Building permit intelligence · Boston, MA
30 Rockingham Av has 41 municipal building permits on file in Ward 20. The latest recorded activity was a electrical permit dated Jul 23, 2026. Permits at this address represent $500K–$1MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Electrical
Renovations - Interior NSC
Electrical
Demolition - Interior
replace water damaged light fixtures and devices
Plumbing
3 mapped permits within 500 m, shown on the intelligence map above.
1 other address on Rockingham Av with municipal permit records in Boston.
This address has 41 permit records in PropertyLabs' public history and is located in Ward 20. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 30 Rockingham Av is dated Jul 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 30 Rockingham Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Roofing
Other
Demolition - Exterior
Electrical
Plumbing
Interior/Exterior Work
Plumbing
Electrical
Renovations - Interior NSC
Electrical
Plumbing
Interior/Exterior Work
Make unit ADA compliant. install grab bar, shower and widen door to bathroom
Install center drain shower and move toilet.
Make ADA compliant. Move electrical panel, move plugs and switches
Move electrical panel, move four plugs and four switches
Make unit ADA compliant. install grab bar, shower and widen door to bathroom
Install center drain shower and move toilet
Unit 212-Make unit ADA compliant.
Bring unit to compliance for ADA unit, move panel box to code.
Make unit ADA compliant, install roll-in shower.
On Behalf of Sprint, the proposed work involves modifying the antenna equipment. Please reference the construction drawing for further details.
30 Rockingham Ave -; Install main entrance sign on existing brick wall;;;;;; E- Plan
Enclose fitness area with 2x4 partitions
move tub,w.c. and lav 6 inches forward for new wall
Install new wiring in kitchen and bath and new subpanel in unit #102 handicap unit. Install (4) dedicated receptacles in new gym area. Install transfer switch, disconnect switch an…
Install (4) receptacles for gym equipment in gym. Install transfer switch, disconnect switch and Cogen at 40 Rockingham Ave.
Renovate unit 102 to ADA guidelines. Enlarge bathroom, modify kitchen layout, install 36" doors, install automatic door opener per plans attached.
Add 35kw cogeneration, Replace boilers
Replace existing hot water , and heating system with new boilers indirect hot water heaters and cogeneration
Wire new heating/hot water boilers
Install (142) new 110 volt photoelectric interconnected combo smoke/carbon detectors in common hallways off bedrooms in (48) 2-bedroom units and (94) 1-bedroom units. Install (190)…
Install (142) new 110 volt photoelectric interconnected combo smoke/carbon detectors in common hallways off bedrooms in (48) 2-bedroom units and (94) 1-bedroom units. Install (190)…
CCTV System Installation
Remove roof ballast and existing membrane sheet. Install 1/2" insulation and new adhered rubber roof.