Building permit intelligence · St. Catharines, ON
1812 Sir Isaac Brock Way has 221 municipal building permits on file. The latest recorded activity was a assembly permit dated Jul 21, 2026. PropertyLabs also identified 26 mapped permits within 2 km of this address.
Alterations to existing classrooms 205 & 206, and 8J & 8G (basement level) at ROBERT WELCH HALL, Brock University.
Alterations to existing classrooms 205 & 206, and 8J & 8G (basement level) at ROBERT WELCH HALL, Brock University.
Alterations to existing classrooms 205 & 206, and 8J & 8G (basement level) at ROBERT WELCH HALL, Brock University.
Alterations to existing classrooms 205 & 206, and 8J & 8G (basement level) at ROBERT WELCH HALL, Brock University.
Alterations to existing classrooms 205 & 206, and 8J & 8G (basement level) at ROBERT WELCH HALL, Brock University.
26 mapped permits within 2 km, shown on the intelligence map above.
This address has 221 permit records in PropertyLabs' public history. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for St. Catharines, ON. The latest recorded permit activity at 1812 Sir Isaac Brock Way is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1812 Sir Isaac Brock Way in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovation of existing classroom into three separated rooms; two labs and one central study lounge
Renovation of existing classroom into three separated rooms; two labs and one central study lounge
Renovation of existing classroom into three separated rooms; two labs and one central study lounge
Renovation of existing classroom into three separated rooms; two labs and one central study lounge
Renovation of existing classroom into three separated rooms; two labs and one central study lounge
Renovation of existing classroom into three separated rooms; two labs and one central study lounge
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
Repair Vehicle Impact Damage to Rowhouse (Village Residence Court 3, Unit 315)
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to existing classrooms, Brock University -Mackenzie Chown (MCD) Building D - Level 4.
To replace fire alarm panel and incompatible smoke devices in basement and third floor levels.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the basement level to convert a lounge to a behavioral studies lab at ROBERT S.K. WELCH HALL.
Alterations to the existing assembly building to fit out servery and kitchen area, BROCK UNIVERSITY RESIDENCE 8.
Alterations to the 13th floor of the existing assembly building, SCHMON TOWER, BROCK UNIVERSITY.
Alterations to the existing assembly building for new lab space, MACKENZIE CHOWN D206, Department of Earth Sciences.
To demolish the 2-storey building and reconstruct as 3-storey, 6000 m² (GFA) Brock Student Union Building. Phase 2 alterations to existing portion of building included in scope of…
Alterations to the second floor of Welch Hall to convert the existing Resource Centre into three teaching-focused spaces.
Installation of 2 partition screens with mag locks on the third floor of the Rankin Family Pavillion.
Alterations to the sprinkler system for new architectural layout.
Renovation of approx. 623m2 of existing open access computer lab and associated seminar room into five 5 new computer labs. SCOTIA BANK HALL
To construct a demountable stage (Stageline SL100) from August 30, 2024 to September 06, 2024.
Alterations to level 200, Brock University THISTLE COMPLEX.
Alterations to the electrical system on Level 200 at Matheson Learning Commons, Brock University.
Alterations to WH09G Research Lab, basement level within Welch Hall, Brock University.
Replacing 160m of aging 200mm water service pipe for hydrant leads
Renovation of office space D302 to remove demising wall and increase size of classroom D303 in MACKENZIE CHOWN "D" Block.
Erect a demountable stage (Stageline SL100 Stage) from Sept 2/2023 to Sept 3/2023 for 'Brock University'.
Alteration to Replace Doors and Adding Security Door System in Alan Earp Residence
Interior Alterations to Classroom Mackenzie Chown 400 Level.
Renovation to Existing Offices and Meeting Room, Schmon Tower level 4.
Interior alterations to a washroom and electrical room in the 'Captain John Decew' building (Brock University).
Interior alterations to a washroom and electrical room in the 'Schmon Tower' building
Alteration to Change School Lab into Classroom
Replace Doors and Update Access Control on Levels 1, 4, and 5 at 'Alan Earp Residence - Brock University'
Interior Alterations to Create New Entrance and Research Space
Replace Fire Alarm (Kenmore Centre)
Alter Interior of Offices at 'Mackenzie Chown Complex Block A' (MCA) and Construct a Link between Offices of 'MCA' and 'Goodman School of Business' 'Brock University'
Install Floor Mounted Hold Open Device
Install (1) Wall Sign for Brock University
Proposed Extension of Existing Fire Sprinkler System for 'Inniskillin Hall' Addition
Install Two 20' x 20' Temporary Tents, Two 10' x 10' and One (800sf) Hexagon (with Walls) From Sept 5/21 to Sept 20/21
To Install Five 20' x 20' Temporary Tents (With Walls) from September 1,2021 - September 19, 2021
Renovate Existing Office Space at Second Floor for 'Thistle Complex'
Alternative solution for treatment of vertical standpipe riser piping with fire protection insulation providing fire resistance rating of 1 hr - Construct Superstructure Only for '…
Partially Enclose Existing Interior Mezzanine to Create an Office Space on Level 300
Construct a Two Storey Addition to 'Inniskillin Hall - Brock University'
New site servicing for Inniskillin Addition
Install Sprinkler and Standpipe Systems for 'Residence 8 - Brock University'
Install One (1) Wall Sign for Brock University - "Goodman School of Business" Oct 21/20 called Applicant advised of pick up sending someone from Brock - jzh
Expand Existing 'Hungry Badgers Food Court at Tim Hortons and Cafeteria (South Block and Walker Complex) - Brock University'
Alter Laboratory Rooms at Second floor of 'Mackenzie Chown Complex - Brock University'
Remove Existing Exit Sign and Add Door Hardware at (2) Doors at 'Cairns' Bioscience Building - Brock University'
Modify Existing Sprinkler System at 'Walker Sports Complex - Brock University'
Construct Superstructure Only for 'Residence 8 - Brock University'
Site servicing for New Residence 8 and Parking Lot M $2,000 Water Testing
Alter Interior of 'East Academic Computer Lab Design Services - Brock University' to Create a Computer Room from Two Existing Seminar Rooms
Construct Foundation Only for 'Residence 8 - Brock University'
Modifications to Sprinkler System & Plumbing (Ground Floor - Guernsey Market Hall) Starbucks
To erect a 40' X 80' tent (with sidewalls) from Oct 17/2019 to Oct 21/2019 for "Bock University"
Alter Interior of Third Floor Faculty Offices of International Centre 'Brock University'
Construct a Two Storey Addition to 'The Zone - Brock University'
Onsite Servicing, Upgrading and replacing ****Fees to be established by Plumbing Team****
Alter Interior of 'Hungry Badgers Food Court - Brock University'
Alter Interior and Construct Addition to 'Brock University - Decew Residence'
Replace Existing Doors and New Card Access Controls, Fire Alarm Modifications at 'Lowenberger Residence'
Alter Interior of Administration Space 'Thistle Building - Brock University'
Erect a 40 ft x 80 ft Tent with Sidewalls from June 8, 2019 to June 16, 2019
Construct New Wall/Door w Maglock 13th Floor 'Schmon Tower - Brock University'
Alter interior to Administration Offices 'Cairns Biolinc - Brock University'
Replace Existing Cladding with New Aluminum Panels at 'Brock University - Lowenberger Residence'
Alter Interior of 'Mackenzie Chown Labs H316, H318, and H324 at Level 300 - Brock University'
Alter Interior 'Pizza Pizza' at 'Brock University'
Renovate Existing 'Tim Hortons - Brock University'
Construct 40 x 120 Tent with Sidewalls - Aug 14 - 21/18
Replace Plumbing Risers in 'Lowenberger Residence'
To Repair Floor Structure from Fire in Unit # 1113 Install Insulation, Repair Fire Separations, and Install new HVAC System
To erect 40' x 80' tent with sidewalls and stage from June 2 - 9, 2018
Changing Doors and Hardware at Student Residence
To Remove 4 old Generators & Install 2 New Generators and Replace 1 Chiller at 'Cogeneration Facility - Brock University'
Alter Interior of Library - Fifth Floor - 'Schmon Tower Brock University'
Erect a 40' x 80' Frame Tent with Sidewalls
To Erect a 40x60 Tent with no side walls - Sept 15/2017 - Sept 17/2017
Install Kitchen Exhaust Hood and Fire Suppression Systemfor 'Pita Pit - Brock University' (formerly 'Ben & Jerrys')
New Catch Basin and Storm Line
To Erect a 40 x 100 Tent - Install August 16/17 Take Down August 21/17
Replace Ceilings and Spray Foam Fire Proofing at 'Brock University - Mackenzie Chown' (300 Level Classroom)
Replace Private Fire Hydrant Lead No w/o required per S Mills/cs
Uprgrade Access Control System in 'Brock University - Lowenberger Residence'
Demo Existing Greenhouse
Replace Plumbing Risers in 'Lowenberger Residence - Brock University'
Install 30 ft x 50 ft Tent - June 24/17 to June 26/17 for 'Canadian Mental Health Association'
To Erect 40 x 80 Frame Tent with Sidewalls Install: June 3, 2017 - Take Down: June 10, 2017
Construct a 2 storey addition and alter interior of Schmon Tower and Thistle Building - Brock University
Demolish existing Slab, Canopy, and Stairs
Replacement of Interior Potable Watermain Brock University Campus
Upgrades to the premise isolation back flow prevention (BFP) on the potable water lines serving Walker Complex D, Scotiabank Hall and Vallee Residence. All 3 buildings do not curre…
Construct a Cold Room in Cairns RM 429 - 'Brock University'
Alter Interior First Floor for new Kitchen, Office, and Universal Washroom 'Thistle Complex - Brock University'
Erect 20x60 Tent with Sidewalls
Alter Interior of Level 2 for new Office - 'Thistle Complex - Brock University'
To erect a 40 X 80 Frame Tent with Sidewalls Install Oct 14, 2016 - Remove Oct 16, 2016
Construct 3 New Bus Shelter Enclosures (1 @ 8.0 Ft x 20 Ft) & (2 @ 8.0 Ft x 16.0 Ft)
Construct East and West Additions and Alter Interior of 'Goodman School of Business at Taro Hall' - Brock University
Alter Interior of Gymnasium 2 - 'Walker Complex - Brock University'
To Erect a 40 ft x 60 ft Tent (No sidewalls) - Sept. 16/16 to Sept. 18/16 (Student Union Tent)
To Erect a 40' x 145' Tent w/o Sidewalls Sept 15 -18, 2016 (Red Dinner)
Alter Interior of Classrooms and Offices at 'Thistle and Schmon Tower - Brock University'
Replace Guards at 'Brock University - Schmon Tower - Level 300'
Erect a 40 ft x 50 ft Tent (no Sidewalls) at 'Brock University' - Erected June 23/16 and Removed June 25/16
Replace Fireproofing at MacKenzie Chown Complex (Classroom Ceiling) - 'Brock University'
To Erect 40' x 80' Tent with Sidewalls from June 6, 2016 to June 11, 2016 for Brock University.
Alter Interior of Sean O'Sullivan Theatre and Convert to Classroom - 'Brock University'
REPLACE EXISTING SWINGING DOORS WITH SLIDING DOORS (North Entrance) Brock 'U' The Cairn's Family Health & Bioscience Research Complex
Replace Existing DJ Booth
Erect 40 x 80 Tent With Sidewalls From October 16 - 18, 2015
Erect a Pole Sign - Scoreboard for 'Brock University'
To Erect A 40 ft x 180 ft Tent (with Sidewalls) from September 17, 2015 to September 21, 2015 for 'Brock University'
Demolish Existing exhaust hood, cap exhaust duct at ceiling with welded steel plate
Interior Alterations/Renovations To Teaching and Office Spaces, Demolition and Reconstruction Of Interior Walls, HVAC Improvements, New Ceiling Alterations
Alter Existing Sidewalk to Create 2 New Barrier Free Ramps
300 mm Storm Pipe From Field
Erect Tent With Sidewalls From June 7, 2015 to June 14, 2105
To Erect a Tent with No Sidewalks from May 13 - May 15, 2015
Repair Existing Roof Truss System, Remove/Replace Existing Insulated Metal Siding Panel On Upper Exterior Of Building
Barrier Free Accessible Washroom Renovation
REMOVE & REPLACE FIRE ALARM SYSTEM FOR 'Mackenzie Chown Complex & Greenhouse'
REPLACE EXISTING SWINGING DOORS W / NEW SLIDING DOORS IN VESTIBULE 208-A, EAST ENTRANCE - Cairn's Bio-Science Building
To Erect 40 ft x 80 ft Frame Tent c/w Sidewalls, From October 17, 2014 to October 19, 2014 for Brock University
Construct new Ramp, Stairs and Pergola Roof at 'Isaac's Bar and Grill - Brock University'
Alter Interior to Create new Fire ALarm Control Panel Room - 'Brock University'
Erect a 40 ft x 60 ft Tent (no side walls) from Sept 17/14 to Sept 21/14 - 'Brock University'
Erect a 40 ft x 140 ft Tent (with Sidewalls) from Sept 17/14 to Sept 21/14 - 'Brock University'
REPLACEMENT OF EXISTING ROOFTOP UNITS & STRUCTURAL ALTERATIONS (Lowenberger Residence, Brock University)
CONSTRUCT A 40 ft x 80 ft TENT WITH SIDEWALLS (Temporary) From June 1st - June 8th, 2014
To Erect a 40 ft x 80 ft Tent c/w Fabric Sidewalls And Glass Doors from May 21, 2014 to June 1, 2014
INTERIOR ALTERATIONS WELCH HALL (Laboratory - Brock University)
To Erect A 60ft x 90 ft Tent fromOctober 18 to October 20, 2013
Complex A - Backflow Prevention
Complex 'B' - Backflow Prevention
Complex C - Backflow Prevention
Complex G - Backflow Prevention
Complex 'E' - Backflow Prevention
Complex J - Backflow Prevention
Complex 'F' - Backflow Prevention
Complex D - Backflow Prevention
Erect 60 ft x 90 ft Tent With Glass Door(s) And Fabric Sidewalls from June 10 to June 16, 2013
Install 4 Automatic Door Operators to Existing Doors and Connect to Fire Alarm System at 'Brock University - Welch Hall'
HVAC Replacement, Structural Pads, Roof Alterations (Eleanor Misener Aquatics Centre)
ALTERATIONS TO CREATE LABORATORY CLASSROOMS (Room 209, Cairns Building)
Interior Alterations to - Walker Complex
Install 2 Hold Open Devices for 'Brock University' 'Student Alumni Centre'
Erect Tent - 60 ft x 90 ft (Oct 12 - Oct 14/12)
Construct a new Pavillion ('CATI SHELTER') for 'Brock University'
CREATE NEW FOOD SERVICE COUNTER FOR NEW COFFEE SHOP IN CAIRNS COMPLEX
Alter Interior of Labs C201 and C202 in 'McKenzie Chown Building - Brock University'
INTERIOR ALTERATIONS TO OFFICE SPACES - BROCK 'U' ( Mackenzie Chown Complex )
INTERIOR ALTERATIONS TO LEARNING COMMONS - BROCK 'U'
Repair Fire Damage to Suite 408 - 'Lowenberger Residence'
MINOR INTERIOR ALTERATIONS TO SOUTHBLOCK VARIOUS OFFICES - LEVELS 300 & 400, BROCK UNIVERSITY
ADD ROOF ACCESS STAIR TO MARKET HALL THISTLE COMPLEX - BROCK 'U'
Construct Tent 60ft x 90ft Between June 4/12 and June 10/12
Demolish Interior of Unit #408 (Lowenberger Residence)
Erect a 60 ft x 90 ft tent from October 21/11 to October 23/11 at 'Brock University'
UPGRADE FIRE ALARM SYSTEM (Brock University Vallee Residence)
INTERIOR ALTERATIONS AT BROCK ALUMNI CENTRE
REPLACE EXISTING WEST ENTRY DOORS AT WALKER COMPLEX
INTERIOR ALTERATIONS TO 2ND AND 3RD FLOORS (Welch Hall)
INSTALL A CHILLER PLANT AND COOLING TOWER
Erect a 60ft x 90ft Tent From June 6 2011 - June 12 2011 at Brock University
Install 4 Testable Devices (160 Non Testable) H block
CONSTRUCT STUDENT STUDY ROOMS ON 6TH FLOOR OF LIBRARY (Schmon Tower)
10 Metre Extension to 250 mm Watermain and One Fire Hydrant
CONSTRUCT NEW NIAGARA HEALTH & BIO SCIENCE RESEARCH COMPLEX
Erect a 60' x 90' Tent
INTERIOR RENOVATIONS FOR FOOD PREP AREA (Teriyaki Experience)
Alter Interior to Create new Reception Area
CONSTRUCT EXTERIOR CONCRETE WASH PAD
construct v-shaped ground sign (184 sq. ft.) 'Brock Bio Science'
Construct Ground Sign (184 sq. ft.) Brock Bio Science
ALTERATIONS TO DAVID S. HOWES THEATRE - 500 GLENRIDGE
Site servicing for new Bio Science building
Erect Tent - June 7 - June 13/10
Renovate Existing Offices and Barrier Free Washroom in Welch Hall
Secondary Buildings · Jul 23, 2026