Building permit intelligence · Boston, MA
396 Beech St has 21 municipal building permits on file in Ward 18. The latest recorded activity was a electrical permit dated Jun 4, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 8 mapped permits within 500 m of this address.
Electrical
Electrical
Gas
Plumbing
Plumbing
Plumbing
8 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Beech St with municipal permit records in Boston.
This address has 21 permit records in PropertyLabs' public history and is located in Ward 18. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 396 Beech St is dated Jun 4, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 396 Beech St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Gas
Gas
Gas
Solar Panels
Solar Panels
Solar Panels
Solar Panels
Solar Panels
finish electrical work from previous electrician, relocate existing service
Remodel with6 baths 3 kitchens and laundry
run gas to furnace and stove on each floor
Replace all windows on the house with Harvey Classic Vinyl windows, misc repairs on;rear deck (flooring, posts to be;wrap w/PVC and railings).
Using a HEPA vacuum system, grind out open joints on front brick staircase, re-point grinded areas using a matching pink mortar mix to ensure the stairs become water-tight. Repair…
All 3 units Renovate 3;kitchens and;6;bathrooms. convert existing closets to a new bathroom. Plumber and electrician responsible for their own permits and inspections.
Test out circuits in first floor unit for service reenergize.
Short Form Bldg Permit · INTEXT · Jul 22, 2026