Building permit intelligence · Minneapolis, MN
5405 James Ave S has 9 municipal building permits on file in Kenny. The latest recorded activity was a mechanical permit dated Jan 21, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 9 mapped permits within 500 m of this address.
ExistRes
DETACHED GARAGE. 1 ROW BLOCK CURB. FIREWALL. (JJL) CONSTRUCT DETACHED __20'_ BY __22'_ WOOD FRAME GARAGE. GARAGE RETAINING WALL CONDITIONS: NO Construction Documents: ELECTRONIC (P…
Remove and replace 9 windows, same size
bathroom remodel and water damage repairs. sck Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING,…
Remove plumbing fixtures so they can demo the batheroom. Move toilet, replace shower valve, abandoned jetted tub, move pedestal sink, and move shower drain. Move toilet, pedestal s…
9 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on James Ave S with municipal permit records in Minneapolis.
This address has 9 permit records in PropertyLabs' public history and is located in Kenny. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 5405 James Ave S is dated Jan 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 5405 James Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
New ¾ bath remodel and laundry in addition
New A/C and ductwork for addition and a bath fan vent for addition
(DMH - ProjectDox) CONSTRUCT 25' X16' SINGLE STORY REAR ADDITON TO SFD FOR NEW REAR ENTRY, MAIN LEVEL BEDROOM WITH 3/4 BATHROOM OVER NEW UNFINISHED BASEMENT WITH NEW EGRESS WINDOW…
METER MOVE - Q4 2019 BATCH #13
Res · Jul 23, 2026