Building permit intelligence · Minneapolis, MN
46 Summit Pl has 17 municipal building permits on file in Lowry Hill. The latest recorded activity was a res permit dated Jan 14, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 40 mapped permits within 500 m of this address.
Remodel
Tear-off and install new shingle roofing system
Install new fixtures in existing locations in 2nd floor hall bath
NON-STRUCTURAL REMODEL AT 2ND FLOOR HALL BATHROOM - DEMO FIXTURES AND FINISHES TO STUDS, INSTALL WALK-IN SHOWER, WC, AND LAV. INSTALL "SCHLUTER SHOWER SYSTEM" WATERPROOF TILED SHOW…
Installation of gas line to external BBQ. Connect line to meter and BBQ.
40 mapped permits within 500 m, shown on the intelligence map above.
This address has 17 permit records in PropertyLabs' public history and is located in Lowry Hill. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 30, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 46 Summit Pl is dated Jan 14, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 46 Summit Pl in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Tear off and replace a shingled roofing system. Tear off and replace EPDM roofing system. Replace gutters.
floor drain and vent
DEMO EXISTING PORCH AND REBUILDING WITH STONE, CMU, AND WOOD. STRUCTURAL DRAWINGS BY MATTSON MCDONALD YOUNG (JJL)*************** ENGINIEER: DAVID MCDONALD #14751************* SEPAR…
Remove & cap lower level bathtub
DRIVEWAY SNOWMELT SYSTEM
Add 1 floor supply and extend makeup air intake piping.
disconnect and reconnect a/c at new location, add (1) supply, extend makeup air duct
disconnect gas line to generator and extend line by 50' and reconnecting
replace 8 windows and one French door
replace retaining walls behind house. sck#1 engineer: schimnowski #40126
install footings for back stoop. sck#2
MAIN FLOOR MUDROOM ADDITION WITH CRAWL SPACE AND FOUNDATION WITH FOOTINGS FOR FUTURE CONCRETE WITH STONES STOOP AND STEPS TO A SINGLE FAMILY HOUSE. AAJ#1 ***NOTE: STRUCTURAL ENGINE…
Plumbing · Jul 27, 2026