Building permit intelligence · Boston, MA
23 Arcadia St has 17 municipal building permits on file in Ward 15. The latest recorded activity was a electrical permit permit dated Oct 22, 2024. Permits at this address represent $50K–$100K in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
Upgrade Service to 400AMP
Change Occupancy
Change Occupancy
Electrical
Gas
Plumbing
4 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Arcadia St with municipal permit records in Boston.
This address has 17 permit records in PropertyLabs' public history and is located in Ward 15. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 23 Arcadia St is dated Oct 22, 2024. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 23 Arcadia St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Change Occupancy
Two (2) Family Dwelling Certificate of Occupancy for the two family dwelling SF413510, issued: 10/2/14
im fix the existen 200 amps service plus proviede for 1 ,2 second plus owner panel each tha 100 amps, and pass final inspeccion the fist floor unit and check tha second floor unit.…
to upgrade a service from one hundred to 200 amps
Replace four inches cast iron stack in Pvc.Remove and replace plumbing fixtures and add a half bathroom in the first floor.
Remove and replace two stoves, two gas hot water heaters and test the gas line.
to add another layer of drywall for the first and second ;floor at 23 arcadia and replace windows and doors. Paint interior and exterior
To be present when the electrical utility company restores power to the house and check home for safe electrical working order after power is restored.
Boarding up garage doors per Inspector's instructions on Violation # V167907
Disconnecting all circuit breakers accept for one that will supply power to a plug that we will installed for a burglar alarm system. This building is vacant.