Building permit intelligence · Boston, MA
200 Clarendon St has 229 municipal building permits on file in Ward 4. The latest recorded activity was a electrical permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
1 mapped permit within 500 m, shown on the intelligence map above.
7 other addresses on Clarendon St with municipal permit records in Boston.
This address has 229 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 200 Clarendon St is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 200 Clarendon St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Other
Other
Renovations - Interior NSC
Renovations - Interior NSC
Other
Low Voltage
Low Voltage
Renovations - Interior NSC
Renovations - Interior NSC
Fast Track Application
Fast Track Application
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Plumbing
Plumbing
Plumbing
Low Voltage
Electrical
Electrical
Fire Alarm
Fire Alarm
Electrical
Electrical
Low Voltage
Low Voltage
Fire Alarm
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Offices, Function Room, Coffee Service, Bar &; Radio Station;Certificate for Offices - 25th FloorALT1790320 Issued 11/3/2025
Kirkland & Ellis - 51st floor interior renovation for office renovation work includes drywall, electrical/low voltage/power /fire alarm, sprinkler, plumbing HVAC/mechanical and fin…
Project 20903 - Install AV System on 30th Floor
Project 20878 - Make-safe demolition, temp lighting & power.
Low voltage and AV wiring for Cormorant at 200 Clarendon Street Floor 50.
Demolition of existing controls - PXCM, FCUs, FPVAVs, VAVs, HP, exhaust fan, new PIU zone, FTR zones (to nearest DXR), leak sensors. NAVI178
Offices, Function Room #36, Coffee Service, Bar , Radio Station, Bank, Wireless Communication and Cafe' w/TakeoutCertificate; for Offices on the 50th; floor.ALT 1733317 Issued 7/9/…
Demo only for plumbing scope.
S26-202 - Connect modular workstation wiring to existing office circuitry.
Addition of kitchen to office space.
Remodel of existing tenant space.
Installing new fire alarm devices in tenant space on floor 50. (Cormorant)
Kirkland & Ellis - 51st floor remove existing offices to prepare for new tenant fit out work includes demo of drywall, remove mech, remove electrical/lighting, remove ceiling and f…
Interior office space tenant renovation of 4,222 SF of the 50th Floor of 200 Clarendon St. Scope includes selective demo, new finishes, and necessary make-safe of fire protection,…
Reference Permit # ALT1812277 PLEASE Interior office space tenant renovation of 4,222 SF of the 50th Floor of 200 Clarendon St. Scope includes selective DEMO. Corderman and Company…
Offices, Function Room #36, Coffee Service, Bar , Radio Station, Bank, Wireless Communication and Cafe' w/Takeout;Certificate for Offices on the 19th floor.ALT 1753437 Issued 8/4/2…
Connecting 2 furniture Feeds on the 19th Floor of 200 Clarendon St.
Offices, Function Room, Coffee Service, Bar &; Radio Station;Temporary Certificate Offices on floors 4th and 6th Pending Completion of work Expires on; 4/15/26ALT 1759115 Issued 9/…
20 security devices on the 4th & 5th floors of 200 Clarendon St for tenant Bain Capital TK-256325
Installing new FA devices in tenant spaces on floor 4 & 6. (Bain)
Connecting 273 Furniture Stations. 198 on the 4th floor and 75 Furniture Stations on the 6th Floor.
Lighting and Power Upgrades to the 41st Floor CEO office
Offices, Function Room #36, Coffee Service, Bar, Radio Station, Bank, Wireless Communication and Cafe' w/TakeoutCertificate For Offices - 50th Floor;ALT1732789 Issued 06/24/2025
Low Voltage - 4 idf closet builfdouts @ 200 Clarendon st
TA Associate - 56th floors replace existing interior doors with new and new millwork
De-Energizing building for annual maintenance and testing of switchboard, breakers.
Connect furniture feeds for 9 cubicles
Adding 18 - new data drops in the 25th fl
Network wiring for Arctos
Job #20404 Bain Capital Floors 4-6 AV System Install
Renovations of space on the 25th Floor. Work includes new Offices, Conference Rooms and Common Areas. Includes Demolition, Drywall, Patching, Painting, Flooring, Ceilings, Millwork…
Connect Furniture feeds for 52 office cubicles
Fire alarm scope associated with tenant renovations on the 25th floor. Demo (1) smoke detector & remote alarm indicator + (2) audio visual devices, per engineered drawings.
Electrical scope associated with a tenant renovation on the 25th floor. New receptacles, light fixtures, & lighting controls to be installed.
Amendment to permit ALT1759115 for FP review. All documents are in the ALT submission
Demo existing controls - new VAVs, PIUs, EHC, exhaust fan. NAVI65
Demo existing controls - new PXCMs, PIUs, FPTS, VAVs, heat pumps, leak detectors. NAVI63
Install one new panel per floor, VAVs, WSHPs, FPBs, HWRH, PIUs, transfer fans, CRU, leak detectors. Bain MS-10611
Renovation of bathrooms in office space.
Furnish and Install (1) 2" empty EMT conduit. Approx length is 150' Install (1) L5-30R outlet for small rack mount UPS
26 telecom drops on the 53rd floor of 200 Clarendon Street for tenant Kirkland & Ellis Sublease CZ-257460
Low Voltage Wiring permit for Tel/Data for Wheelock Street Capital at 200 Clarendon St 19th Floor
200 Clarendon 50th fl Arctos Demo, new control wiring for 6 fan powered boxes, 1 ex fan, re zone PIU thermostats and 2 new PIU's. NAVI161
Low voltage renovation - Floors: 30, 32 and 33 TD Outlets: 784 Security: 35
Plumbing connections for an office reno.
Converting a conference room into 3 different offices on the 41st floor. Removal of a partition wall, and adding new partition walls, included the relocation of 9 FP sprinkler head…
Electrical Fire Alarm Work Associated with Tenant Fitout on the 30th Floor
Electrical Fire Alarm Work Associated with Tenant Fitout on the 31st Floor
Electrical Fire Alarm Work Associated with Tenant Fitout on the 32nd Floor
Electrical Work Associated with Tenant Fitout on the 30th Floor
Electrical Work Associated with Tenant Fitout on the 31st Floor
Electrical Work Associated with Tenant Fitout on the 32 nd Floor
Offices, Function Room #36, Coffee Service, Bar , Radio Station, Bank, Wireless Communication and Cafe' w/TakeoutCertificate for Offices - Floors 13,14,15 &; 23ALT1713877 Issued 4/…
K &; E - 53rd floor renovating existing offices work includes new data/electrical work to connect furniture, security cabling work and refresh paint and finishes.
Offices, Function Room #36, Coffee Service, Bar , Radio Station, Bank, Wireless Communication and Cafe' w/TakeoutCertificate for Offices on the 28th floor South Side.ALT 1701760 Is…
Lighting and Power upgrade to the 4th and 6th floors @Bain Capital
Tel Data work on floor 28
Job #19854 Arrowstreet Capital 28th AV System Install
Interior renovation of 95,000 sq ft of existing space located on floors 4 and 6. The scope will include new office space, drywall and glass partitions, millwork, wall finishes, flo…
Job #19933 High Vista 50th Floor Refresh Project
Job #19933 High Vista 50th Floor Refresh Project
20 telecom drops on the 19th floor of 200 Clarendon St for tenant TCW AV CZ-257330
Electrical Fire Alarm work Associated with Tenant Fitout on the 19th Floor
Electrical Work Associated with Tenant Fitout on the 19th Floor
Job #19863 Bayhawk Capital 25th Floor Renovation
74 telecom drops on the 50th floor of 200 Clarendon Street for tenant Highvista Strategies CZ-257400
Offices, Function Room #36, Coffee Service, Bar , Radio Station, Bank, Wireless Communication and Cafe' w/Takeout;Certificate for Office Space - Suite 1901ALT1704670 Issued 4/14/20…
Offices, Function Room #36, Coffee Service, Bar , Radio Station, Bank, Wireless Communication and Cafe' w/Takeout;;Certificate for Office Space - Suite 1902ALT1686411 Issued 3/14/2…
Renovation of pantry in Wheelock Street Capital space, 19th floor
Insulation and Installation of plumbing fixtures and connections on the 50th floor of an multi story commercial building.
Furniture feeds to 46 Stations at 200 Clarendon St. Hancock Tower
EY 171 Cables Office Space 25-0100-10
Renovation to the 30-32 floors including MEPFPs, finishes and conference rooms, occupancy of each floor to occur prior to construction of the next this will require TCOs.
Tenant fit out with selective removal of finishes and partitions, & new interior finishes and partitions with necessary changes to MEP equipment and fixtures. No planned changes to…
OME JOB#25-063 200 Clarendon St - Adage Capital Locker Room. F&I new light fixtures in the locker room.
Demo to reno on 50th fl. Install 1/pantry sink, 1/bottle filler, 1/electric water heater. Final kitchen connections for 1/dishwasher, 1/coffee maker, 1/ice maker & 1/refrigerator.…
Electrical work associated with tenant fitout on the 50th Floor
Electrical Fire Alarm work associated with tenant fitout on the 50th Floor
Ernst and Young Floors 13,14,15. This is a phased job. 13th fl controls on 1 VAV,4 Fan Powered boxes, 2 PIU's, 3 relocated stats and 1 CRAC unit. 14th fl controls on 2 VAV's 2 Fan…
Interior office space tenant renovation of 18000 SF of the 50th floor of 200 Clarendon St. Scope includes selective demo, new finishes, and necessary make-safe fire protection, plu…
200 Clarendon 28th FL Arrowstreet Controls Install. Install Siemens Controls nine new Fan powered boxes, thirteen zones of perimeter induction units and 1 new panel in 2 areas of f…
On Level 51, Disconnect existing fixtures and installing new: 2/sinks & Faucets, 2/Toilets,1/shower & 1/floor drain.
Please reference approved Permit SF1725159. This application is to turn the sprinkler heads up ONLY during the removal of the ACT ceilings on floors 4 and 6, in order to keep the N…
Electrical Work Associated With Tenant Fitout on the 56th Floor
Interior office space tenant fit-out of 4000 SF of the 50th floor of 200 Clarendon St. Scope includes selective demo, new finishes, and necessary make-safe of fire protection, plum…
19th FL BXP Offices Install Low Voltage controls on 4 fan powered boxes, 1 VAV, 2 PIU's and a leak detector NAVI149
19th FL Common Areas. Install low voltage controls on 2 VAV's NAVI148
19th floor 200 Clarendon St 1 IT room buildout consisting of 2 racks Cat 6 networking wiring for the following below Security 7 total doors with card readers
Installation of Plumbing for a tenant fit out on the 28th floor,
additional work needed under SF1729220 on the 56th floor to relocate existing sprinkler, WORK DOES NOT EFFECT EGRESS NO STRUCTURAL
TA EA work stations - 56th floor remove singe workstation and replace w double workstation, work includes removal, carpet patching, lighting and electrical rework, and finishes. NO…
Addition of kitchenette for office space on 19th floor
Renovation of multiple gang bathrooms on 19th floor.
Renovation of 28th floor South (Arrowstreet) including finishes, MEPS relocation and new, low voltage and furniture, skyfold partition installation. Place of assembly to be filed.…
Interior removal of non structural wall partitions, floors, and ceilings back to base building on floors 4 and 6. sprinker heads will be turned up. generic space
Electrical work associated with tenant fitout on floors 13th, 14th & 15th.
Electrical Fire Alarm Work associate with tenant fitout. Level 28th North & South
Interior office renovation on the 51st floor to include selective demo, new millwork, drywall, architectural finishes, plumbing and electrical.
Electrical Fire Alarm work associated with tenant fit out on floors 13th, 14th & 15th.
Job #19328/19329 Boston Properties 19th Floor Common area & management office renovations, including (2) 100A 42 ckt panels.
;Function Room #38, Coffee Service Offices, Bar, Radio Station, Bank, Wireless Communication and Café w/takeout;;Certificate for Amenities Spaces on Floor 3rd floor and Common Area…
Renovation to install 1-sink, 1-floor drain, 1-electric water heater, 1-thermo mixing valve, 1-trap primer, 1-water hammer arrestor
Electrical Work Associated with Tenant Fitout on the 28th Floor. Installation of new lighting fixtures, controls & receptacles throughout
Renovations of space on Floors 13, 14, 15 and 23 for EY. Work includes removal of finishes, drywall, patching, painting, flooring, ceilings, millwork, HVAC, Plumbing, Electrical, F…
S24-463 Arrowstreet Capital - Provide Labor and Materials to install the Manufacturers electrical jumpers between the new Workstations using the provided circuitry
S24-464 Arrowstreet Capital Phase II - Provide Labor and Materials to install the Manufacturers electrical jumpers between the new Workstations using the provided circuitry
Job #19328/19329 Boston Properties 19th Floor Common area & management office renovations
Interior Office Renovation 19th Floor Common Corridor and Restrooms to include framing, ACT, new finishes, modifications to FA and FP systems
Interior office renovation 19th floor BxP office to include new framing, ACT, finishes, modifications to the FA & FP systems
Job #19159 Bain Capital 44th Floor Office Rework
Renovation of Pantry and Sink Area's, and installing water heaters.
200 Clarendon Street - 28th Floor North (Arrowstreet)= Construction of new furniture & lighting to include finishes, electrical, and low voltage. Future ALT permit to be filed for…
200 Clarendon 19th FL TCW. Install Low Voltage Siemens controls for fit-out. Install controls on VAV's, Fan Powered boxes, PIU's, Misc points and panel. NAV-145
OME JOB#24-056 200 Clarendon St - Adage Pantry Modifications. F&I (2) new recessed downlights, relocate (1) recessed downlight & (2) switches to accommodate new closet layout.
Interior office renovation of the 19th floor. Work to include modification to the fire alarm, sprinkler and construction non-structural walls for new office layout.
Interior renovations to existing space. No structural, no change of egress, no modifications to Fire alarms/sprinklers
Job #19146 TCW 19th Floor renovations; (1) 225A 84ckt, (3) 225A 42ckt, (5) 100A 42ckt panels
Job #19146 TCW 19th Floor Renovations
Convert two open areas into storage rooms. Install new millwork and finishes. No changes to egress paths, occupancy use group or occupancy count.eplan
Electrical maintenance for lighting and general power.
Job #18999 JHT Floors 7 & 61 Remove & replace panels; (1) 1200A & (1) 800A.
Job #18957 Jacobs 5th Floor Install new receptacles and wiring.
Function Room #38, Coffee Service Offices, Bar, Radio Station, Bank, Wireless Communication and Café w/takeout;;Certificate for Offices - 49th FloorALT1617318 Issued 7/29/2024;
S24-1238 Connect new Workstations to existing circuitry.
Job #18768 John Hancock 19th Floor Miscellaneous electrical demo to accommodate new demising wall.
S24-1153 Provide Labor and Materials to install the manufacturers electrical jumpers between the added workstations using the provided circuitry
TA associates – sub-tenant space 200 Clarendon St. 49th Floor td/sec/sm
S24-1153 Provide Labor and Materials to install the manufacturers electrical jumpers between the added workstations using the provided circuitry
De-energized electrical testing and maintenance
;19th;floor - removal of interior partitions &; adding new interior GWB partition. Make safe M/E and adding temp lights. Minor upgrades to architectural finishes. Will be tied to a…
Temp generator power for film production. (AND ONLY TEMP GENERATOR POWER) Set 11-3-2024 Tatte
minor renovation to the 18th floor
Install new conduit and wiring from existing MCC switches to New VFD's. Install new VFD's and wire to new Chilled Water Pumps on 61st floor. JCC444
Network wiring for Adage 4 locations
Electrical Work Associated with Tenant Fit Out. Installation of Fixtures & Receptacles on the 47th Floor
Partial renovations to 46th floor IT workroom
Installation of AV cabling and equipment for office on the 49th floor.
Convert an open area into a copy/coffee bar. Subdivide 2 large rooms into 2 small offices each; convert 1 storage room into a private office. No changes to egress paths, occupancy…
24-0061-10 AV TA Associates 49th Floor
JHT Amenities Install Low Voltage controls at 200 Clarendon 3rd floor Amenities project. Scope includes 1 small AHU on 7th floor and 3 EX fans. A small portion of 4t floor will be…
Function Room #38, Coffee Service Offices, Bar, Radio Station, Bank, Wireless Communication and Café with Takeout;Certificate for Offices - 45th FloorALT1598290 Issued June 17, 202…
Removal and replacement of a kitchen sink on the 52nd floor,
4 telecom drops on the 46th floor of 200 clarendon street for tenant Kirkland & Ellis IT Workroom CZ-247741
Low Voltage Wiring permit for Tel/data, AV & speaker for BXP 200 Clarendon Amenity Space at 200 Clarendon St 2nd and 3rd Floors
Access control, CCTV, and Intercom installation
Installation of a wall and door to create a lockable IT room. Work to include non- structural framing, act and flooring repairs.
Provide wiring for 5 access doors and 5 cameras on the 49th floor Paul Hastings
Job # 18444 TCW 200 Clarendon St 51st Floor Furnish and installation of (5) TD locations
Job # 18444 TWC- 200 Clarendon St 51st Floor Furnish & Install (3) furniture feeds
Job #18468 Charlesbank 54th Floor Office Conversion Project
Electrical Work Associated With Tenant Fitout on the 47th Floor. Installation of new receptacles.
Electrical Work Associated with New Tenant Fitout Located on 49th Floor South Side of the Building.
Electrical Fire Alarm Work Associated With New Tenant Fit Out On 49th Floor South Side of the Building.
Interior tenant office renovation on the 18th floor of an existing building. Scope includes selective demo, Glazing, drywall, ACT, flooring, painting, tel/data and necessary mechan…
Division of two existing offices into (4) smaller offices. Total of (2) partitions. No fire alarm or sprinkler work.
Offices, Function Room #38, Coffee Service, Bar, Radio Station, Bank, Wireless Communication and Café with takeoutCertificate for Offices 45th &; 46th floorsALT1547753 Issued Decem…
Job #18357 Bain Capital 6th Floor Lighting upgrades.
200 Clarendon 49th floor South Side. Install HVAC controls. NAVI 116
Architectural and MEPFP build-out for 3rd floor amenities program; fitness center and multi-purpose assembly spaces. Additionally, architectural and MEPFP renovation will occur as…
Offices, Function Room #38, Coffee Service , Bar, Radio Station, Bank, Wireless Communication and Café with takeoutCertificate for offices 49th floorALT1538638 Issued 11/5/23 &; A1…
TA South side - Tenant build out - 49th floor tenant work includes drywall, electrical/fire alarm, sprinkler, plumbing , HVAC, and finish work, work began on original permit ALT 15…
Demo/Reno for 3rd floor and 3rd/floor mezzanine: Install Water closets, lavs, showers, mop sinks, drinking fountain, urinals, Electrical Water heaters, floor drains, grease interce…
Refreshed finishes and new millwork in the existing 52nd floor pantry. Plumbing scope is limited to sink & faucet replacement in existing locations.
Job #18185 JHT Amenities 3rd Floor Electrical fit out
Job #18185 JHT Amenities 3rd Floor Electrical fit out; (4) 150A 42 ckt panels & 8 VFD's
Network wiring for Novo Holdings
;Offices, Function Room #38, Coffee Service , Bar, Radio Station, Bank, Wireless Communication and Café with TakeoutCertificate for Offices on the 17th FloorALT1564580 issued March…
Electrical Work Associated With Tenant Fitout on the 45Th Floor. Installation of New Fixtures and Receptacles.
Electrical Fire Alarm Work Associated With Tenant Fitout on the 45th Floor. Installation of 3 New Strobes.
Revise ALT 1538638 into 2 phases - TA Associates PHASE I buildout and occupancy. PHASE II new tenant to be resubmitted under separate permit once plans are designed.Fire protection…
Job #18170 Bain Capital 38th Floor Electrical Renovations
Selective demolition, then construction of five (5) new offices on the 45th floor at 200 Clarendon Street. Architectural finishes, lighting. NOTE: No Structural or Plumbing scopes
OME JOB#24-056 200 Clarendon Street - Adage Capital Pantry Modifications. F&I Lighting & power per the engineer's drawings.
16 telecom drops on the 38th floor of 200 Clarendon Street for tenant Bain Capital 38th CZ-247325
Demolition of 6 private offices and changing 16 desks to open work space. Work will consists of new interior walls, flooring, and desk installation.
Offices, Function Room #38, Coffee Service, Bar, Radio Station, Bank, Wireless Communication and Café with takeoutTemporary Certificate for Offices 45th &; 46th floors.; Phased pro…
Demolition of plumbing systems on 3rd floor. (885661-1)
Removal of antenna and transmission line on roof-top
Job #18102 High Sage 59th Floor Furniture reconfiguration