Building permit intelligence · Boston, MA
282 Newbury St has 31 municipal building permits on file in Ward 5. The latest recorded activity was a intren permit dated Jul 14, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Renovations - Interior NSC
Renovations - Exterior
Other
Run new wires for kitchen and bathroom, upgrade existing electrical subpanel
RENOVATION UNIT 11: 1 gas stove
RENOVATION UNIT 11: 1 bathroom and 1 kitchen on third floor
3 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Newbury St with municipal permit records in Boston.
This address has 31 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 282 Newbury St is dated Jul 14, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 282 Newbury St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Unit #11- Remodel exist Kitchen and Bath, new cabinets, countertop, tiles and finishes. Interior Paintings. Include Plumbing and Electrical.
Kitchen remodel, replace existing fixtures, bathroom remodel
Kitchen and bath renovation
Replace gas stove.
Kitchen renovation, new cabinets, new appliances, bathroom renovation, new fixtures, painting, plumbing, replace light fixtures, electrical. unit 21, only
UNIT #19 WIRE NEW BATHROOM AND NEW KITCHEN. NEW LIGHTING SYSTEM AND ADD 2 PLUGS IN BEDROOMS.
UNIT #19 INSTALL NEW HARD WIRE SMOKE ALARM SYSTEM.
Install gas stove
Re work plumbing in kitchen and bath for renovation
;Unit # 19 KITCHEN RENOVATION: Replace cabinets, new plumbing and new electrical. Remove partition wall( non load bearing). BATHROOM RENOVATION: Remove walls and ceilings, new plum…
Install (9) new windows to match existing in building. BBAC approved this renovation and the window specs to be used (approval granted on Wednesday, October 11, 2017 by Joe Cornish…
relocate electric panel
renovate kitchen add 3 120v lines, removal and reconnection of appliances
rehab kitchen and add laundry
remove old cabinets,instal new cabinets.paint,
REPLACE HOT WATER TANK & CONNECT BOILER FEED
GAS PIPING TO HOT WATER HEATER & BOILER
replace bathroom fixtures, kitchen renovation
move gas stove 2 feet and replace.
re wire kitchen and bath
Unit #3 Demo Bathroom to studs, new finishes. Replace kitchen in kind, remove and re-tile floor. Add small closets in two bedrooms. Paint entire unit.
installation of 1 stove
installation of 1 tub, 1 toilet, 1 lavatory, 1 kitchen sink, 1 dishwasher, 1 disposal
Install wiring to kitchen remodel and Bathroom. Replacement of electrical panel. Installation of 4 smoke detectors.
Unit; #10-Replace kitchen cabinets, replace tile in shower, electrical upgrade in kitchen and bathroom, paint whole apartment and refinished hardwood floors