4029 28TH Ave S has 21 municipal building permits on file in Standish. The latest recorded activity was a commercial permit dated Jul 29, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
interior demolition.
water heater
School HVAC system alteration, installing rooftop units, finned tubes, unit heaters, exhaust fan, GRDs and all associated ductwork per approved plans.
interior renovation of existing shop spaces. certificate of occupancy required no const type: 2b occupancy: e 2020 MSBC sprinklered: yes sac: _0_charges __ met council letter dated…
PLUMBING UPGRADES
1 mapped permit within 500 m, shown on the intelligence map above.
12 other addresses on 28TH Ave S with municipal permit records in Minneapolis.
This address has 21 permit records in PropertyLabs' public history and is located in Standish. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 31, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 4029 28TH Ave S is dated Jul 29, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 4029 28TH Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
construct elevator equipment room in lower level.
Replacement of existing hot water unit heaters with same size.
BOILER REPAIRS
REPAIR MUDLEG OF BLR #2
REPAIR CORNER OF MUDLEG, BLR #1
BOILER REPAIRS
BOILER REPAIRS
Add/Replace Telecom Equip/Antennas special inspections required: no occupancy: E 2015 MSBC
New Antenna on existing pole new fencing, platform and misc equipment ENGINEER: Jordan Shelley #55288
REPLACE BRICK FLOOR OF BOILER #1
REINFORCING EXISTING CELL TOWER. ENGINEER: TOWER ENGINEERING ANDREW T. HALDANE #46900
REPLACE 4 STAYBOLTS ON LEFT SIDE OF KAWANEE BOILER #2
TEAR OFF EXISTING B.U.R OVER GYMNASIUM ROOF AREA AT REAR OF SCHOOL AND (DMH) INSTALL 1 LAYER OF ISO INSULATION, 1/2" PERLITE BOARD AND ASPHALT B.U.R AND GRAVEL. APPROVED PLANS AND…
Modify Ductwork.
REPAIR LEAK ON BOILER #1
SWAP OUT TELECOMMUNICTIONS EQUIPMENT - (3) TMA'S, (3) RRU'S and Add 1 HYBRID LINE ENGINEER IS ANDREW FANDOZZI #53346