Building permit intelligence · Boston, MA
250 Atlantic Av has 181 municipal building permits on file in Ward 3. The latest recorded activity was a other permit dated Jun 29, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Other
Other
Other
Low Voltage
Low Voltage
Low Voltage
1 mapped permit within 500 m, shown on the intelligence map above.
11 other addresses on Atlantic Av with municipal permit records in Boston.
This address has 181 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 250 Atlantic Av is dated Jun 29, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 250 Atlantic Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Other
Other
Other
Other
Electrical
Electrical
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Special Events
Special Events
Special Events
Special Events
Interior/Exterior Work
Other
Other
Scope is to replace, program and test 2 fire alarm panels at the New England Aquarium in Boston, MA. Head end of system in main lobby and transponder located in IMAX Theater will b…
Other
Other
Fire Alarm
Fire Alarm
Fast Track Application
Fast Track Application
Misc renovations to the existing cafe on the second floor of the New England Aquarium. 13 new lights, 8 data jacks, extend and relocate 10-12 existing to remain branch circuits
installation of 20 amp receptacles and lighting fixtures for the Aquarium retail shop
Low Voltage
Low Voltage
Other
Other
Renovations - Interior NSC
Renovations - Interior NSC
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Other
Other
Other
Other
Interior/Exterior Work
Interior/Exterior Work
Fire Alarm
Fire Alarm
Other
Other
Changing out 2x2 light fixtures in drop ceiling
Partial demolition of 2nd floor elevator hallway - Floor and ACT New Floor and ACT to be installed. Install a 2'x2' access panel on 3rd floor.
Renovation of walk in freezer into break space on 4th floor of New England Aquarium
Add new fire alarm devices on existing circuit
Installing new lights and new circuits
Remove and replace 510 square feet of 6" thick concrete floor in Tropical Gallery.
The NEAQ Exterior wall Project includes minor concrete to the existing North &; West Façade. Upon completion of the minor repairs the concrete surface will be coated with a cementi…
Erect 60x75 and 20x20 tents on 4/4/23, removal on 10/4/23.
Erect 25x95 tent on 9/28/22, removal on 10/4/22.
Erect 25x95 tent on 6/29/22, removal on 7/1/22.
Erect 40x60 tent on 5/25/22, removal on 10/25/22.
The NEAQ Capital Project includes; 1. Roof replacement of west wing 2. HVAC equipment replacement 3. Exterior wall repairs
NE Aquarium RTU Replacement,1 Central Wharf. Misc. Low Voltage HVAC Control Wiring - PG - 220518
Cutting back of 9 sprinkler heads to relocating as upright heads below roof deck.
Erect 60x75 and 20x20 tents on 4/1/22, removal on 11/4/22.
Plumbing connections at the New England Aquarium
Job #15968 NEAQ Roof Replacement project
Job #15968 NEAQ Roof Replacement project
Remove existing glued on acoustical ceiling tile from 4 areas (6' X 14') and save for reuse. Install 1 5/8" metal stud framing attached to concrete structure. Install 1/2" drywall…
Erect 40x60 tent on 6/1/21, removal on 11/30/21.
Erect 60x75 and 20x20 tents on 3/18/21, removal on 11/13/21.
Erect 60x75 and 20x20 tents on 3/27/20. Removal on 11/06/20.
Erect 40x60 and 9x70 tents on 2/12/20. Removal on 2/25/20.
New England Aquarium - Simons Theater -; Construct a new theater platform, including selective demolition, framing and drywall, fire protection, HVAC, carpeting, painting, finish w…
Erect 40x60 and 9x70 tents on 12/18/19. Removal on 1/7/19.
Installation of BA security devices at Peoples United Bank ATM (New England Aquarium) 1 Central Wharf Boston MA 02110 (8-57475-03)
Erect 11 10x10 Tents 8-15 Thru 8-19 for Boston Green Festival. No sidewalls
Erect 20x40 tent on 6/9/19. Removal on 6/10/19.
Erect nonstructural wood trellis around ;outdoor patio space outside aquarium on plaza.
installation of recessed lights and receptacles
Erect 40x60 and 12x18 tents on 4/4/19. Removal on 11/15/19.
Erect 60x75 and 20x20 tents on 3/25/19. Removal on 11/1/19.
Erect 40x60 and 9x70 tents on 2/13/19. Removal on 2/26/19.
NE Aquarium Chiller Project, Misc low voltage HVAC control wiring - PAG, 186661
Erect 40x60 and 9x70 tents on 12/19/18. Removal on 1/3/18.
Erect 8' display with metal framing, slat wall, fire rated plywood, drywall, new door and frame, and paint.
Repair 2nd floor concrete slab
Erect 20x40 tent on 610/18. Removal on 6/11/18.
Powe rfor temporary installation for temporary tent/restaurant/bar for summer
Installation of BA security devices at Peoples United Bank ATM at New England Aquarium 1 Central Wharf Boston MA 02110 (8-57475-02)
Erect 40x60, 12x18 and 9x70 tents on 4/2/18. Removal on 11/1/18.
Erect 60x75 and 20x20 tents on 3/26/18. Removal on 11/2/18.
Erect 40x60 and 9x70 tents on 2/15/18. Removal on 2/27/18.
Erect 40x60 and 9x70 tents on 12/21/17, removal on 1/4/18.
Temporary generator power and electrical distribution for event at the New England Aquarium on October 13th of 2017.
Erect 25x60 tent on 10/13/17. Removal on 10/14/17.
Erect 20x40 tent on 6/4/17. Removal on 6/5/17.
Erect 40x60 an d12x18 tents on 4/27/17. Removal on 10/27/17.
temporary wiring of outside tent
Erect 60x75 and 20x20 tent on 3/27/17. Removal on 11/1/17.
Erect 40x60 tent on 4/12/17. Removal on 4/27/17.
Remodel existing exhibit including installation of new architectural panels, drywall, framing, tank surrounds, painting and carpet tiles.
renovation in west wing of building
Erect 40x60 and 9x70 tents on 2/15/17. Removal on 2/28/16.
Erect 40x60 and 9x70 tent on 12/20/16. Removal on 1/3/17.
Erect 12x15 tent on 6/23/16. Removal on 9/6/16.
Erect 20x40 tent on 6/5/16. Removal on 6/6/16.
temporary wire of outside tent
Annual Maintenance for The New England Aquarium
Erect 60x75 and 20x20 tents on 4/5/16. Removal on 11/15/16
Erect 12x18 tent on 4/26/16. Removal on 10/31/16.
Erect 40x60 tent on 3/31/16. Removal on 10/31/16
Erect 9x70 tent on 4/14/16. Removal on 10/31/16.
Erect 40x60 tent on 2/11/16, removal on 2/23/16.
Erect 40x60 and 9x70 tents on 12/23/15. Removal on 1/6/16.
Replace security alarm control panel
adding surveillance cameras to system
Install (3) 6' door sets on 10/7/15. Removal on 11/1/15.
Erect 25x90, 9x60 and 10x30 tents on 10/27/15. Removal on 10/29/15.
Erect 50x130, 14x24 and 6x20 tents on 10/27/15. Removal on 10/29/15.
Erect 25x90 and 9x60 tents on 9/24/15. Removal on 9/26/15.
Erect 25x90, 10x30 and 9x60 tents on 7/10/15. Removal on 7/11/15.
Erect 12x15 tent on 6/15/15. Removal on 9/10/15.
Temporary electrical distribution for the Greenway Gala at the Wharf Park Fountain from June 7th through 9th of 2015.
Temp tent site for reef bar
Annual Maintenance
erect 40x60 tent on 5/8/15. Removal on 11/1/15
Erect 20x40 tent on 6/7/15. Removal on 6/7/15.
Erect 40x60 and 9x25 tents on 4/16/15. Removal on 4/28/15.
Erect 60x75 and 12x18 tents on 4/1/15. Removal on 11/15/15.
elec work for ticket booth
Temporary electrical distribution for the Greenway Gala at the Wharf Park Fountain from May 11th through May 13th of 2014.
Remove existing cabinets and counters, and install new to match. Install new VCT flooring. work performed at ticket booth / 1st fl
JCC JOB #873029: NEAQ-BFP 250 ATLANTIC AVE: REMOVE AND REPLACE 2 BACKFLOW PREVENTERS IN THE BASEMENT
install 7 backflow preventers
Wire two 15-hp Eaton variable frequency drives on existing protien pump motors #1&;#2.
temporary installation for temporary tent/restaurant/bar for summer 2013 june thru august.
Temporary power for annual Greenway Gala at the Wharf Park Fountain on May 13th and 14th of 2013.
Install low voltage video equipment
install a back flow preventer for a soap despenser
running 7 temporary 110 volt circuits running 2 temporary 220 volt circuits single phase
Low Voltage HVAC Control Wiring ~ New England Aquarium GOT Job #12-9992 (PAG) ~ 1 Central Wharf, Boston, MA
Renovating the Plumbing in NEAQ.
Install of low voltage lighting control system
Additions to existing fire alarm system and new devices throughout facility.
New exhibit lighting throughout, renovations and additions to life safety systems, expansion of fire alarm system and devices.
Plans are in LPR 7-6-2012 Repairs and renovations of giant ocean tank. Installation of smoke evacuation system, lighting upgrades and wall finishes.; Establish new occupanct load a…
low voltage A/V wiring
RELOCATE (1) EXISTING HORN STROBE DEVICE. INSTALL (1) NEW HORN STROBE DEVICE.
RENOVATION OF EXISTING LAB AND EXHIBIT SPACE.
install new 185 kw generator for n e aquarium
annual maintenance for N E Aquarium
Expanding current wet fire protection system. Work includes new stairway riser, branch lines to be extended to all 5 floors and basement. Fire alarm upgrades include the addition o…
Replace (1) 150A panelboard in new location and relocate branch circuits as needed. Furnish & install (3) light fixtures in divers room.
4th fl ramp addition to include demolition and furnish & install (4) light fixtures,(3) exit signs and (2) power connections to display.
Install shower valves on 4th floor
Demo and renovation of existing lab space to be converted to new aquarium exhibit space. Work includes MEP upgrades and installation of fire protection.
5TH FL LAB RENOVATION. ADD 2 AV's
4TH FL LAB RENOVATION. ADD 5 AV's, 1 SMOKE DET, 3 DUCT SMOKE DET, 1 TAMPER/FLOW SWITCH.
5TH FL LAB RENOVATION
4TH FL LAB RENOVATION
New England Aquarium The proposed work inolves reconfiguration and relocation of existing work space. Minor wall and ceiling repairs. New wall, ceiling and flooring finishes. New l…
Low Voltage HVAC Control Wiring ~ NE Aquarium Fls 4&5 Job #12-9396 ~ (PAG)
Installing plumbing fixtures with the associated piping, along with relocating exisiting fixtures on the 4th and 5th floors at the New England Aquarium.
New England Aquarium 4th Floor Ramp Project Project consists of install a new structural steel and concrete deck ramp from the 4th floor to the top of the Giant Ocean Tank. Also in…
Renovation at the NEW ENGLAND AQUARIUM. Renovation of an existing work space. Included will be new walls, doors and ceiling. New lighting and HVAC work in ceiling. New plumbing fix…
Inspect MAIN 480 Volt Circuit Breaker. Clean lugs. NSTAR OUTAGE REQUIRED. Scheduled for TUE 11/15/11 at 11:45 PM. Power to be restored WED. 11/16/11 2:00 AM
Add 3 audible/visual horn/strobes.
Fire alarm work for renovation of 5th floor lab.
Electrical work as required for renovation of 5th floor lab, including replacement and relocation of (3) existing panelboards.
New mop sink and water heater in basement. New lavatories on first floor, floor drain, and mop sink.
Laboratory renovation. Work scope includes misc. demolition, upgrade to the HVAC system, plumbing, fire protection improvements,fire alarm upgrades,electrical improvements, some mi…
Remove ACT ceilings/wood half walls/ flooring and workstations. Sprinkler protection and FA will remain. No egress changes and no structural demo required.;; Has ALT on fast track…
Yearly maintenance permit 2011
West wing 1st floor and lower level install pumps and controls outlet and heaters for touch tank and other exhibits
Selective demolition of existing exhibits and flooring at west wing basement and first floor Construct area to receive new updated exhibits. MEP FP and FA work,per plans.
Remove top portion of concrete knee wall and install a railing in its place.
Annual Maintenance permit.