Building permit intelligence · Minneapolis, MN
3120 Washburn Ave N has 7 municipal building permits on file in Jordan. The latest recorded activity was a mechanical permit dated Jan 14, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
TempHeat
1. Approval of these plans shall not be construed as permitting a violation of the building codes or any other laws or ordinances. HVAC system for 6 story 60 units apartment buildi…
The Warren is a new 6 story apartment building. 60 units in total. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. A…
NEW 6 STORY, 60 UNIT APT BLDG. DESIGNED FOR FUTURE PANELS. HORIZONTAL EXIT. NO PENETRATIONS IN WALL WITH HORIZONTAL EXIT. ALL EXTERIOR WOOD TO BE FRT INCLUDING PARAPET. TJIS NOT PE…
Wrecking commercial building PDR PLAN19401
2 mapped permits within 500 m, shown on the intelligence map above.
9 other addresses on Washburn Ave N with municipal permit records in Minneapolis.
This address has 7 permit records in PropertyLabs' public history and is located in Jordan. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 3120 Washburn Ave N is dated Jan 14, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 3120 Washburn Ave N in the PropertyLabs platform, along with alerts when new permits are filed at this address.
alterations to existing telecommunications equipment.
Maintenance modification of telecommunications equipment. Remove and replace antennas, cables, and RRUs. Mounts will be re-used. ______ Maintain fire-caulking/fire-rating at any pe…