Building permit intelligence · Boston, MA
35 Sunnyside St has 25 municipal building permits on file in Ward 18. The latest recorded activity was a cob permit dated Jun 12, 2024. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 7 mapped permits within 2 km of this address.
City of Boston
City of Boston
City of Boston
City of Boston
My Way Cafe Kitchen Program C - Channing Elementary, low voltage HVAC control wiring 208711 - JC
City of Boston PFD #7214-C - Renovation of school kitchen area including finishes and equipment
7 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Sunnyside St with municipal permit records in Boston.
This address has 25 permit records in PropertyLabs' public history and is located in Ward 18. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 35 Sunnyside St is dated Jun 12, 2024. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 35 Sunnyside St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
city of boston my way cafe kitchen program 2020
INSTALL FIRE ALARM SPEAKER/STROBES FOR MY WAY CAFE IN THE CHANNING SCHOOL
DEMO EXISTING & INSTALL NEW POWER & LIGHTING FOR THE MY WAY CAFE IN THE CHANNING SCHOOL
INSTALL TEL/DATA DROPS FOR MY WAY CAFE IN THE CHANNING SCHOOL
Installation of Boiler controls and automation
Run Gas Piping to New Boilers
Boiler Replacement, Water Heater Flue and Backflow Preventer
Demolition and disposal of the existing hot water boilers, breaching, pumps, chiller and related appurtenances. Replacing all removed equipment with new to be in compliance with MS…
DISCONNECT EXISTING BOILER ROOM EQUIPMENT AND INSTALL NEW FEEDS TO REPLACEMENT BOILERS AT THE CHANNING SCHOOL. INSTALL NEW LIGHTING AND POWER IN BOILER ROOM. NO PERMIT FEE---SEE AT…
ELECTRICAL MAINTENENCE AT WILLIAM CHANNING SCHOOL
Tear off existing roof system and install a new 3 ply Garland roof system and tapered insulation.
William E. Channing Elementary School.; Exterior Masonry restorations 100% cut and point, lintel replacement, limestone replacement and 100% wash of bricks
Annual maintenance permit.
Provide and install new Fire alarm system.
Provide and install new emergency lighting and exit signs. Provide and install new clock system and pa system.
Annual Maintenance
2 new bathrooms with 6 hand dryers 2 gfi recep. new ex fan
Plumbing Work at the William E. Channing School
Modernization of plumbing facilities at William E.Channing School
Short Form Bldg Permit · SOL · Jul 20, 2026