Building permit intelligence · Boston, MA
38 Fabyan St has 18 municipal building permits on file in Ward 14. The latest recorded activity was a plumbing permit dated Jun 8, 2026. Permits at this address represent $50K–$100K in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
Plumbing
Plumbing
Plumbing
Interior/Exterior Work
Renovations - Interior NSC
Installation of rpz backflow preventer remove existing back flow preventer, remove galvanized pipe and fittings, adapt to poly and cap line
4 mapped permits within 500 m, shown on the intelligence map above.
5 other addresses on Fabyan St with municipal permit records in Boston.
This address has 18 permit records in PropertyLabs' public history and is located in Ward 14. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 38 Fabyan St is dated Jun 8, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 38 Fabyan St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
FURNISH & INSTALL 1 BOILER, 1 GAS MODULATING WATER HEATER, ZONE PUMPS, EXP TANKS
FURNISH & INSTALL 1 BOILER, 1 GAS MODULATING WATER HEATER, ZONE PUMPS, EXP TANKS
Lowering 10 light fixtures and six smoke detectors and bathroom fans . They are installing a sprinklers system .
Adding communication box to existing fire alarm panel .
relocation of water meter
install new automatic fire suppression system serving entire R-2 congregate housing with accessory B use, install new addressable system smoke detector at enclosed sunrooms and add…
Addition of Fire Sprinkler monitoring devices. Replacement of Horn Strobes in building.
Replace wtr htr
Replace Gas water heater
putting up an 20 by 30 anchor fram tent on oct.22,2010 than taking down on the 23rd of oct. this tent is going in a park
Erect 20x30 tent on 10/27/10. Removal on 10/29/10. No smoking under tent.
Replace existing Playground equipment