189 Paris St has 29 municipal building permits on file in Ward 1. The latest recorded activity was a electrical permit dated Mar 12, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 8 mapped permits within 500 m of this address.
Electrical
Electrical
Commercial Parking
Commercial Parking
Electrical
Electrical
8 mapped permits within 500 m, shown on the intelligence map above.
9 other addresses on Paris St with municipal permit records in Boston.
This address has 29 permit records in PropertyLabs' public history and is located in Ward 1. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 189 Paris St is dated Mar 12, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 189 Paris St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Complete demolition of structure and foundation, backfill excavated foundation to meet existing gradesDIG SAFE #20210601054
The proposed job is to subdivide a 59,078 square foot lot into two parcels. The new parcel at 191 Paris Street will be made up of 30,375 square feet and the property at 189 Paris S…
Soil Test Borings to determine structural capacity of soil.
INSTALL 600 AMP SERVICE TO MODULAR CLASSROOMS
Legal Occupancy is School Certificate of Occupancy for;Six Modular Classrooms on site temporary for a one-year period. ALT260176 Issued 8/6/13
Make internal electrical conections for temp modular classroom buildin, and install fire alarm system. Electrical service by others
Install meter tails for water meter.
TEMPORARY USE - Assemble and operate 200KW generator to power modular classrooms.
Make temporary connections to modular class rooms until nstar finishes bring permanent power to classrooms
Install new plumbing fixtures.
Adding six Modular classrooms on site temporary for a one-year period; with fire sprinklers and handicap access per plans.
Temporary water and sewer service for Edward Brooke Charter School
This application is preparation;work for ALT260176 being reviewed by planning and;zoning for the;six Modular classrooms on site; all costs on ALT260176 -
Legal Occupancy:; School. ALT143305, Issued: 6/15/12
Legal Occupancy:; School. ALT143305, Issued: 6/15/12 *;Temp COO expires on 11/6/2012.; Second extension expires on 1/14/13,; third extention expires -3/21/2013- pending completion…
Misc cat5E voice/data cabling ONLY (classrooms/offices)
Fixture replacement
Cap off lines
INSTALLING 30 RECEPTACLES, AND REPLACING 25 LIGHTS
install new fire alarm and low rise evacuation system per 780 cmr 8th edition and all applicable state building compliance codes
Renovate class rooms including installation of non bearing partitions, flooring repair, painting, new doors/hardware, and minor plumbibng. Fire alarm system to be upgraded as per p…
Demolish non bearing partitions, existing kitchen, doorways, damaged flooring and clean out contents of building to make safe.
Advance up to 20 borings to a depth of 10-20 feet. Complete up to three of the borings as monitoring wells.
Plumbing Permit · PLUMBING · Jul 30, 2026