Building permit intelligence · Boston, MA
25 Warren St has 41 municipal building permits on file in Ward 21. The latest recorded activity was a cob permit dated Jul 17, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
City of Boston
Brighton high school- Electrical Maintenance for City of Boston- Permit fee Waiver
City of Boston
City of Boston
Electrical
Plumbing
1 mapped permit within 2 km, shown on the intelligence map above.
8 other addresses on Warren St with municipal permit records in Boston.
This address has 41 permit records in PropertyLabs' public history and is located in Ward 21. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 25 Warren St is dated Jul 17, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 25 Warren St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
City of Boston
City of Boston
City of Boston
Electrical
City of Boston
City of Boston
Low Voltage
City of Boston
Plumbing
Electrical
City of Boston
Provide 2 Temporary Tents Each 20’x40’ (capacity 19each) No sidewalls. For Covid19 compliance per CDC guidelines. Erect April 19, 2021 and remove after June 20, 2021
My Way Cafe Kitchen Renovation
Kitchen area new plumbing piping configuration for existing equipment.
Kitchen area new plumbing piping configuration for existing equipment.
City of Boston PFD #7214-D - Renovation of school kitchen area including finishes and equipment
Install New Street Light/Cell Node
new handicapped kicthen sink and washer dryer
ELECTRICAL MAINTENENCE AT BRIGHTON HIGH SCHOOL
Replacement of exit signs with new wiring.
Replacement of exterior doors and hardware. Installation of new security system and card access system.
INSTALL CARD ACCESS EQUIPMENT IN BRIGHTON HIGH SCHOOL
Annual maintenance permit.
Installation of new structural steel beams. Installation of new HVAC rooftopo unit. Demolition of existing fire alarm and installation of new. City of Boston, BPS Planning &; Engin…
Brighton High School. Installation of new wireless clock system thru out school, power and data wiring at Planning Center Room, and lighting in basement corridor.
New wiring at Brighton High School gymnasium. Wiring will consist of a new HVAC unit on roof of gym, new scoreboards, shot clocks, exits signs, lighting, new 100 amp sub panel, and…
Installation of fire alarm devices at the Brighton High School Gymnasium.
New two inch gas piping for a rooftop heating unit.
Demolition of non-load bearing walls, installation of new non-load bearing walls, flooring, painting, miscellaneous rough and finish carpentry, HVAC ductwork, Electrical light fixt…
mis interior renovations includes electrical and plumbing
Upgrades to the science area City of Boston - fees waived
Renovation of the science area City of Boston - fees waived
Annual Maintenance
strip and reroof and flashing on existing brighton high school roof - fees waived by letter.