333 108TH Ave NE has 200 municipal building permits on file in Downtown. The latest recorded activity was a electrical no plan review permit dated Jul 22, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 40 mapped permits within 500 m of this address.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (39 Security System), 530800
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Security System), 530855
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Light Fixtures)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Heat Pump, 12 Receptacles, 1 Pump)
40 mapped permits within 500 m, shown on the intelligence map above.
This address has 200 permit records in PropertyLabs' public history and is located in Downtown. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 333 108TH Ave NE is dated Jul 22, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 333 108TH Ave NE in the PropertyLabs platform, along with alerts when new permits are filed at this address.
A Nonresidential New Structure Low Voltage Only Project Involving (24 Telecommunications System), SEA94.09.300
A Nonresidential New Structure Low Voltage Only Project Involving (4 Telecommunications System), P-603602
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (7 Fire Alarms)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (8 Security System), 529253
A Multifamily Residential Alteration to Existing Structure Fire Alarm Transmitter, 22 105456 FE
A Nonresidential Alteration to Existing Structure Electrical Project Involving (3 Industrial Equipment)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (3 Light Fixtures, 19 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure None Project Involving (1 Diffusers or Grilles = < 15)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Added or Altered Branch Circuits)
ANCHOR (2) PRE-MANUFACTURED PHONE BOOTHS ON THE TWELFTH FLOOR.
A Nonresidential Repair or Replacement Electrical Project Involving (1 Vehicle Charging Station), 80404
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (2 Fire Alarms)
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1 Total Sprinkler Heads)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test), SR00116424
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test), SR00116425
SPLICE AT MULTIPLE LOCATIONS
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (46 Energy Management)
Splicing (4) locations
On the SW corner of 108th Ave NE and NE 4th St, access existing Zayo vault to splice fiber. This was an Emergency fiber outage. All splicing work has been completed.
Splice (3) locations
Splice (6) locations
Splice (4) locations
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Added or Altered Branch Circuits, 1 Ground Rod), 0
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Receptacles, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles), none
Modify existing fire alarm system for tenant improvements. Upgrade and modernize all power supplies and cards within existing (6) panels. 333 Tower, 333 108th Avenue NE Bellevue, W…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Added or Altered Branch Circuits), N/A
Remove and properly dispose of existing water source heat pumps per EPA standards; install Daikin indoor VRF Equipment in (4) rooms per plans and Daikin outdoor VRF equipment in ga…
A Nonresidential Repair or Replacement Electrical Project Involving (2 Receptacles), none
FOR PROJECT "CRAN_RWOR_WABLV_002" - ALL WORK HAS BEEN COMPLETED UNDER EXPIRED PERMIT 20 104541 TJ. PER TIM STEVER, SUBMITTING A NEW PERMIT TO SCHEDULE INSPECTION
A Nonresidential Alteration to Existing Structure Project Installing {262-Light Fixtures} Adding motion sensors to existing fixtures.
A Nonresidential Repair or Replacement Electrical Project Involving (2 Receptacles)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles) *add (1) 20A/120V
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Generator Load Bank Test), Tower 333/ 7717805
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (200 Telecommunications System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Added or Altered Branch Circuits)
A Nonresidential Addition to Existing Structure Electrical Project Involving (3 Receptacles)
A Nonresidential Repair or Replacement Electrical Project Involving (8 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (7 Security System)
Inspect the sewer pipe interior at NE 4th and 108 Ave NE, at night during the draining of the pipe for the header replacement.
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (5 Cable TV or Closed Circuit TV Coaxial Cable)
Installation of a 6''x6'' suspended ACT ceiling cloud
Visit Bellevue has a Mobile Welcome Center. Amazon would like it to be present during their Town Hall meeting with the mayor July 6, 2023., unknown. Permit allows for use and or cr…
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1 Relocated Heads, 1 Total Sprinkler Heads)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (221 Intercom and Communication)
Window replacement on 4th floor requiring use of lift on sidewalk off NE 4th Street.
TENANT IMPROVEMENT TO THE NORTH PORTION OF LEVEL 10 OF AN EXISTING 18-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE: RELOCATION OF EXISTING DEMOUNTABLE PARTITIONS, NO STRUCTURAL…
A Nonresidential Alteration to Existing Structure Low Voltage Only
Replace water source heat pumps with split systems per plans
TENANT IMPROVEMENT TO THE NORTH & SOUTH PORTIONS OF LEVEL 15 OF AN EXISTING 18-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE: RELOCATION OF EXISTING DEMOUNTABLE PARTITIONS AND TR…
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
TENANT IMPROVEMENT TO THE NORTH & SOUTH PORTIONS OF LEVEL 14 OF AN EXISTING 18-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE RELOCATION OF EXISTING DEMOUNTABLE PARTITIONS AND TRA…
Interior tenant improvement to add (1) digital screen to the elevator lobbies of floors L, 3, and 11.
Remove and replace current BDA for ERRCS DAS
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (3 Security System)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (4 Receptacles, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (3 Receptacles)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
A Nonresidential Addition to Existing Structure Low Voltage Only Project Involving (1 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Heat Trace)
Modify existing fire alarm system 333 Tower Level A, Security Room. Add (1) 4100ES Color Touchscreen Annunciator Panel, (1) Smoke Sensor, (1) Strobe. Joint venture between Johnson…
A Nonresidential Repair or Replacement Electrical Project Involving (150 Light Fixtures)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Light Fixtures, 4 Receptacles)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Security System)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles)
TENANT IMPROVEMENT TO THE NORTH, SOUTH, AND WEST PORTIONS OF LEVEL 16 OF AN EXISTING 20-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE: - INSTALLATION OF DEMOUNTABLE FURNITURE PAR…
TENANT IMPROVEMENT TO THE NORTH & SOUTH PORTIONS OF LEVEL 16 OF AN EXISTING 20-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE: - INSTALLATION OF DEMOUNTABLE FURNITURE PARTITIONS A…
Modify existing fire alarm system Tower 333, Lower Lobby Level, LL612 Team Room, replace (1) speaker to (1) speaker/strobe. Joint venture between Johnson Controls Fire Protection a…
Demo (1) transfer fan and (2) transfer grilles. Install (1) fan powered terminal unit, (2) diffusers, (1) transfer grille, and ductwork.
INSTALL NEW DOG RUN ON THE LEVEL L PATIO, INCLUDING (1) AREA DRAIN, (1) DOG DRAIN, (1) DOG WATERING STATION, AND (1) POST HYDRANT, PER PLAN.
TENANT IMPROVEMENT TO THE SOUTH PORTION OF LEVEL 10 OF AN EXISTING 20-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE: - INSTALLATION OF DEMOUNTABLE FURNITURE PARTITIONS A…
TENANT IMPROVEMENT TO THE NORTH & SOUTH PORTIONS OF LEVEL 18 OF AN EXISTING 20-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE: - INSTALLATION OF DEMOUNTABLE FURNITURE PARTITIONS A…
ACCESS EXISTING VAULTS FOR AUDIT AND SPLICING AT 3 LOCATIONS: 333 108TH AVE NE; FACTORIA BLVD SE & I-90 1640 148TH AVE SE
Installing lighting in (5) trees on NE 4th Ave, and (3) trees on 108th Ave NE. 15 stings per tree installed from ladders. No lifts or street closures required. P…
Replace (1) water source heat pump with ductwork.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Pump, 1 Added or Altered Branch Circuits)
Tenant Improvement of Level 19 including installation of demountable furniture partitions and track system, power poles, and demolition of existing windows, door and relite.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (80 Light Fixtures, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (4 Telecommunications System)
TENANT IMPROVEMENT TO LEVEL 20 OF AN EXISTING 20-STORY OFFICE BUILDING FOR OFFICE USE TO INCLUDE: INSTALLATION OF DEMOUNTABLE FURNITURE PARTITIONS AND TRACK SYSTEM NO STRUCTURAL WO…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits)
ADD FIRE DAMPERS TO EXISTING DUCT IN NEW 2 HOUR RATED WALL.
EXT 11/9/21 KB. Splice at 2 locations
A Nonresidential Alteration to Existing Structure Electrical Project Involving (21 Light Fixtures, 3 Switches, 3 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical
A Nonresidential Repair or Replacement Electrical Project Involving (1 Generator Load Bank Test)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Energy Management)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (6 Security System)
Construction of a new dog run / seating area on the existing exterior west plaza
THE EXISTING DOMESTIC WATER BOOSTER PUMP SYSTEM LOCATED AT OFFICE TOWER 333 IN BELLEVUE, WASHINGTON IS TO BE REPLACED WITH A NEW, HIGH EFFICIENCY BOOSTER PUMP SYSTEM. THE EXISTING…
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Heat Trace)
A Nonresidential Addition to Existing Structure Low Voltage Only Project Involving (5 Speaker Wire)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (5 Receptacles, 1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (3 Added or Altered Branch Circuits)
INSTALL NEW CAFE ON FLOOR L INCLUDING (1) ELECTRIC WATER HEATER, (2) FLOOR SINKS, (1) FUNNEL DRAINS, (3) SINKS, (1) DISHWASHER, AND EQUIPMENT CONNECTIONS, PER PLAN.
A Nonresidential Addition to Existing Structure Electrical Project Involving (14 Vehicle Charging Station)
TIE INTO EXISTING VERIZON SYSTEM AT MFS VAULT LOCATED AT THE SOUTHEAST CORNER OF NE 4TH ST AND 108TH AVE NE INTERSECTION. TRENCH (1) 2" CONDUIT NORTH INTO INTERSECTION AND THEN DRI…
Add and relocate sprinklers for new ceiling and wall layout
1,512 SF TENANT IMPROVEMENT, DEMOLITION AND REPLACEMENT OF INTERIOR FINISHES AND LIGHTING TO EXISTING COFFEE SHOP AND SEATING AREAS ON LEVEL L.
RELOCATE (5) EXISTING FAN POWERED TERMINAL BOXES AS REQUIRED TO MAKE ACCESSIBLE ABOVE NEW CEILING SYSTEM. NEW LOW PRESSURE DUCTWORK DOWNSTREAM OF TERMINAL BOXES, PER PLAN.
A Nonresidential New Structure Low Voltage Only Project Involving (53 T-Stat or HVAC Controls)
Modify existing fire alarm system 333 Tower, Lobby Level Cafe Ladro TI. (4) Speaker/Strobes. Joint venture between Johnson Controls Fire Protection and Prime Electric.
Electrical TI - updating North Lobby and Lower Lobby lighting and power. Job # 6007149
A Nonresidential Alteration to Existing Structure Electrical Project Involving (5 Office Furniture)
Electrical TI - Updating Level C and D parking areas to include infrastructure for EV charging stations. Job # 6007149, N/A
Electrical TI - Updating Lobby Cafe Lighting and Power. Job # 6007149
Electrical TI - Updating Level 11 NW corner, updating lighting and power layouts for offices. Job # 6007149
Modify existing fire alarm Tower 333 Level 11 Amazon Executive Suite. Relocate/re-use (7) devices. Joint venture between Johnson Control Fire Protection and Prime Electric.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure None Project Involving (4 Diffusers or Grilles = < 15)
6,000SF TENANT IMPROVEMENT, DEMOLITION AND REPLACEMENT OF INTERIOR FINISHES AND LIGHTING IN LEVEL L AND LL BUILDING LOBBY.
A Nonresidential Alteration to Existing Structure Project Installing {1-Switches, 1-Receptacles} Added receptacle and shifting existing poke-thru. Light switch relocation (wireless…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (8 Security System), 20 119943 BF
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (5 Total Sprinkler Heads)
Tenant improvement, demolition and replacement of interior finishes and lighting to north west corner of the existing office on level 11.
A Nonresidential Alteration to Existing Structure Electrical
Add one transfer fan in electrical room 11.633, per plan.
Replace existing fire pump motor with new motor of same specifications.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (51 Added or Altered Branch Circuits)
EXT 8/26/21 KB. EXT 2/22/21 KB. SECTION 1) STARTING AT EXISTING MAN HOLE NEAR 350 106TH AVE NE, BEGIN PROOF AND PULL APPROX. 620' TO EXISTING MAN HOLE NEAR 333 108TH AVE NE. SECTIO…
EXT 8/25/21 KB. EXT 2/18/21 KB. STARTING WITH EXISTING MANHOLE NEAR 200 NE 2ND ST PROOF AND PULL 98CT FIBER APPROX 75' WEST TO 108TH AVE NE THEN CONTINUE PROOF AND PULL APPROX. 620…
A Nonresidential Alteration to Existing Structure None Project Involving (1 Diffusers or Grilles = < 15)
A Nonresidential Alteration to Existing Structure Project Installing {1-VAV Boxes - Relocating or adding less than 5, 1-Diffusers or Grilles = < 15} Add one VAV box to Shop & Contr…
Install new 6" exhaust duct at level 8 and 15 janitor rooms. Tie exhaust in to existing building toilet exhaust. Exhaust duct penetrates one fire partition (damper exception #3).
A Nonresidential Alteration to Existing Structure Electrical Project Involving (128 Office Furniture)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (96 Office Furniture)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (128 Office Furniture)
A Nonresidential Alteration to Existing Structure None Project Involving (2 Exhaust Fan with Duct)
A Nonresidential Alteration to Existing Structure None Project Involving (2 Mop Sink)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 T-Stat or HVAC Controls)
Add 500 gallon diesel fuel tank and control panel to existing generator, per plan.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (3 Speaker Wire)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (300 Heat Trace, 1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (128 Office Furniture)
EXT 3/23/21 KB. Pull fiber through existing Zayo conduit, intercept existing Zayo conduit and set 25ta vault. Trench to building edge and install conduit and fiber.
Last extension to end of 2022. WZ. Extended to 12/31/2021 on 9/2/2020 by WZ. Essential Utilities Maintenance. Field inspection and plugging of two siphon inlets that are within an…
A Nonresidential New Structure Low Voltage Only
A Nonresidential New Structure Low Voltage Only
A Nonresidential New Structure Low Voltage Only
A Nonresidential New Structure Low Voltage Only
A Nonresidential New Structure Low Voltage Only
CenturyLink to access MH723 and MH886to splice . No disturbance of surface.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (64 Office Furniture)
install one neon sculpture hanging above foyer stairs
Installation of (1) Ansul R-102 Fire Suppression System.
Installation of (1) UL 300 Compliant Ansul R-102 12 gallon Fire Suppression System.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (754 Security System)
Removal of existing parking gate and diagonal striping.
zoning letter request
Pole reservation request , to allow time for design and eventual ROW application submittal for replacement of existing city-owned light standard with new light standard and attach…
Please provide a zoning letter, copies of zoning and building code violations, certificates of occupancy and variances on file for 333 108th Avenue NE. Our ref 136847-1
INSTALL NEW LOCKER ROOM PLUMBING ON FLOOR LL, INCLUDING (12) SHOWERS, (4) WATER CLOSETS, (6) LAVATORIES, AND REPLACE A WATER HEATER. INSTALL NEW KITCHEN ON FLOOR L INCLUDING (3) FL…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (530 Energy Management)
18 STORY OFFICE BUILDING: Project includes: Replacing all existing VAV terminal boxes with like kind and sized as required by new building tenant improvement project …
Relocate existing sprinkler heads to accommodate new ceilings and walls
A Nonresidential Alteration to Existing Structure Fire Sprinkler Systems Project Involving (1 Capped or Plugged Heads, 5 Relocated Heads, 7 Quick Response Heads, 7 Total Sprinkler…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (7700 Telecommunications System)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Fan, 6 Added or Altered Branch Circuits)
A Nonresidential Repair or Replacement Electrical Project Involving (43 Added or Altered Branch Circuits)
Closing off the bike lane on 108th Ave. NE to park a truck to load and unload materials for the tenant improvement permit # 19 118426 BZ
A Nonresidential Alteration to Existing Structure Project Installing {1-Egress Lighting, 1-Exit Sign, 9-Small Kitchen Appliance, 1-Light Fixtures, 12-Added or Altered Branch Circui…
Electrical TI - Power Branch, Electrical Distribution Equipment, Lighting, Lighting and Receptacle Controls per plans. JOB# 6007149
TENANT IMPROVEMENT ON PARKING FLOORS, LOWER LOBBY, LOBBY AND LEVELS 3rd & 11th OF A 20-STORY EXISTING HIGH-RISE BUILDING.
Install fire alarm system for Phase 2, Levels 12-20 Amazon. (643) new, (16) relocated devices. Joint venture between Johnson Controls Fire Protection and Prime Electric.
Install fire alarm system for Phase 1, Levels LL-11 Amazon. (766) new, (25) relocated devices. Joint venture between Johnson Controls Fire Protection and Prime Electric.
Interior demolition of non-structural partitions, ceilings, doors, finishes & etc. TI permit submitted separately. Permit No. 19 121179 BZ, 19 121179 BZ
Conceptual smoke control system modifications narrative
A Nonresidential Addition to Existing Structure Electrical Project Involving (62 Added or Altered Branch Circuits)
A Nonresidential Partial Demoltion Primary Building, 19 121179 BZ
INSTALL NEW HAND SINK AND DUMP SINK PER PLAN IN EXISTING 2,732 SF TENANT SPACE, FOB POKE BAR RESTAURANT. EXISTING PLUMBING SYSTEM AND PLUMBING FIXTURE NO CHANGE., 19 1257…
PSE to shut power of to the building on Nov.9th 6 am. Then Electrician will test switch gear in main electrical room. Also being done is meggar test to the bus duct in the building…
remove signs from building
TENANT IMPROVEMENT PROJECT TO CONVERT EXISTING "TANGERINE THAI RESTAURANT" INTO "FOB POKE BAR RESTAURANT" WITHIN EXISTING 2,732 SF TENANT SPACE PER PLAN. EXISTI…
TENANT IMPROVEMENT ON LEVELS 4th THROUGH LEVEL 20th, EXCLUDING 11th & 13th, OF A 20-STORY EXISTING HIGH-RISE BUILDING.
MMMR request to obtain conceptual approval of design approach in advance of a formal building permit application.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Office Furniture, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (7 Security System)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Office Furniture)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Light Fixtures, 1 Receptacles)
A Nonresidential Repair or Replacement Electrical Project Involving (4 Water Heater)
Questions regarding potential tenant improvement modifications and change of use in parking garage and lower level retail.
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Office Furniture, 1 Added or Altered Branch Circuits)
A Nonresidential Repair or Replacement Electrical Project Involving (1 Temporary Service)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Receptacles, 1 Switches, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Office Furniture, 2 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits)
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 1 Added or Altered Branch Circuits)
Electrical No Plan Review · Jul 10, 2026