Building permit intelligence · Boston, MA
33 Harry Agganis Wy has 15 municipal building permits on file in Ward 21. The latest recorded activity was a other permit dated Jul 20, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Other
Low Voltage
Interior/Exterior Work
Special Events
Electrical
Retrofit lighting in all of the dormitory all fixtures given by eversource
1 mapped permit within 500 m, shown on the intelligence map above.
1 other address on Harry Agganis Wy with municipal permit records in Boston.
This address has 15 permit records in PropertyLabs' public history and is located in Ward 21. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 33 Harry Agganis Wy is dated Jul 20, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 33 Harry Agganis Wy in the PropertyLabs platform, along with alerts when new permits are filed at this address.
33 Agganis Way - Fuel Oil Upgrades, low voltage HVAC control wiring - JG, 197580
Low Voltage - Loading Dock Egress Door
Installation of exposed conduit on parking lot island for new parking equipment. Extend existing power circuit to new equipment.
Install temporary tents for commencement 16'x16', 20'x40', 9'x16', 9'x20', 9'x110', 100' x140', 40'x55 Install on; 5/6/15 Remove on or about 5/18/15
Install temporary tents for commencement 16'x16', 20'x40', 9'x16', 9'x20', 9'x110', 100'x140', 40'x55' Install on or about 05/14/2014 Except for the 100'x140' on or about 05/02/201…
Temporary circuits for heaters on stand temp lights in field
Install temporary 100' x 140' Pole tent and a 40' x 55' frame tent for commencement. Install on or about 05/15/2013 Remove on or about 05/21/2013
Install temporary 16' x 16' frame tent and a 20' x 40' frame tent for commencement. Install on or about 05/15/2013 Remove on or about 05/19/2013
Install temporary tents for use on 2/8/13 1 - 30' x 50' frame tent & 1 - 12' x 22' frame tent Install on or about 08/08/13 Remove on or about 08/09/13