201 Washington St has 224 municipal building permits on file in Ward 3. The latest recorded activity was a fa permit dated Jul 13, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Fire Alarm
Change Occupancy
Electrical
Plumbing
Plumbing
Low Voltage
2 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Washington St with municipal permit records in Boston.
This address has 224 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 201 Washington St is dated Jul 13, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 201 Washington St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Low Voltage
Electrical
Electrical
Electrical
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Electrical
Plumbing
Electrical
Plumbing
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Electrical
Electrical
Electrical
Electrical
Electrical
Plumbing
Fast Track Application
On the 10th floor, Build out of new offices & meeting rooms, collaboration areas, open offices, new kitchen pantry, upgrade existing restrooms & addition of 2 single occupancy rest…
On the 5th floor, Build out of new offices & meeting rooms, collaboration areas, open offices, new kitchen pantry, upgrade existing restrooms & addition of 2 single occupancy restr…
Electrical
Electrical
Low Voltage
Deenergize electrical for testing and maintenance
Project 19751 Selective demo of offices, install (12) 2x2 lights and install (4) new furniture feeds on 14th floor
Selective Removal of 5 existing offices on the 14th floor to build out open office area for new workstations, install new finishes as needed to match existing, new lighting, reloca…
;Offices, Garage, Wireless Comm, Restaurant with takeout, Commissary, and Restaurant Wolfgang's;Certificate for Office on the 22nd floor.; ALT1684539 Issued February 07, 2025
Offices, Garage, Wireless Communication, Restaurant with Takeout and Commissary, and Additional Restaurant;Certificate for Offices - 39th FloorALT1669736 Issued 12/5/2024
Installation of low voltage telecommunications cabling.
Job #19097 Freeman, Mathis & Gary 22nd floor Existing tenant renovation with new lighting and general power to accommodate architectural changes.
Tenant Fitout - 22nd Floor Fire Alarm
The project consists of tenant fit out with selective removal of finishes and partitions, & new interior finishes and partitions with all necessary changes to MEP equipment and fix…
Demo existing light fixtures & Romex wiring and replace with new fixtures and MC cable.
Demo existing light fixtures & Romex wiring and replace with new fixtures and MC cable.
Renovate existing storage space & offices space on the 4th floor to include new drywall partitions, acoustical ceilings, light fixtures & new flooring, demo & relocation of existin…
Disconnect and reconnect existing lighting and install per new layout. Install general purpose receptacles.
Installation of Plumbing for a kitchen sink on the 39th floor,
Build out of new spec suite on the 39th floor from shell space to include new offices, conference room &; kitchen area, all new finishes, ceilings, light fixtures, reworked HVAC sy…
Demo & Rebuild of existing storage space on the 17th floor to include new drywall partitions, metal cages, light fixtures, reworked sprinkler line & new fire alarm devices, no HVAC…
Southern Wing of Floor 39 Temp Power, Install Light Fixtures & Controls, Fire Alarm Devices, Receptacles, and Mechanical Power.
Southern Wing of Floor 39 Temp Power, Install Light Fixtures & Controls, Fire Alarm Devices, Receptacles, and Mechanical Power.
Install low voltage cable and system components associated with an AV system upgrade at 201 Washington Street for BNYM
Provide power to light pole in sidewalk at 201 Washington St. Install a handhole in the sidewalk and conductors to Eversource manhole. Install Htap and 30 amp fuse to power cellula…
Demo & renovate existing building restrooms, corridor and elevator lobby with new lights, receptacles and fire alarm devices.
Demo & renovate existing building restrooms, corridor and elevator lobby with new lights, receptacles and fire alarm devices.
Demo & Rebuild existing building restrooms, common corridor and elevator lobby on the 38th floor to include install of all new finishes, light fixtures & ceilings, minor HVAC upgra…
Removal and replacement of core bathroom fixtures on the 38th floor,
Selective Removal of finishes in 38th floor common area & restrooms and MEP Make Safe for upcoming Alterations per ALT# 1603863.
Demo
Demo
Job #18117 Insight Global 14th Floor Installation of (1) 100amp feed and 100amp panel to accommodate new IDF room with receptacles at racks.
Offices, Garage, Wireless Comm, Restaurant with takeout and Commissary, and Additional Restaurant Wolfgang's;Certificate for Offices and Conference Rooms on 36th FloorALT1542578 Is…
Fire Protection Incorporated, (FEI) proposes to install a Fike Proinert,(Argon) Clean Agent Fire Suppression System, for the Server Room, at 201 Washington Street, Suite 2700, Bost…
Six (6) Residential UnitsCertificate for the same.ALT1287819 Issued 5/24/22, A1447385 Issued 3/17/23 &; A1480998 Issued 1/23/24
Amendment to ALT1287819 - First and Second floor plans of Unit 5 to be swapped. Original 1st floor plan for Unit 5 to become 2nd floor plan. Original 2nd floor plan of Unit 5 to be…
Installation of Plumbing for a kitchen sink on the 36th floor,
Category 6 Cabling for Workstations & Wireless Internet
36th Floor - office fit out, power, lighting, fire alarm
36th Floor - office fit out, power, lighting, fire alarm
Scope of work: Expansion of existing office space on the 36th floor into vacant space for new tenant includes new offices, conference rooms, all new finishes, new lighting, upgrade…
Renovations of existing conference room
Install 18 Dual Network outlets
Install new Light fixtures, and power outlets on the 3rd floor @ One Boston Place 201 Washington St. 3rd Fl.
3rd floor conference room renovation. New lighting, new glass fronts, new finishes. Work on 2 sprinkler heads. No Fire Alarm scope, no egress change, no structural work.
Demo of two non-structural partitions. New ceilings and flooring, paint, adding power to IT closet, new power and data for 12 new workstations. Lowering 4 sprinkler heads. Minor HV…
Fit out of (2) offices and (1) conference room including lights, receptacles, tele/data wiring, fire alarm wiring, demo, temp lighting & power.
Fit out of (2) offices and (1) conference room including lights, receptacles, tele/data wiring, fire alarm wiring, demo, temp lighting & power.
Fit out of (2) offices and (1) conference room including lights, receptacles, tele/data wiring, fire alarm wiring, demo, temp lighting & power.
Installing new fire alarm devices in tenant space on the 36TH floor (CC & Restroom Renovations).
Relocating fire alarm devices in tenant space on the 30th floor (Whitebox).
Installing fire alarm devices in tenant space on the 39th floor (Whitebox).
Installing new fire alarm devices in tenant space on the 39th floor (CC & Restroom Renovations).
Schneider Electric-In existing office space on the 27th floor, provide new power for furniture walls to create new conference room & 2 offices, new minor HVAC, new light fixtures,…
Remodeling of building Core Bathrooms on the 36th and 38th floors,
renovation of existing bathrooms and hallway
Installing 25 new fire alarm device for the renovation of the common corridors and bathrooms on floor 36 & 39.
Electric service
offices, garage, wireless comm, restaurant with takeout and commissary, and additional restaurant wolfgang's #offiecs, garage, wireless comm, restaurant with takeout and commissary…
Selective demo/removal and Whitebox of tenant space on the 39th floor, scope includes removal of all partitions, finishes, ductwork and plumbing fixtures. New scope includes all ne…
Selective demo/removal &; Whitebox of tenant space on the 30th floor, scope includes removal of all partitions, finishes, ductwork and plumbing fixtures. New scope includes all new…
Removal of common area finishes& in restrooms on the 39th floor, includes all new ceilings, lighting, flooring & glass doors in corridor, Bathroom includes all new tile, new ceilin…
Removal of common area finishes & in restrooms on the 36th floor. Scope includes all new ceilings, lighting, flooring & glass doors in corridor, Bathroom includes all new tile floo…
Install low voltage cable and system components associated with an AV system upgrade at 1 Boston Place (201 Washington St) for Sverica.
Low Voltage wiring permit for Sverica at One Boston Place (201 Washington St, unit 3910, Boston, MA 02108
new gas lines
Installation of new fire alarm system in existing residential structure under going level III alterations and additions.
Partial floor renovation. Including demo of area, New light fixtures, new receptacles, power to new heat pump.
Demo 4 existing speaker strobes and add seven new fire alarm Speaker Strobes
Demo and infill of existing communication staircase between 29th & 30th floor. Scope includes demo of existing stair & infill with structural steel, decking & concrete. E plans
Install 3 cameras, 1 intercom, and 1 intercom master station.
Interior renovation of a partial 39th floor which includes minor demolition of existing finishes, new finishes (Millwork, walls, ceilings, flooring) and reworking of MEP'S
39th Floor - Demo make safe for demising wall.
Amendment to permit ALT1287819. This amendment seeks to formalize the merging of a portion of the neighboring lot into 201 Washington Street, Brighton. This lot consolidation plan…
Tatte 2nd floor; Disconn. old equipment being removed, ran feed for Roof ex. Fan , add receptacles in office & in work area, Replace lights
In existing office space build new demising wall to create 2 tenant spaces on the 39th floor to include selective demo, install new drywall partitions, patching of finishes, reloca…
Install wiring within office cubicles on 33rd floor for Jams-Boston.
Offices, Garage, Wireless Communication, Restaurant with takeout and Commissary, and additional Restaurant.;Certificate for Offices 19th &; 20th floorsALT1307839 Issued 4/8/22
Offices, Garage, Wireless Communication, Restaurant With Takeout And Commissary, And Additional Restaurant Wolfgang'sCertificate For Offices / 14th FloorALT1337667 Issued 6/28/2022
Stairwell installation between 19th & 20th floor requiring new lighting layouts.
Install wiring within office cubicles on 14th floor for BNY Mellon.
5 new condo
Construct an interconnecting stairwell between floors 19 and 20 within a tenant space currently being renovated under ALT1307839; all work, including sprinkler fire protection work…
Electrical
Quebec Government Project: Remove existing carpet and install new carpet tiles, Paint existing walls, Replace existing millwork cabinets.
Offices, Garage, Wireless Comm, Restaurant w/takeout and Commissary, and additional restaurant Wolfgang's SteakhouseCertificate For Offices;33rd floor;Alt 1319545 issued 4/19/22
Offices, Garage, Wireless Comm, Restaurant with Takeout and Commissary, and Additional Restaurant Wolfgang's;Certificate For Common Areas;;- 21st / 22nd Floors-; OnlyAlt 1329917 is…
REPLACE 150 LIGHTS TO LED LIGHTS
Install 2 outlets, relocate 1 outlet, wire new AC unit
(97) data locations consisting of furniture and wall locations, (12)new wireless locations @ 201 Washington Street, Boston MA 14th floor
Stair infill project on 21st and 22nd floors. Fire alarm A/V addition 22nd floor to accommodate new architectural layouts.
Stair infill project on 21st and 22nd floors. Lighting and power adds/modifications to new architectural layouts.
Audio Visual Install
Renovation of the 14th Floor requiring new fire alarm devices to accommodate new architectural layouts.
Renovation of the 14th Floor to include new lighting and power to accommodate new architectural layouts.
Re-termination of existing data cabling. Adding 22 Additional cables
Renovation of existing kitchenette sink, Quebec Government Office space
Tenant Renovation of Kitchenette and restrooms 14th Floor
Selective demolition of non-load bearing partitions and ACT. New architectural finishes to include: drywall, flooring, ceiling, and painting.
Offices, Garage, Wireless Communications, Restaurant w/Takeout And Commissary, And Additional Restaurant Wolfgang's Steakhouse;Certificate for: Offices, Break Rm/Conference Room -…
S22-419 East Coast Office Cross Harbor Capital Installation of the electrical interconnections between the added workstations using the provided circuitry
access control for 6 doors
For "BNYM" on the 14th floor, Scope: Build out new offices & meeting rooms, new kitchen pantry area, collaboration areas, upgrade to existing restrooms & addition of (2) single occ…
Single wire network drops – 300 Locations , Access Control – 23 Doors @ One Boston Place – 201 Washington Street Boston, MA 02108 FLOORS 19 & 20
Installing plumbing fixtures in existing kitchen and bathroom on 19th and 20th floor.
22-0125-10 BNY Mellon 12th Floor Low Voltage Cabling for A/V 1 Boston Place. 12th Floor
Offices, Garage, Wireless Comm, Restaurant w/takeout And Commissary, And Additional Restaurant Wolfgang's Steakhouse;Certificate For Offices/12th FloorALT1283606 Issued 2/23/2022 ,…
Tenant renovation of the 19th & 20th Floor to include new fire alarm device installations.
Tenant renovation of 33rd Floor to include new lighting fixture and power installation.
Tenant renovation of the 33rd floor to include new fire alarm device installation.
Tenant renovation of the 19th and 20th floor to include new lighting fixture and power installation.
Tenant renovation of the 19th & 20th Floor to include new fire alarm device installations.
Tenant Renovation of the 19th & 20th Floor to include new lighting fixture and power installation.
Rehabilitation of the existing two-story Pierce House and the addition of five multi-level dwelling units for a total of six condominium units.
Installation of low voltage telecommunications cabling.
Install wiring within office cubicles on 12th floor for BNY Mellon at 1 Boston Place
Boston Financial - 21st / 22nd Floor -; Demo &; infill existing communicating stair between 21st &; 22nd floor, includes demo of stairway &; finishes, new structural infill, deckin…
Addition of kitchen to existing office space.
Offices, Garage, Wireless Comm, Restaurant w/takeout and Commissary, and Additional Restaurant Wolfgang's Steakhouse;Certificate for Offices 23rd floor at 201 Washington -OnlyAlt 1…
Offices, Garage, Wireless Comm, Restaurant w/takeout and Commissary, and additional restaurant Wolfgang's Steakhouse;Certificate for Restroom;;on the 23rd floor at 201 Washington-O…
Offices, Garage, Wireless Comm, Restaurant w/takeout and Commissary, and additional restaurant Wolfgang's Steakhouse;Certificate for Common Corridor and Elevator Lobby 32nd floor a…
Offices, Garage, Wireless Comm, Restaurant w/takeout and Commissary, and Additional Restaurant Wolfgang's Steakhouse;Certificate for Restroom 32nd floor at 201 Washington Street -O…
Offices, Garage, Wireless Comm, Restaurant With Takeout And Commissary, And Additional Restaurant;Certificate For Offices on 38th FloorALT1278713 Issued 1/13/2022
Network wiring for Cross Harbor on 23rd floor
Install Category 6 cabling for workstation locations
JAMS - 33rd Floor -; Interior Office space build-out on the 33rd floor of 1 Boston Place. Scope includes selective demo, millwork, DFH, glazing, drywall, ACT, flooring, painting, a…
Install wiring within office cubicles on 12th floor for BNY Mellon
Offices, Garage, Wireless Comm, Restaurant w/Takeout And Commissary, And Additional Restaurant Wolfgang's Steakhouse;Temporary Certificate For Offices on 28th Floor Only ( Phase 1…
WSGR Boston - 19th &; 20th Floors -; Office renovations per plans and specification submitted.
Installation of Card Access security devices at Crossharbor Capital Partners LLC, 1 Boston Pl, Floor 23, Boston 02108 (010-07363-13)
Installation of low voltage A/V devices w/ associated wiring. Work to be completed at: CrossHarbor Capital Partners LLC - 23'rd Floor One Boston Place
In existing office space on the 13th floor build new demising wall, rework ceiling as needed and reverse swing of IT door, add 1 fire alarm device. No sprinkler, HVAC or mechanical…
Tel Data Fitout for renovated space in suite 3510.
Minor renovations to office space on the 38th floor to include removal of carpet & pantry flooring, remove and relocate 1 non egress door, add new flooring & paint, no sprinkler or…
In existing office space on the 35th floor build out a new Mother's Room, new drywall partition, door & minor electrical changes, new paint & carpet, relocate 1 sprinkler head, no…
Build out offices for BNY Mellon on the 12th floor to include offices, meeting rooms, collaboration areas, kitchen/pantry area, all new updated finishes, MEP work to include sprink…
Renovation of 12th Floor with new lighting and power for new architectural layouts.
Renovation of 12th Floor with new fire alarm for new architectural layouts.
Installation of Plumbing for a kitchen sink on the 38th floor,
(85) data locations consisting of furniture and wall locations (10) new wireless locations One Boston Place 12th floor
Interior restroom renovation on the 23rd floor at 201 Washington Street (One Boston Place)- to include selective removal of finishes, new architectural finishes such as GWB partiti…
install 10 toilets, 3 urinals, 7 lavs, 4 kit sinks and 1 floor drain on the 12th floor at 1 Boston Place
In existing office space on the 12th floor, perform prep demo and make safe for upcoming tenant build out(ALT#1283606),make safe electrical, mechanical & plumbing, removal of all f…
Interior common corridor and elevator lobby renovation on the 32nd floor at 201 Washington Street (One Boston Place)-to include selective removal of finishes, new architectural fin…
Electrical make safe and Temp High bay lighting installation on 19th and 20th floor for demolition.
Renovation of tenant space on 23rd floor with new lighting and power.
Renovation of tenant space on 23rd floor
Renovation of tenant space on the 38th floor with new lighting and power
Renovation of tenant space on 38th floor with new fire alarm A/V Devices and (1) smoke detector
Installation of new lighting and receptacles for (6) new offices on the 25th floor
Interior renovation on the 29th floor at 201 Washington Street (One Boston Place) to include new architectural finishes such as GWB soffit, metal door frame, and paint as required.
Install wiring within office cubicles on 28th floor for ZS Associates
Installation of new lighting and devices for mens and womens restroom renovation on 32nd floor.
Installation of (2) new fire alarm devices for 32nd floor mens and womens restroom renovation.
Installation of new lighting and power for 32nd floor elevator lobby renovation.
Installation of (2) new A/V devices for mens and womens restroom renovations on 23rd floor.
Installation of new lighting and devices for mens and womens restroom renovation on 23rd floor.
Demo & Build out of existing office space on the 38th floor to include new conference rooms, new kitchen, IT room, open area office space, all new lighting, HVAC upgrades, new & re…
Interior restroom renovation on the 32nd floor at 201 Washington Street (One Boston Place) to include selective removal of finishes, new architectural finishes such as GWB partitio…
Plumbing renovation work for CrossHarbor Capital
Installation of (8) new fire alarm devices for 32nd floor elevator lobby renovations.
Remodel of existing core bathroom on the 23rd floor,
Remodel of existing core bathroom on the 32nd floor,
Partial Demo of office space on the 20th floor to include removal of all finishes, flooring, ceiling, lighting & HVAC, turn up sprinkler heads for coverage per code, fire alarm wor…
Partial floor demo on the 20th floor to include removal of finishes, flooring, ceiling, lighting & HVAC, turn up sprinkler heads for coverage per code, fire alarm work. Eplans
Full floor demo of office space on the 19th floor to include removal of all finishes, flooring, ceilings, lighting &; HVAC, turn up sprinkler heads for coverage per code, fire alar…
Demolition of existing architectural finishes inside common corridor bathrooms, common corridor, and elevator lobby on 201 Washington St, 32nd floor Boston, MA 02108.
Interior renovation on the 23rd floor at 201 Washington Street (One Boston Place) to include new architectural finishes such as GWB partitions, flooring, paint, ACT, and millwork a…
Renovations to existing office space on the 25th floor to include new lighting, HVAC diffusers, relocate sprinkler heads as needed for 5 new offices built with demountable partitio…
Lighting upgrade in common corridors, conference rooms and offices.
Demolition of existing architectural finishes inside tenant space and common corridor bathrooms on 201 Washington St, 23rd floor Boston, MA 02108.
Demolition of 10 lf of drywall then adding 8 lf of drywall partition. Furnish & install 1 new door, frame & hardware, ceramic wall tile at kitchen, new ceiling tiles to replace old…
Tenant renovation on 28th Floor with New Lighting Fixtures and power.
Installation of Plumbing for a kitchen sink on the 28th floor,
Interior demo of existing vacant office space on the 32nd floor, removal of all existing drywall partitions, ceilings & finishes, turn up sprinkler heads for coverage per code. Epl…
Furnish and install new glass entry doors in existing office space on the 33rd floor, including patching of finishes as needed, minor electrical, sprinkler relocates, no fire alarm…