Building permit intelligence · Minneapolis, MN
208 5TH Ave SE has 9 municipal building permits on file in Marcy Holmes. The latest recorded activity was a plumbing permit dated Jul 28, 2026. Permits at this address represent $50K–$100K in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
METER MOVE Q2 - 2026 BATCH 16
CONSTRUCT 1-STORY 22'x22' DETACHED GARAGE WITH STORAGE TRUSSES/PULL-DOWN ATTIC ACCESS ON THICKENED PERIMETER SLAB AT REAR YARD (NO ALLEY) OF SFD. ONE-HOUR FIRE-RESISTANCE-RATED CON…
water heater
swapping out mini split. adding 2 heads
3 SMART JACKS. (JJL) ENGINEER: RYAN SEAVERT #41971 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQ…
2 mapped permits within 500 m, shown on the intelligence map above.
1 other address on 5TH Ave SE with municipal permit records in Minneapolis.
This address has 9 permit records in PropertyLabs' public history and is located in Marcy Holmes. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 31, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 208 5TH Ave SE is dated Jul 28, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 208 5TH Ave SE in the PropertyLabs platform, along with alerts when new permits are filed at this address.
ROOFING AND WINDOW REPLACEMENTS - We are replacing the decking on the uppermost roof, and putting up new asphalt shingles on all roofs including both porches. We are also replacing…
HPC/EXT-R - Repairing front porch Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/A…
RUN NEW GAS LINE TO STOVE AND INSTALL ANTI-TIP BRACKET