Building permit intelligence · Boston, MA
440-458 Rutherford Av has 64 municipal building permits on file in Ward 2. The latest recorded activity was a certificate of occupancy permit dated Jul 24, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Fedex Printing &; Distribution Warehouse, Offices and Indoor Gymnasium Sports Recreational Use Facility with Amenities.Temporary Certificate for Offices on 1st Floor Expires on 10/…
Install access control Brivo , rough wire
Relocate (12) Low Voltage Thermostats for Roof Top Units. (1) Time Clock for Gravity Vent
Furnish and install "Pickle BOS" letters. Internally illuminated channel letters
Fedex Printing &; Distribution, Warehouse and Office for Hampshire House, and Research Lab and;Indoor Gymnasium Sports Recreational Use Facility with Amenities.Certificate for;Indo…
1 mapped permit within 2 km, shown on the intelligence map above.
2 other addresses on Rutherford Av with municipal permit records in Boston.
This address has 64 permit records in PropertyLabs' public history and is located in Ward 2. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 440-458 Rutherford Av is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 440-458 Rutherford Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Rework existing fire alarm wiring and devices for new tenant layout. Work to include new Horn Strobes, Smoke detectors and booster panel.
Tenant fit out including selective demolition, new finishes, rework of existing MEPFP systems and relocated FA deceives for new layout. Upgrade of existing loading dock equipment.
Install new Lighting , Power and Fire alarm wiring
Interior demolition of an existing warehouse space. No alteration of sprinkler system or fire alarm system.
Plumbing renovation. Other item is Demo
Install the plumbing for a Pickleball place
Wire & Install (6) Smoke Detectors and (16) Audio-Visual Alarm Relays. All connected to the existing Fire Alarm Control Panel (FACP).
Wire & Install (9) Security Cameras, (8) Podplay Cameras, (11) TV Locations, & (6) WAPs
Fedex Printing &; Distribution, Warehouse and Office for Hampshire House, and Research LabCertificate for Warehouse &; OfficeALT1730380 Issued 9/9/2025;
Gas work for pickleball place
Indoor fitout of pickleball facility. (i.e BOSTON PICKLEBALL CLUB);Clarification: Change of occupancy include indoor gymnasium/sports recreational use facility to consist of 10 ind…
Space is being renovated and turned into a Pickleball Court/Facility. We are adding lighting, outlets, Switches, Mechanicals, EBUs, Exit Signs, Fire Alarm, and Low Voltage Security…
Installation of 6 new data locations and terminations
Furnish and install new wiring for (6) new horn strobe units.
Selective interior demolition of interior finishes, rework of existing interior GWB walls, replacement of interior lighting, rework existing ACT ceiling for new layout and rework t…
Furnish and install new power and lighting per build out plans, Work to include Fire Alarm wiring too.
Interior demo &; clean up vacant space
Demo of all plumbing services and hangers as cut and cap, make safe. Natural gas to be cut and capped.
We plan to remove select ceiling tiles in order to rework existing mechanical duct systems to allow for new distribution. We also plan to upgrade lighting, and finishes such as pai…
Demolition of existing space to include power, lighting and F/A.
Modify and remove existing devices and programming for space being demoed. no new tenant work at this time.
Selective interior demolition
Demolition of existing infrastructure and light fixtures. Installation of new infrastructure and light fixtures along the Sullivan Square Roadway Underpass.
Parcel 0202162075. Add ancillary parking for 420 Rutherford Avenue, as per ERT1295054.;[ePlan]
Installing an 6 foot chain link fence with a green wind screen, 75 linear feet in length.*Applicant responsible for a CSL to sign onto permit prior to commencing work
Install power from Eversource manhole to DAS/NODE 3356.
Retro fit 16 wall packs and 1 flood light.
Selective interior demo of finishes and MEP systems Fire protection heads to be modified and turned up for proper coverage Fire Alarm devises to be relocated and installed Exit sig…
Installation of 12 new cord drops fed from existing panel in Suite 400
Fedex Printing &; Distribution, Warehouse,;Office for Hampshire House and Research Lab Certificate for the;Research Lab - only ALT917528 issued 8/14/19 &; SF958950 issued 5/30/19
EXPAND ACCESS CONTROL
Install piping and wiring for two (2) exterior security cameras
install 20 low volatage/ data devices
Gas pipe new boilers unit heaters and repipe RTU
New FA devices & wiring in the new Indigo tenant fit out space, connected to an existing fire alarm control system, The Indigo tenant fit-out is 4800 SF within an existing 54,000 S…
Install low voltage building management system
installation of 50 low voltage outlets for Indigo
Change of Occupancy to add Research Lab. Interior fitout and new rooftop mechanical equipment. FP/FA Per Plans.;
Install plumbing system for a new lab. Include tempered water system. pH neutralization system, Protected water to lab sinks and equipment
200 amp overhead temporary service, exterior meter and main disconnect into temp service.
Electrical wiring for equipment power, lighting, HVAC fire alarm per engineered drawings to fit-out space for company called Indigo Agriculture, also includes temporary power & lig…
AT RISK--Interior fitout and new rooftop mechanical equipment. Per Plans. Pending issuance of ALT917528; no restriction. Full permit fee reflected on ALT917528.
Relocate one door and frame, ceiling repairs, modify HVAC, add new electrical outlets. Paint the suite.
Fedex Printing &; Distribution, Warehouse and Office for Hampshire House Certificate of Occupancy for Simplisafe - Amano &;;NetVersant; ALT390864, issued: 9/3/14;- A410850, issued:…
Feddex printing &;;Distribution, Warehouse and Office for Hampshire House C/O for Office;- Ground floor - Suite #450 ALT311921,;issued: 1/31/14, A410850, issued: 10/2/14
Install sprinkler system for new tenant layout per NFPA 13
Tel/Data Cabling for Suite 400 Netversant
meter install for 440 space only
Alter existing Sprinkler system to suit new tenant fit out this application is filed to Amend issued long form ALT390864.
Neversant
Neversant
Tenant Fit-out for NetVersant
Tenant Fit-Out for NetVersant
Interior fit up of existing empty space, new walls plumbing electrical HVAC and relocation of existing sprinklers. New finishes included as well, paint, flooring, doors, etc.
Reconnect gas from temp connection to tenant (City Electric)specific meter.
wire space for future electrical supply house
run and install 16 home run of cat6 for data only
install 12 devices to an existing fire alarm system for a for a future store space
Fedex Printing &; Distribution, Warehouse and Office for Hampshire House Temporary Certificate of Occupancy for Simplisafe - Amano - Ground Floor.; TCO valid until 3/30/2015;pendin…