Building permit intelligence · Boston, MA
32 Thornton St has 21 municipal building permits on file in Ward 9. The latest recorded activity was a electrical permit dated Apr 25, 2026. Permits at this address represent $50K–$100K in total declared construction value. PropertyLabs also identified 3 mapped permits within 2 km of this address.
Electrical
Electrical
Insulation
Insulation
Insulation
Electrical
3 mapped permits within 2 km, shown on the intelligence map above.
9 other addresses on Thornton St with municipal permit records in Boston.
This address has 21 permit records in PropertyLabs' public history and is located in Ward 9. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 32 Thornton St is dated Apr 25, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 32 Thornton St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Renovations - Interior NSC
install gas combi boiler
install combi gas boiler
install three new door bell chimes to existing wiring within the first second and third floor units. install new door bell wiring if needed,
complete the installation of a bathroom exhaust fan unit in the first floor unit. complete the connections within a bathroom ceiling slice box and install a wall switch within an e…
Install three hard wired smoke carbon dioxide detectors with in the 3rd floor unit
Change occupancy from two family to a three family. Existing condition no work to be done. Request occupancy committee review.
To install water closets on 2nd and 3rd for. Install lavatories on 2nd and 3rd flr. Install kitchen sinks 2nd and 3rd for. Install shower stall on 2nd for. Install bath tub on 3rd…
Install 2 gas ranges for 2nd and 3rd floors.
Install outlets in bedroom 1, bedroom 2, living room and dining room , install sub panel on second floor
Kitchen outlets , countertop circuits , appliance circuits , bathroom fan , bathroom gfci and vanity lite
Remodel 2nd and 3rd floor bathroom and kitchen sink
renovations of second floor kitchen and bathroom and third floor bathroom and kitchen.Repair front railings exterior of house.Repair gutters and downspouts.Prime and paint both uni…
install 9 replacement windows no structural changes