Building permit intelligence · Boston, MA
25 Follen St has 16 municipal building permits on file in Ward 4. The latest recorded activity was a electrical permit permit dated Jul 29, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 20 mapped permits within 500 m of this address.
Kitchen remodel, And new circuit for Washer and Dryer
Renovations - Interior NSC
Electrical
Plumbing
Renovations - Interior NSC
Install a new roof deck according to plans submitted
20 mapped permits within 500 m, shown on the intelligence map above.
6 other addresses on Follen St with municipal permit records in Boston.
This address has 16 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 25 Follen St is dated Jul 29, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 25 Follen St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Remove&dispose of deck.Strip off rubber and insulation and install Firestone .060 fully glued rubber roofing system with 5 inch polyiso insulation.+
Expose the existing stone foundation, cut and point deteriorated mortar joints at the foundation, waterproof foundation wall.; Work is all below grade.
New Security System
relocate kitchen,add outlets,switches,relocate range,6 recessed,bath fan light,replace panel,2 heat circuits
bathroom kitchen remodel
Renovate a 356 sqft condo by installing new bathroom, new kitchen ,replastering ceilings, new recessed lighting,new electric heat, new flooring and painting. Work in ;unit #3R.
remodel kitchen bathroom livingroom
renovation of master bath on 1st floor, installation of new 1/2 bath in basement, installation of new laundry room in basement, renovation of kitchen in basement
close down existing doorway into 1st floor "bedroom" to convert to walk-in closet from 1st floor master; Renovate existing first floor master bathroom Eliminate non-load bearing lo…
Demolition of existing 1st floor bathroom (in anticipation of same location renovation of the bathroom). Demolition of lower level kitchen (in anticipation of new cabinetry, etc.)…
Electrical Permit · ELECTRICAL · Jul 28, 2026