Building permit intelligence · Boston, MA
25 Milford St has 23 municipal building permits on file in Ward 3. The latest recorded activity was a lvolt permit dated Nov 26, 2025. Permits at this address represent $500K–$1MM in total declared construction value. PropertyLabs also identified 17 mapped permits within 500 m of this address.
Low Voltage
Electrical
Gas
Plumbing
Renovations - Interior NSC
Plumbing
17 mapped permits within 500 m, shown on the intelligence map above.
9 other addresses on Milford St with municipal permit records in Boston.
This address has 23 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 25 Milford St is dated Nov 26, 2025. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 25 Milford St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Gas
Other
Interior/Exterior Work
install 2 windows
Wire Kitchen, replace light fixtures, devices and switches throughout unit, replace sub panel.
Renovate kitchen &; 2 bathrooms. Install 2 replacement windows on Milford St. Install 3 replacement windows and 1 door on alley side. Update plumbing &; electrical to code througho…
Re-pointing the Front and Rear Facade Repair Window Perimeters and Dormers
Three(3) Family Dwelling Certificate for Unit #3 - ONLY ALT219575 issued 5/6/15,;ALT219573 issued 5/6/15,;SF207535 ;issued12/21/12,;SF234576 issued 4/23/13 &;;SF271495 issued 8/6/1…
Add Roof Deck to existing roof. as per plans by architect Fenollosa. (SEE ALT219573)
convert an existing inverted exterior reardeck into living space, and add a new rear deck. as per plans, to proceed to ZBA Hearing process;;(SEE ALT219575)
Running gas line for fireplace and grill
Work up to rough inspection with rear staging At risk permit - some of the cost is reflected on alt219573 and alt219575 - upgraded cost on this permit.
install new joists to rotten floor as designed by engineer
Remodel of first and second floor condo unit with rooftop deck
kitchen and bath remodel on top floor
Renovation of kitchen including new cabinets and countertops,Installation of new applainces.Renovation of one bathroom with fixtures remaining in same location. Installing a new ba…
8 replacement windows His. #11.723
Electrical Low Voltage · LVOLT · Jul 29, 2026