Building permit intelligence · Minneapolis, MN
3220 Irving Ave S has 11 municipal building permits on file in East Bde Maka Ska. The latest recorded activity was a plumbing permit dated Jan 28, 2026. Permits at this address represent $50K–$100K in total declared construction value. PropertyLabs also identified 6 mapped permits within 500 m of this address.
ComMin
REPLACE WATER HEATER
#1 - REPLACE TUB, LAV, AND TOILET
reroof house and garage
CONVERT TO TRIPLEXBUILDING FROM EXISTING DUPLEX BUILDING WITH ADU ON 3RD ATTIC FLOOR. AAJ#1 ***NOTE: THIS PERMIT IS ISSUED FOR CERTIFICATE OF OCCUANCY DUE TO CONVERSION TO TRIPLEX…
ADDING ADU TO DUPLEX ON LEVEL 3. 13R STRINKLER SYSTEM ADDED TO ENTIRE BUILDING. CEILING OF ADU CONSISTS OF PLASTER AND HAS STS OF 52. CONFIRM PLASTER ON CEILING AND CO2 AND SMOKE D…
6 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Irving Ave S with municipal permit records in Minneapolis.
This address has 11 permit records in PropertyLabs' public history and is located in East Bde Maka Ska. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 3220 Irving Ave S is dated Jan 28, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 3220 Irving Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
3rd floor kitchen addition.
Add washer box for 2nd floor unit
Installing Mitsubishi mini split system - 7 indoor 13 outdoor (heating & cooling). Installing Mitsubishi mini split system - 7 indoor 13 outdoor (heating & cooling).
water heaters 3 power vent water heaters
REMODEL BATHROOMS- (8) FIXTURES - 1ST, 2ND & 3RD FLOOR REMODEL BATHROOMS- (8) FIXTURES - 1ST, 2ND & 3RD FLOOR
Mechanical · Jul 23, 2026