Building permit intelligence · Boston, MA
30 Northampton St has 70 municipal building permits on file in Ward 8. The latest recorded activity was a electrical permit dated Apr 6, 2026. Permits at this address represent $5MM–$25MM in total declared construction value.
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Plumbing
8 other addresses on Northampton St with municipal permit records in Boston.
This address has 70 permit records in PropertyLabs' public history and is located in Ward 8. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 30 Northampton St is dated Apr 6, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 30 Northampton St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
installation of steel racking into existing building. Verify by ward inspector at the site with smoke, Horn strokes in the bathrooms and large room.
Interior/Exterior Work
remove 2 existing SG Torrice pan signs and replace with Ferguson branded signs.
Gas
Electrical
Electrical
Low Voltage
Plumbing
Other
Install (1) halo lit channel letter set on the front elevation and (1) non illuminated letter set on the side elevation. Both signs to measure 36"H x 83 1/4"W.
Installing a raceway & 100A feeder for a rooftop dehumidifier. Also wiring of a duct smoke.
Install raceway & 100A feeder for a rooftop dehumidifier. Wire duct smoke.
Gas piping for additional roof top heating unit
Record Storage Warehouse, Offices and Clinic; Certificate for;Walk in Cooler &;;;Freezer--Only ALT952447 issued: 7/29/19 ;
Gas piping for replacement generator
ADDITION TO ACCESS CONTROL SYSTEM
Record Storage Warehouse, Offices and Clinic; Certificate for;Walk in Cooler &;;;Freezer--Only ALT952447 issued: 7/29/19 *Temporary certificate expires 12/2&;/19 pending completion…
Installation of interior storage racks in an existing warehouse. eplan
Install plumbing for a food process room at Amazon
Install 70 CAT 6 network drops and remove 4 existing network drops
Renovation of inside of an existing distribution facility. Racking is being removed to install a walk in cooler, freezer and a transformation room where produce will be getting was…
Installing a freezer and a cooler with lighting and mechanical on the ground floor of the warehouse. Adding 3 sub-panels on the ground floor and a generator to the roof.
Relocating 2 fire alarm audio/visual devices and one smoke detector, extending conduit and wires.
Record Storage Warehouse,;Offices and Clinic Certificate;For:; Clinic - ;only ALT361483,;- 2/20/15 &; U4952622 - 6/1/16
disconnect and reconnect gas generator
Disconnecting existing generator to allow for repair of pad. After repair is complete installing generator back with existing wiring.
Extend generator feeder to allow for new curb to be installed. Extend existing 3" gas line to meet new height requirement for new generator sleeper.
Install new electrical panel, wire new walk in cooler and install 3 receptacles
install 2 data drops for wireless access points
Install new walk-in refrigeration system in existing warehouse space (amazonUMA3) two heads by others
Replace pump
Record Storage, Warehouse, Offices, and Clinic CO-For Warehouse Food Distribution,;;New Common;Areas,;Break Room &; Bull Pen alt650195 issued 11/21/16, A 667563;issued ;3/1/17 ;
Installing access control on 3 doors
Health approval for;warehouse food distribution
Record Storage Warehouse,;Offices and Clinic Temporary Certificate of Occupancy for the Clinic only *pending completion of the Board of Appeal Process and Sidewalk repairs.; To Exp…
Renovation of existing space for new warehouse. 3 RTUs and one generator on roof.
Interior tenant fit out new bathrooms, break room, bull pin room, ;new sprinkler as per plans
11 Camera CCTV System
Installation of bathrooms in a renovated warehouse
Amazon tenant fit-out. Single floor. Power, lighting, fire alarm and generator with transfer switch.
One (1) set of 8" h x 1" deep black painted letters reading 30 NORTHAMPTON STREET
Construction of a new store front and canopy see BRA approved drawings attached
Upgrade 4,000 amp service. New primary line and new pad mount transformer. CT cabinet. - Temporary lighting @ (5) exit signs and (15) hi-bays.
Addition to existing system - (2) pull stations and (2) horn / strobes.
Water main piping into Building 2
Upgrade Electrical, create new electrical room, rebuilding adjacent;sprinkler room, install seimic bracing, constructing a new storefront, Canopy and sidewalk, and install a new se…
This application seeks to increase the previously approved parking spots issued with ALT361483 &; BOA384303; at the front of the 30 Northampton St. from 33 parking spots to 41 park…
Install 100 amp single phase meter socket for warehouse.
Install second meter and RPZ for irrigation
install 100 amp single phase meter socket for existing house panel.
Install three light poles in parking lot.
Install new pull stations on strobes, smoke detectors and duct detectors on two existing panels.
wire 35 office cubes partitions.
Install one (1) non-illuminated 2" deep painted aluminum sign reading "COMMONWEALTH COMMUNITY CARE" with logo. Total height of sign is 32" h x 107.81" w. Also install one (1) LED i…
(2)exterior, aluminum, non-illuminated pan signs BRA approved and stamped.
Install two new roof top units totaling 800,000 btus
Rewire existing two story office space. Wire two roof top ac units and one elevator.
Installation of data cabling on the 1st and 2nd floors.
Renovate space. New bathrooms / bar type sinks and ejector system
Install burg alarm 30 Northampton St Boston, MA
Installation of warehouse racking system as per Drawing A1.1 dated 2/10/15. Racks will be 10ft high and will not affect the fire protection system, because ceiling height is about…
Change;Occupancy;to include;Clinic and renovate
Retest 3 meters.