Building permit intelligence · Minneapolis, MN
5312 45TH Ave S has 9 municipal building permits on file in Minnehaha. The latest recorded activity was a mechanical permit dated Jan 8, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
ExistRes
Relocate kitchen sink drain and vent , also water lines, to outside wall area, install new dishwasher.
(DMH-ProjectDox) NON-STRUCTURAL KITCHEN REMODEL IN SFD. PARTIAL REMO INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS AND DRYWALLFINISHES. NO WINDOW OR DOORREPLACEM…
ADD MUD ROOM AT REAR OF SFD (MAA) ENGR : DEREK PHILIPS 47507 Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRIC…
re roof
1 mapped permit within 500 m, shown on the intelligence map above.
6 other addresses on 45TH Ave S with municipal permit records in Minneapolis.
This address has 9 permit records in PropertyLabs' public history and is located in Minnehaha. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 5312 45TH Ave S is dated Jan 8, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 5312 45TH Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
2ND FLOOR REMODEL AND INSTALL NEW SIDING ON DORMER WALLS OF EXISTING SINGLE FAMILY HOUSE. AAJ#2. - REPLACE THREE EXISTING WINDOWS WITH NEW EGRESS AND TEMPERED GLAZING COMPLIANCE WI…
REPLACE 3 WINDOWS AT 2ND FLOOR OF SFD. WINDOWS SLIGHTLY TALLER IN SAME OPENINGS. (DMH) TEMPERED GLASS SHALL BE INSTALLED AT HAZARDOUS LOCATIONS PER 2015 MNSBC CHAPTER 1309 SECTIO…
BASEMENT BATHROOM AND LAUNDRY ROOM FINISH IN SFD. (DMH#2) INSTALL 2X FRAMING, FOAM INSUL,ATION, AND DRYWALL FINISH. INSTALL CEMENT BACKER BOARD FOR CERAMIC TILE AT TUB/SHOWER LOCAT…
basement bathroom