Building permit intelligence · Boston, MA
301 Guest St has 96 municipal building permits on file in Ward 22. The latest recorded activity was a electrical permit dated May 13, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Electrical
Electrical
Electrical
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
3 mapped permits within 500 m, shown on the intelligence map above.
4 other addresses on Guest St with municipal permit records in Boston.
This address has 96 permit records in PropertyLabs' public history and is located in Ward 22. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 301 Guest St is dated May 13, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 301 Guest St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Interior/Exterior Work
Signs
Signs
Signs
Signs
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Wiring of low voltage devices
Installation of lighting, receptacle devices, HVAC wiring
HVAC Controls - VRF System
VRF System
renovation to the 1st floor for new fire alarm for new tennis and pickleball courts
Minor selective demolition, framing of non structural interior walls and minor MEP installation. No fire alarm, sprinkler or egress work required. Cost reflected on;ALT1787487
Plumbing work, Install toilet, lavatory, counter sink, mop sink, water heater, valve box.
New Pickleball facility
renovation to the 1st floor for new Pickleball and tennis courts
tenant fit out
Remove existing duct riser and replace with black iron ductwork for future kitchen exhaust system.
Install 3 illuminated Signs for a new tenant HoneyGrow at 305 Guest St Suite E (this location was available in the drop down address options)
Installing security cameras and low voltage soeakers
Honeygrow Allston Yards. MISC Low Voltage HVAC Control Wiring AG 253397
TENANT FITOUT FIRE ALARM WORK CONSISTING OF 9 DEVICES
Provide and install lighting and power in existing tenant space at 301 Guest Street.
Gas plumbing in conjunction with new commercial building
New plumbing in conjunction with commercial building construction
Change of occupancy to include restaurant w37. Tenant buildout for first generation tenant restaurant "Honeygrow". Work is at 305 Guest St.eplan
Location 2 - Install (1) double sided internally illuminated directional sign, cabinet is 7'h x 52"w (30.33 SF), overall height from grade is 102" [eFile]
Filing to subdivide an approximately 2,886 square foot parcel from the existing 301 Guest Street Property. The BPDA has provided a certification that the subdivision is allowed und…
Install (1) double sided internally illuminated directional sign, cabinet is 5’h x 32”w (13.33 SF), overall height from grade is 66.
10 outlets, 1 switch, and 400A new underground service
Installation of 21 exterior fixtures on the Allston Yards Community Green
150 Residential Units, Retails &; BankCertificate for Grocery StoreALT1596948 Issued 6/11/24 &; SF1294686 Issued 9/29/22
150 Residential Units, Retails &; BankTemporary Certificate for Ribbon Cutting Ceremony for Stop and Shop Store June 20, 2024, 9:00am through 1:00pm and Grand Opening June 21, 2024…
Erect 36x60 tent and 8x16x16" platform on 6/19/24, removal on 6/20/24.
Second floor interior Fit Out of the Stop and Shop Grocery Store retail space within the Allston Yards building "A" project. This includes new fire alarm system, CaptiveAir hood sy…
One Hundred and Sixty Five (165) Residential Units, Retails and Parking GarageCertificate for Base Building Core/Shell Basement thru 4th floor, One Hundred and Sixty Five (165) Res…
Citizens Bank renovation inside Stop & Shop. Add/relocate power, lighting
Citizens bank branch renovation Install security wire only
Citizens bank branch renovation of the fire alarm
Change of Occupancy to add bank - Citizens Bank - 2nd floor work consists of new fit out in the Stop and Shop new drywall, electrical/Fire Alarm, sprinkler, HVAC, and finishes
install signage on building facade. drawings attached
2 - New sets of illuminated channel letters and logo mounted on rails to existing brackets for West & North Elevations, stamped drawing from BRA attached.
install gas for new roof top units
interior fit out of the Stop and Shop retail space in Allston Yards Building A.
Interior fit out of the stop and shop retail space in Allston yards Building A Project.
Interior Fit out of the stop and shop retail space in Allston Yards building A
V22101 Permit is for AV, Security and Tel-Data
EMD will be installing the gas main in the new Allston yards project. This includes 2 capped future tenant spaces and the capped future gas line on level 2 to serve the stop and sh…
Second floor interior Fit Out of the Stop and Shop retail space within the Allston Yards building "A" project.
TENANT FIT OUT FOR A NEW STOP AND SHOP SUPERMARKET. WASTE, VENT, WATER, FIXTURES
Installation of new Fire Alarm system for an 8 story building, (2) floors of underground parking , (1) Floor of Amenity and Retail space, (1) Floor designated for supermarket (done…
2 floors of underground parking garage with 6 floor of amenity and residential dwelling units above. 1st floor amenity and tenant space. 2nd floor Stop & Shop market (done by other…
Allston Yards, Building “A” is a mixed use residential and retail project. The project includes a four story residential building of 165 units over a podium level with two stories…