Building permit intelligence · St. Catharines, ON
221 Glendale Avenue has 241 municipal building permits on file. The latest recorded activity was a mercantile permit dated Jul 22, 2026. PropertyLabs also identified 7 mapped permits within 500 m of this address.
Alterations to existing mercantile Unit CRU 78B for "KIOKII AND..."
Alterations to existing mercantile Unit CRU 78B for "KIOKII AND..."
Alterations to existing mercantile Unit CRU 78B for "KIOKII AND..."
Interior alterations to the former Hudson's Bay space for future tenant; occupancy not permitted under this permit. Separate building permit required for alterations to sprinkler s…
Interior alterations to the former Hudson's Bay space for future tenant; occupancy not permitted under this permit. Separate building permit required for alterations to sprinkler s…
7 mapped permits within 500 m, shown on the intelligence map above.
3 other addresses on Glendale Ave with municipal permit records in St. Catharines.
This address has 241 permit records in PropertyLabs' public history. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 31, 2026.
PropertyLabs compiled this permit history from municipal public records for St. Catharines, ON. The latest recorded permit activity at 221 Glendale Avenue is dated Jul 22, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 221 Glendale Avenue in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Interior alterations to the former Hudson's Bay space for future tenant; occupancy not permitted under this permit. Separate building permit required for alterations to sprinkler s…
Interior alterations to the former Hudson's Bay space for future tenant; occupancy not permitted under this permit. Separate building permit required for alterations to sprinkler s…
Interior alterations to the former Hudson's Bay space for future tenant; occupancy not permitted under this permit. Separate building permit required for alterations to sprinkler s…
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
Interior renovations to "Soft Moc Shoes" (Unit 26)
Interior renovations to "Soft Moc Shoes" (Unit 26)
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
Interior renovations to "Soft Moc Shoes" (Unit 26)
Interior renovations to "Soft Moc Shoes" (Unit 26)
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
Interior renovations to "Soft Moc Shoes" (Unit 26)
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
Interior renovations to "Soft Moc Shoes" (Unit 26)
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
Interior renovations to "Soft Moc Shoes" (Unit 26)
To install two (2) signs on South Elevation: nonilluminated 10.63m² "PHARMACY" and illuminated 27.95m² "ZEHRS and logo". To install three (3) signs on East Elevation: nonilluminate…
Interior renovations to "Soft Moc Shoes" (Unit 26)
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To construct a 111.48 m² garden centre in parking lot from April 2, 2026 to July 10, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
To erect a temporary tent structure within the fence compound of the seasonal garden centre from April 15 to July 15, 2026.
Interior renovation to an existing Zehrs Market APRIL 1, 2026 - REVISION #1 FOR RACKING
Interior renovation to an existing Zehrs Market APRIL 1, 2026 - REVISION #1 FOR RACKING
Interior renovation to an existing Zehrs Market APRIL 1, 2026 - REVISION #1 FOR RACKING
Interior renovation to an existing Zehrs Market APRIL 1, 2026 - REVISION #1 FOR RACKING
Interior renovation to an existing Zehrs Market APRIL 1, 2026 - REVISION #1 FOR RACKING
Interior Alterations for a take-out only restaurant for "ChungChun Rice Dog", Unit 105
Alterations to the existing NFPA 13 sprinkler system for "Bingemans Kingpin" bowling.
Alterations to unit 76A of the existing commercial building for take-out restaurant "CRAIG'S COOKIES". Take-out only; no seating permitted.
To install illuminated wall signs: 5.46m² on East elevation and 10.6m² on South elevation, "KINGPIN".
To install a 10.36m² illuminated canopy sign for URBAN PLANET.
Alterations to the sprinkler system in Unit 87 Purdy's Chocolatier to accommodate the new tenant layout.
To install an 11.55m² illuminated sign at the front entrance, "ST CATHARINES PUBLIC LIBRARY".
Alterations to the existing sprinkler system for the tenant space "CONTINENTAL CURRENCY EXCHANGE".
Interior Alterations for Unit 34 "STARS MENS SHOPS".
Alterations to the existing sprinkler system within unit 716 for LIbrary tenant.
Interior renovation for client fit-out - Unit 87 "PURDY'S CHOCOLATIER".
Alterations to Unit 716 of the existing building for "ST CATHARINES PUBLIC LIBARY - PEN CENTRE LOCATION"; separate building permit required for exterior signage.
Alterations to the existing commercial unit CRU FC-3 at food court for "BOURBON ST. GRILL".
To install 2 new illuminated Fascia Signs on the North Elevation: 3.76m² 'Dollarama" and 0.84m² "$1plus".
To install an illuminated, 7.93m² sign on the East elevation " d spot DESSERT CAFE". Total sign area including window graphics is 10.16m².
Interior fit up for a new retail tenant, Lovisa Jewelry, Unit CRU90
Alterations to combine Units 148 and 149 for "CONTINENTAL CURRENCY EXCHANGE".
Erect Temporary Tent Structure from April 15, 2025, to July 15, 2025
Dollarama Interior Renovation
Interior alteration to Unit 201 for an entertainment centre "Bingemans Kingpin".
INTERIOR BASE BUILDING RENOVATION OF 2 CRU'S FOR FUTURE TENANTs.
Landlord alterations to Unit 617L at the Penn Centre for future tenant, ST CATHARINES PUBLIC LIBRARY. Separate building permit required for tenant fit-out. Separate building permit…
Alteration to fire suppression system and relocation of remote pull station in Unit FC-2 for 'Jimmy the Greek'
Alterations to Unit 602L for D-SPOT.
Base building alterations to create new future tenant space(616 L) lower level
Extensive alterations to Unit 602L - separate tenant improvement permit required.
Alterations to Unit 37 for tenant fit-out for JUMP+ at Penn Centre Mall.
Replace qty 5- rooftop units for H and M
To replace the rooftop HVAC for Unit 38 (West 49). No drawings submitted; all work is subject to field inspection and approved.
Alterations to the existing office space for HVAC and electrical upgrades for "Government of Ontario Passport Office".
Alteration to the existing NFPA 13 sprinkler system for "BATH AND BODY WORKS" at Pen Centre.
To replace the existing roof top unit. No drawings submitted; all work is subject to field inspection and approval.
Install Temporary Tent from April 15, 2024, to July 15, 2024.
Alterations to the existing space to replace the Fire Alarm Control Panel and a limited number of devices.
Install One Wall Sign for "Chatime"
Alterations to the existing NFPA 13 sprinkler system to accommodate renovation for a restaurant 'Chatime' (Unit 107).
Construct Interior Tennant Fit out for Bath & Body Works (Unit 0100A/0102)
Tenant Fit-out for 'Chatime' (Unit 107). Separate building permit required for sprinkler alterations.
Tenant Fit Out for 'The Shoe Company' (Unit 36).
Interior Alterations to Ground Floor to Units 62, 62A, 55B
Interior Alterations to 'New York Fries'
Install Business Wall Sign for 'Ardene'
Alterations to the existing Zehr's store to add a kiosk for 'Starbucks'
Install Business Wall Sign for 'Industria Pizzeria + Bar'
Tenant Fit-Out for 'Elegant Goldsmith'
Install Tent/ Garden Centre from April 15 to July 15, 2023
Install Two Wall signs for "CAA"
Tenant Fit-Out for 'Telze' (Unit 142A)
Install New Hand Sink (Patch/Paint)
Alterations to Plumbing for 'Zehrs' (Unit 8)
Permit revised April 4, 2023 to update sprinkler layout. Tenant Fit-Out For 'Specsavers' Unit 75
Tenant Fit-Out for "CAA" (Unit 605L)
PERMIT REVISED: to alter layout of gates issued June 6, 2023. Install Security Gates for "Zehrs" (Unit 8)
Tenant Fit-Out for 'Ardene' (Unit 119)
Tenant Fit-Out for Carters/Osh Kosh Unit 103
Interior Alterations for 'A&W' (Unit 1009) ** ROLLED DRAWINGS **
Installation of Sprinklers for 'Homesense' Unit 1008
Tenant Fit-Out for 'Lululemon' (Unit 79)
Tenant Fit-Out for 'Real Fruit' in Unit 98A
Alter Exterior Facade Construct Vertical Shaft at Second Floor Level and Construct a Main Floor Demising Wall (Landlord Improvements)
Install Three Signs for "Homesense"
Removal of Interior Finishes in Unit 79 **ROLLED DRAWINGS **
Alter Interior 1st Floor and Basement for 'H&M'
Interior Alteration to 'Manchu Wok' (Unit FC8)
Install Temporary Tent (From April 15, 2022 - July 15, 2022
Install Two Wall Signs for "Fit 4 Less"
Interior Alterations to 'Home Sense'
Install 1 Wall Sign for "CIBC"
Expand Existing Tenant Space and Alter Facade at 'Home Sense' (Landlord Improvements) ** ROLLED DRAWINGS **
Tenant Fit- Out to Ground Floor and Basement Floor for 'Industria Pizzeria +Bar' **Rolled Drawings**
Construct Kiosk for Chatr
Install Four Wall Sign for "Structube"
Interior Interior for 'Structube' (formerly Pier 1)
New Grease Interceptor and connection to existing sanitary manhole to be installed in expanded building apron to service renovated commercial retail unit.
To Install One Wall Sign for "Mark's"
Alter Existing 'Telus Mobility' Kiosk at Pen Centre
Replace Escalators (both Sides) for Entrance 6 at 'Pen Centre'
To Erect Temporary Tent and Garden Centre for 'Zehrs' from April 15/21 to July 15/21
Upgrade Facade and Strengthen Existing Columns and Beams at Catwalk Between Entrance 6 & 7 at the 'Pen Centre'
Modify Existing Sprinkler System for 'Marks Work Wear House'
Install a new Kitchen Exhaust and Fire Suppression System for 'ZenQ' - Unit 100A
Construct new Temporary Stairs for Pen Centre - Entrance 6
Modify Existing Sprinkler System for 'Fit 4 Less'
Install a kiosk for 'Virgin Mobile' in Public Corridor
Alter Interior for 'Mark's
To Erect Temporary Tent and Garden Centre from April 15/20 to July 15/20
Alter Existing Sprinkler System for 'Trillium College'
Install Two (2) Wall Signs for "Sportchek"
Alter Existing Sprinkler System at 'Sport Chek'
Alter Interior of (10) Theatres to Accommodate new Seating for 'Landmark Cinemas'
Install One (1) Wall Sign for "Pen Centre"
Alter Interior for 'Fit 4 Less' PERMIT DEFERRED UNTIL March 25, 2022
Tenant Fit Out For 'Trillium College' (Unit #CRU 650L)
Install Sprinkler System to Former Sears (All Levels) - Landlord Improvements
Alter Interior For 'Beauty 21'
Alter Interior of Unit 54A for 'Sportcheck'
Alterations to Accommodate New Cooler Cases
Alter Interior of Existing 'Tim Horton's' - Unit 143
Install a Kitchen Exhaust Hood and Fire Suppression System for 'Karma Kameleon'
Install Two (2) Wall Signs for "Urban Barn" (Unit #1004)
Alter interior and alter exterior exit door for 'Urban Barn' - Unit 1004
Construct New Kiosk for 'Freedom Mobile'
Replacement of Existing HVAC Unit With New.
Remove One - 10 Ton Unit of Similar Size, Dimension, Height and Replace with New Unit Only no Curb. Unit Sits on Sleeper
Alter Interior of former Sears (All Levels) - Landlord Improvements
Alter Interior for 'La Vie En Rose' - CRU #76
Construct a Wood Deck in Corridor of Pen Centre for 'Lock Street Biergarten'
To Erect Temporary Tent Structure & Garden Centre for Zehrs from April 15 - July 15/19
Install One (1) Awning Sign for "Walmart Medical Clinic"
Install Ten (10) Wall Signs for "Walmart / Subway"
Alter Interior of Walmart for 'Subway'
Modify Existing Sprinkler System at 'Walmart'.
Replace Entrance and Vestibule Door Systems at 'Pen Centre Entrance No. 5'
Alter Interior of Existing 'KFC/Taco Bell Restaurant' - Unit FC5
Remove one (1) ton unit of similar size, dimensions, height and replace with new unit and curb adapter.
Plumbing Only to Accommodate New Berry Cases in Zehrs
Alter Interior of Unit FC-3 for 'Mucho Burrito' -
Install Backflow Preventors
To Renovate Unit 100A for 'Zen Q'
To Renovate 'Wireless Wave' Store at Pen Centre
Renovate 'CRU 14' at Pen Centre for 'T-Shirt Time'
Construct Additions and Alter Interior at 'WalMart'
Alter Interior of former 'Sears' Tenant Space to Prepare for Future Tenant(s)
To Erect Temporary Tent Structure & Garden Centre for Zehrs from April 15 - July 15/18
Rerouting of Sanitary Line
Replace Building Drain and reroute sewer line
Relocate water service, sanitary sewer and storm sewer to accommodate Walmart addition We have an additional 247 meters of pipe which would equal $486.10. Review revised drawing is…
Renovate Existing CRU 70 & 98 to Accommodate 'Kavar Jewellers'
Construct Phase 1 - Temporary East Entrance for 'Pen Centre'
Alter Interior Tenant Space for 'Eclipse'
Alter Interior of 'Kelseys Restaurant'
Alter Interior of CRU 84 for 'Things Engraved'
Construct new Demising Wall to Create Two Separate Tenant Spaces - CRU 34 and CRU 35A
Alter Interior of Unit CRU 35A for 'Mac Cosmetics'
Alter Interior of CRU 118 for 'Maverick Studio for Men'
Interior Renovations 'Wireless Plus' CRU 125
Remove and Replace 2 Rooftop Units
Alter Interior of CRU - 123 for 'Showcase'
Repair Tunnel Entrance Roof Slab at 'Pen Centre'
Alter Interior of CRU #91 for 'Bell'
Alter Interior of CRU 142A for 'Rolly Polly Cow'
Alter Interior of Unit CRU -100 for 'American Eagle Outfitters / Aerie'
Add new Interior partition walls - Unit 111
Alter Interior of Unit 88 for 'Rogers'
Erect Temp Tent Structure within the Fence Compound of the Seasonal Garden Centre from April 15 - July 15
Alter Interior of Unit 114 for 'Laura Secord'
Install three new signs for Starbucks
Alter Interior of Unit 106B for 'Mobile Klinik'
To Alter Interior of CRU 67 for Bentley Leathers Inc.
Demolish Interior Partitions, Construct a new Demising Wall and Install new Roof Top Units at 'Pen Centre - CRU100 and CRU 101'
Alter Interior of Unit 114A for Michael Hill
To Alter Interior to Create 2 Tenant Spaces 114 & 114A and Install New Rooftop Units
Alter Interior of Unit 106B for 'Starbucks'
To Replace Existing Fire Alarm Panel and Annunciator Panel at 'Hudson's Bay'
Alter Interior of CRU 106B and 106C for Landlord Improvements Construct a new Outdoor Patio (CRU 106B)
Replacing Heat and A/C Units
Interior Alteration to Retail Space for Soft Moc
Alter Interior of Unit 1006 for 'Phoenix Optical'
Alter Interior of Unit 86 for 'Y's Boutique'
Alter interior of Unit 112 for 'Fido'
UNIT FC6 - Update Counter and Signage for Charleys Steakery (Pen Centre)
Alter Interior for 'Transat Travel'
To Erect a Temporary Tent Structure and Garden Centre for Zehrs from April 15, 2016 to July 15, 2016.
Alter Interior of Unit #28 for 'QE Home'
Alter Interior of CRU 115A for 'Pandora'
Alter Interior of Concession / Lobby Area at 'Landmark Theatres'
REPLACE EXISTING VIRGIN MOBILE KIOSK WITH NEW KIOSK (Virgin Mobile Pen Centre)
CONSTRUCT A DEMISING WALL FOR UNIT - CRU 118 (Pen Centre)
Install Two New Wall Signs for 'Hudsons Bay' on East Exterior Wall of Unit
Install Two Wall Signs for "Hudson's Bay" on South Exterior Wall of Unit
Erect Temporary Garden Centre For 'Zehr's Markets' From April 15 to July 15, 2015
INTERIOR ALTERATIONS TO UNIT #39 - ( 'Telus' Pen Centre)
INTERIOR ALTERATIONS TO CRU 85 - 'Hearing Solutions'
ALTER INTERIOR TO CREATE 2 UNITS, UNITS # 85 AND # 85A (Landlord Improvements)
INTERIOR ALTERATIONS TO UNIT FC10 - 'Freshly Squeezed'
INTERIOR ALTERATIONS OF EXISTING W/ADDITIONAL EXPANSION INTO EXISTING SPACE FOR 'Shoppers Drug Mart' - Pen Centre
INTERIOR ALTERATIONS FOR 'Bentley Leather' - Unit 55 ( Pen Centre )
INTERIOR ALTERATIONS FOR 'Sephora' - Pen Centre
INTERIOR ALTERATIONS TO EXISTING UNIT - 'The Body Shop' (Pen Centre)
INTERIOR ALTERATIONS TO 'Coco Shoes' (Unit 88A) - PEN CENTRE
Alter Interior of CRU 46 for 'Zumiez'
Demolish Demising Wall and Washrooms at CRU77 & CRU78
INTERIOR ALTERATIONS TO UNIT 110 - 'Glentel TBooth Wireless'
INTERIOR ALTERATIONS FOR UNIT FC-2 FOR 'Jimmy The Greek' (Pen Centre Food Court)
INTERIOR ALTERATIONS - CONSTRUCT NEW MOBILE KIOSK IN PEN CENTRE MALL (CRU Unit #715K)
Construct Temporary Garden Centre for 'Zehrs Markets' from April 15 to July 15, 2014
Alter Interior of Unit 81 - Existing 'Footlocker'
Alter Interior of Unit 105 for 'Monsieur Crepe Superieure'
INTERIOR ALTERATIONS FOR - 'Trade Secrets' ( PEN CENTRE )
Alter Interior of Unit 92 for 'Claires'
Install Two (2) Wall Signs 'Boston Pizza' (48inch Diam.) and 'Boston Pizza' (40 Sq. Ft.)
Plumbing Only · Jun 22, 2026