Building permit intelligence · Boston, MA
229-233 Kelton St has 11 municipal building permits on file in Ward 21. The latest recorded activity was a gas permit permit dated Jan 23, 2024. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
Install gas conversion Burner
Re-Location of 14 Gas meters to the exterior of the building per the gas Company Recommendation's. Install one gas fired water Heater.
Install One Backflow and provided connections for one Hot Water Heater
Repoint front, rear, right and left facades.
Disconnect free standing gas range. Move over 9". Install the same free standing gas range.
4 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Kelton St with municipal permit records in Boston.
This address has 11 permit records in PropertyLabs' public history and is located in Ward 21. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 229-233 Kelton St is dated Jan 23, 2024. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 229-233 Kelton St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Disconnect sink and dishwasher to facilitate for the installation of new kitchen cabinets. Install new sink and faucet and install existing dishwasher.
Kitchen renovation - cabinet and countertop replacement, new dishwasher, sink, fridge. NOT replacing: floors, stove.
Replace Dishwasher in the Kitchen of Apt 11 - 3rd Floor
-added two recessed lights -added two receptacles
remove kitchen and install new cabinets counter and appliances with hardwood floor Cut look through in non load bearing wall . finish plaster/paint
GAS TEST