  120. Plumbing OnlyProject CompleteProject value hiddenAug 28, 2017

    New Catch Basin and Storm Line

  121. Temporary StructureProject CompleteProject value hiddenAug 10, 2017

    To Erect a 40 x 100 Tent - Install August 16/17 Take Down August 21/17

  122. AssemblyUnder InspectionProject value hiddenJul 26, 2017

    Replace Ceilings and Spray Foam Fire Proofing at 'Brock University - Mackenzie Chown' (300 Level Classroom)

  123. Plumbing OnlyProject CompleteProject value hiddenJul 25, 2017

    Replace Private Fire Hydrant Lead No w/o required per S Mills/cs

  124. ResidentialPermit IssuedProject value hiddenJul 25, 2017

    Uprgrade Access Control System in 'Brock University - Lowenberger Residence'

  125. AssemblyProject CompleteProject value hiddenJul 12, 2017

    Demo Existing Greenhouse

  126. ResidentialUnder InspectionProject value hiddenJun 16, 2017

    Replace Plumbing Risers in 'Lowenberger Residence - Brock University'

  127. Temporary StructureProject CompleteProject value hiddenJun 9, 2017

    Install 30 ft x 50 ft Tent - June 24/17 to June 26/17 for 'Canadian Mental Health Association'

  128. Temporary StructureProject CompleteProject value hiddenJun 1, 2017

    To Erect 40 x 80 Frame Tent with Sidewalls Install: June 3, 2017 - Take Down: June 10, 2017

  129. AssemblyProject CompleteProject value hiddenApr 24, 2017

    Construct a 2 storey addition and alter interior of Schmon Tower and Thistle Building - Brock University

  130. AssemblyProject CompleteProject value hiddenApr 7, 2017

    Demolish existing Slab, Canopy, and Stairs

  131. Plumbing OnlyProject CompleteProject value hiddenMar 22, 2017

    Replacement of Interior Potable Watermain Brock University Campus

  132. Plumbing OnlyProject CompleteProject value hiddenMar 22, 2017

    Upgrades to the premise isolation back flow prevention (BFP) on the potable water lines serving Walker Complex D, Scotiabank Hall and Vallee Residence. All 3 buildings do not curre…

  133. AssemblyUnder InspectionProject value hiddenNov 25, 2016

    Construct a Cold Room in Cairns RM 429 - 'Brock University'

  134. AssemblyUnder InspectionProject value hiddenNov 9, 2016

    Alter Interior First Floor for new Kitchen, Office, and Universal Washroom 'Thistle Complex - Brock University'

  135. Temporary StructureProject CompleteProject value hiddenOct 14, 2016

    Erect 20x60 Tent with Sidewalls

  136. Business & Personal ServicesProject CompleteProject value hiddenOct 4, 2016

    Alter Interior of Level 2 for new Office - 'Thistle Complex - Brock University'

  137. Temporary StructureProject CompleteProject value hiddenSep 30, 2016

    To erect a 40 X 80 Frame Tent with Sidewalls Install Oct 14, 2016 - Remove Oct 16, 2016

  138. AssemblyProject CompleteProject value hiddenSep 13, 2016

    Construct 3 New Bus Shelter Enclosures (1 @ 8.0 Ft x 20 Ft) & (2 @ 8.0 Ft x 16.0 Ft)

  139. AssemblyProject CompleteProject value hiddenSep 2, 2016

    Construct East and West Additions and Alter Interior of 'Goodman School of Business at Taro Hall' - Brock University

  140. AssemblyUnder InspectionProject value hiddenAug 23, 2016

    Alter Interior of Gymnasium 2 - 'Walker Complex - Brock University'

  141. Temporary StructureProject CompleteProject value hiddenAug 11, 2016

    To Erect a 40 ft x 60 ft Tent (No sidewalls) - Sept. 16/16 to Sept. 18/16 (Student Union Tent)

  142. Temporary StructureProject CompleteProject value hiddenAug 11, 2016

    To Erect a 40' x 145' Tent w/o Sidewalls Sept 15 -18, 2016 (Red Dinner)

  143. AssemblyUnder InspectionProject value hiddenJul 8, 2016

    Alter Interior of Classrooms and Offices at 'Thistle and Schmon Tower - Brock University'

  144. AssemblyPermit IssuedProject value hiddenJun 15, 2016

    Replace Guards at 'Brock University - Schmon Tower - Level 300'

  145. Temporary StructureProject CompleteProject value hiddenJun 15, 2016

    Erect a 40 ft x 50 ft Tent (no Sidewalls) at 'Brock University' - Erected June 23/16 and Removed June 25/16

  146. AssemblyProject CompleteProject value hiddenMay 24, 2016

    Replace Fireproofing at MacKenzie Chown Complex (Classroom Ceiling) - 'Brock University'

  147. Temporary StructureProject CompleteProject value hiddenMay 18, 2016

    To Erect 40' x 80' Tent with Sidewalls from June 6, 2016 to June 11, 2016 for Brock University.

  148. AssemblyUnder InspectionProject value hiddenMay 18, 2016

    Alter Interior of Sean O'Sullivan Theatre and Convert to Classroom - 'Brock University'

  149. AssemblyPermit IssuedProject value hiddenDec 18, 2015

    REPLACE EXISTING SWINGING DOORS WITH SLIDING DOORS (North Entrance) Brock 'U' The Cairn's Family Health & Bioscience Research Complex

  150. AssemblyUnder InspectionProject value hiddenDec 16, 2015

    Replace Existing DJ Booth

  151. Temporary StructureProject CompleteProject value hiddenOct 15, 2015

    Erect 40 x 80 Tent With Sidewalls From October 16 - 18, 2015

  152. Sign PermitProject CompleteProject value hiddenSep 22, 2015

    Erect a Pole Sign - Scoreboard for 'Brock University'

  153. Temporary StructureProject CompleteProject value hiddenSep 8, 2015

    To Erect A 40 ft x 180 ft Tent (with Sidewalls) from September 17, 2015 to September 21, 2015 for 'Brock University'

  154. HVAC ONLY PermitUnder InspectionProject value hiddenAug 19, 2015

    Demolish Existing exhaust hood, cap exhaust duct at ceiling with welded steel plate

  155. AssemblyUnder InspectionProject value hiddenAug 7, 2015

    Interior Alterations/Renovations To Teaching and Office Spaces, Demolition and Reconstruction Of Interior Walls, HVAC Improvements, New Ceiling Alterations

  156. AssemblyUnder InspectionProject value hiddenAug 5, 2015

    Alter Existing Sidewalk to Create 2 New Barrier Free Ramps

  157. Plumbing OnlyProject CompleteProject value hiddenJul 10, 2015

    300 mm Storm Pipe From Field

  158. Temporary StructureProject CompleteProject value hiddenMay 26, 2015

    Erect Tent With Sidewalls From June 7, 2015 to June 14, 2105

  159. Temporary StructureProject CompleteProject value hiddenMay 14, 2015

    To Erect a Tent with No Sidewalks from May 13 - May 15, 2015

  160. AssemblyUnder InspectionProject value hiddenMay 7, 2015

    Repair Existing Roof Truss System, Remove/Replace Existing Insulated Metal Siding Panel On Upper Exterior Of Building

  161. AssemblyUnder InspectionProject value hiddenMay 5, 2015

    Barrier Free Accessible Washroom Renovation

  162. AssemblyProject CompleteProject value hiddenJan 16, 2015

    REMOVE & REPLACE FIRE ALARM SYSTEM FOR 'Mackenzie Chown Complex & Greenhouse'

  163. AssemblyPermit IssuedProject value hiddenOct 29, 2014

    REPLACE EXISTING SWINGING DOORS W / NEW SLIDING DOORS IN VESTIBULE 208-A, EAST ENTRANCE - Cairn's Bio-Science Building

  164. Temporary StructureProject CompleteProject value hiddenOct 17, 2014

    To Erect 40 ft x 80 ft Frame Tent c/w Sidewalls, From October 17, 2014 to October 19, 2014 for Brock University

  165. AssemblyUnder InspectionProject value hiddenOct 7, 2014

    Construct new Ramp, Stairs and Pergola Roof at 'Isaac's Bar and Grill - Brock University'

  166. AssemblyPermit IssuedProject value hiddenSep 16, 2014

    Alter Interior to Create new Fire ALarm Control Panel Room - 'Brock University'

  167. Temporary StructureProject CompleteProject value hiddenSep 11, 2014

    Erect a 40 ft x 60 ft Tent (no side walls) from Sept 17/14 to Sept 21/14 - 'Brock University'

  168. Temporary StructureProject CompleteProject value hiddenAug 28, 2014

    Erect a 40 ft x 140 ft Tent (with Sidewalls) from Sept 17/14 to Sept 21/14 - 'Brock University'

  169. AssemblyProject CompleteProject value hiddenJun 24, 2014

    REPLACEMENT OF EXISTING ROOFTOP UNITS & STRUCTURAL ALTERATIONS (Lowenberger Residence, Brock University)

  170. Temporary StructureProject CompleteProject value hiddenMay 27, 2014

    CONSTRUCT A 40 ft x 80 ft TENT WITH SIDEWALLS (Temporary) From June 1st - June 8th, 2014

  171. Temporary StructureProject CompleteProject value hiddenMay 15, 2014

    To Erect a 40 ft x 80 ft Tent c/w Fabric Sidewalls And Glass Doors from May 21, 2014 to June 1, 2014

  172. AssemblyUnder InspectionProject value hiddenMay 6, 2014

    INTERIOR ALTERATIONS WELCH HALL (Laboratory - Brock University)

  173. Temporary StructureProject CompleteProject value hiddenOct 15, 2013

    To Erect A 60ft x 90 ft Tent fromOctober 18 to October 20, 2013

  174. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex A - Backflow Prevention

  175. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex 'B' - Backflow Prevention

  176. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex C - Backflow Prevention

  177. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex G - Backflow Prevention

  178. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex 'E' - Backflow Prevention

  179. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex J - Backflow Prevention

  180. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex 'F' - Backflow Prevention

  181. Plumbing OnlyProject CompleteProject value hiddenJun 13, 2013

    Complex D - Backflow Prevention

  182. Temporary StructureProject CompleteProject value hiddenJun 4, 2013

    Erect 60 ft x 90 ft Tent With Glass Door(s) And Fabric Sidewalls from June 10 to June 16, 2013

  183. AssemblyUnder InspectionProject value hiddenMay 24, 2013

    Install 4 Automatic Door Operators to Existing Doors and Connect to Fire Alarm System at 'Brock University - Welch Hall'

  184. AssemblyProject CompleteProject value hiddenApr 19, 2013

    HVAC Replacement, Structural Pads, Roof Alterations (Eleanor Misener Aquatics Centre)

  185. AssemblyProject CompleteProject value hiddenFeb 11, 2013

    ALTERATIONS TO CREATE LABORATORY CLASSROOMS (Room 209, Cairns Building)

  186. AssemblyProject CompleteProject value hiddenDec 28, 2012

    Interior Alterations to - Walker Complex

  187. AssemblyPermit IssuedProject value hiddenDec 3, 2012

    Install 2 Hold Open Devices for 'Brock University' 'Student Alumni Centre'

  188. Temporary StructureProject CompleteProject value hiddenOct 2, 2012

    Erect Tent - 60 ft x 90 ft (Oct 12 - Oct 14/12)

  189. AssemblyUnder InspectionProject value hiddenSep 21, 2012

    Construct a new Pavillion ('CATI SHELTER') for 'Brock University'

  190. MercantileUnder InspectionProject value hiddenAug 27, 2012

    CREATE NEW FOOD SERVICE COUNTER FOR NEW COFFEE SHOP IN CAIRNS COMPLEX

  191. AssemblyProject CompleteProject value hiddenAug 23, 2012

    Alter Interior of Labs C201 and C202 in 'McKenzie Chown Building - Brock University'

  192. AssemblyUnder InspectionProject value hiddenJun 26, 2012

    INTERIOR ALTERATIONS TO OFFICE SPACES - BROCK 'U' ( Mackenzie Chown Complex )

  193. AssemblyProject CompleteProject value hiddenJun 14, 2012

    INTERIOR ALTERATIONS TO LEARNING COMMONS - BROCK 'U'

  194. ResidentialProject CompleteProject value hiddenJun 11, 2012

    Repair Fire Damage to Suite 408 - 'Lowenberger Residence'

  195. AssemblyUnder InspectionProject value hiddenJun 8, 2012

    MINOR INTERIOR ALTERATIONS TO SOUTHBLOCK VARIOUS OFFICES - LEVELS 300 & 400, BROCK UNIVERSITY

  196. AssemblyUnder InspectionProject value hiddenJun 8, 2012

    ADD ROOF ACCESS STAIR TO MARKET HALL THISTLE COMPLEX - BROCK 'U'

  197. Temporary StructureProject CompleteProject value hiddenJun 4, 2012

    Construct Tent 60ft x 90ft Between June 4/12 and June 10/12

  198. ResidentialProject CompleteProject value hiddenMay 14, 2012

    Demolish Interior of Unit #408 (Lowenberger Residence)

  199. Temporary StructureProject CompleteProject value hiddenSep 27, 2011

    Erect a 60 ft x 90 ft tent from October 21/11 to October 23/11 at 'Brock University'

  200. ResidentialUnder InspectionProject value hiddenJun 30, 2011

    UPGRADE FIRE ALARM SYSTEM (Brock University Vallee Residence)

  201. Business & Personal ServicesProject CompleteProject value hiddenJun 29, 2011

    INTERIOR ALTERATIONS AT BROCK ALUMNI CENTRE

  202. AssemblyUnder InspectionProject value hiddenMay 30, 2011

    REPLACE EXISTING WEST ENTRY DOORS AT WALKER COMPLEX

  203. AssemblyUnder InspectionProject value hiddenMay 2, 2011

    INTERIOR ALTERATIONS TO 2ND AND 3RD FLOORS (Welch Hall)

  204. ResidentialUnder InspectionProject value hiddenApr 28, 2011

    INSTALL A CHILLER PLANT AND COOLING TOWER

  205. Temporary StructureProject CompleteProject value hiddenApr 19, 2011

    Erect a 60ft x 90ft Tent From June 6 2011 - June 12 2011 at Brock University

  206. Plumbing OnlyProject CompleteProject value hiddenFeb 18, 2011

    Install 4 Testable Devices (160 Non Testable) H block

  207. AssemblyProject CompleteProject value hiddenFeb 1, 2011

    CONSTRUCT STUDENT STUDY ROOMS ON 6TH FLOOR OF LIBRARY (Schmon Tower)

  208. Plumbing OnlyUnder InspectionProject value hiddenNov 18, 2010

    10 Metre Extension to 250 mm Watermain and One Fire Hydrant

  209. AssemblyUnder InspectionProject value hiddenOct 15, 2010

    CONSTRUCT NEW NIAGARA HEALTH & BIO SCIENCE RESEARCH COMPLEX

  210. Temporary StructureProject CompleteProject value hiddenSep 23, 2010

    Erect a 60' x 90' Tent

  211. AssemblyUnder InspectionProject value hiddenAug 16, 2010

    INTERIOR RENOVATIONS FOR FOOD PREP AREA (Teriyaki Experience)

  212. AssemblyProject CompleteProject value hiddenJul 8, 2010

    Alter Interior to Create new Reception Area

  213. IndustrialUnder InspectionProject value hiddenJun 10, 2010

    CONSTRUCT EXTERIOR CONCRETE WASH PAD

  214. Sign PermitProject CompleteProject value hiddenJun 9, 2010

    construct v-shaped ground sign (184 sq. ft.) 'Brock Bio Science'

  215. Sign PermitProject CompleteProject value hiddenJun 9, 2010

    Construct Ground Sign (184 sq. ft.) Brock Bio Science

  216. AssemblyUnder InspectionProject value hiddenJun 1, 2010

    ALTERATIONS TO DAVID S. HOWES THEATRE - 500 GLENRIDGE

  217. Plumbing OnlyProject CompleteProject value hiddenMay 28, 2010

    Site servicing for new Bio Science building

  218. Temporary StructureProject CompleteProject value hiddenMay 6, 2010

    Erect Tent - June 7 - June 13/10

  219. AssemblyProject CompleteProject value hiddenFeb 1, 2010

    Renovate Existing Offices and Barrier Free Washroom in Welch Hall

Development activity near 1812 Sir Isaac Brock Way

40 mapped permits within 2 km, shown on the intelligence map above.

Explore all St. Catharines permits

1812 Sir Isaac Brock Way in the St. Catharines permit market

This address has 219 permit records in PropertyLab's public history. The city figures below provide context without changing the focus of this exact-address record.

Full St. Catharines permit report
City address-linked rows
20,232
City, trailing 90 days
324
City, trailing 30 days
92

City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 19, 2026.

Permit questions about 1812 Sir Isaac Brock Way

Are there building permits at this address?
1812 Sir Isaac Brock Way has 219 municipal building permits on record, with the latest activity dated Jul 14, 2026.
What construction activity is nearby?
40 mapped permits were found within 2 km of 1812 Sir Isaac Brock Way.
What is the declared permit value?
The public permit records for 1812 Sir Isaac Brock Way do not currently include a usable total declared construction value.

About this address record

PropertyLab compiled this permit history from municipal public records for St. Catharines, ON. The latest recorded permit activity at 1812 Sir Isaac Brock Way is dated Jul 14, 2026. Municipal records can be corrected or updated after publication.

Contractors and applicants associated with these permits

See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1812 Sir Isaac Brock Way in the PropertyLab platform, along with alerts when new permits are filed at this address.

1812 Sir Isaac Brock Way Building Permits — St. Catharines, ON | PropertyLabs