Building permit intelligence · Minneapolis, MN
2313 13TH Ave S has 9 municipal building permits on file in Ventura Village. The latest recorded activity was a mechanical permit dated Apr 23, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Walk-In cooler and freezers shall meet the section 6.4.5 MEC 2024. Installing customer supplied refrigeration system for walk-in cooler.
TempHeat
Building Temporary heater connection (2) LB 350 (2) 350,000 BTU heaters
Complete HVAC systems for 2 story building. To include commercial kitchen work, gas work for environmental burners, all distribution systems. BLDG1110555
NEW BUILDING PLUMBING - FIXTURES AND PIPING PER PLAN All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe…
3 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on 13TH Ave S with municipal permit records in Minneapolis.
This address has 9 permit records in PropertyLabs' public history and is located in Ventura Village. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 2313 13TH Ave S is dated Apr 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 2313 13TH Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
NEW CONSTRUCTION OF 2 STORY ART AND WELLNESS CENTER (JJL) CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDUL…
HVAC system, installing seven gas heat rooftop units, three mini split units, kitchen makeup air unit, exhaust fans, GRDs and all associated ductwork. Refer to attached drawings.
new wellness center
Install and start up walk-in cooler refrigeration system.