Building permit intelligence · Minneapolis, MN
600 Hennepin Ave has 33 municipal building permits on file in Downtown West. The latest recorded activity was a mechanical permit dated Jan 14, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
ComMFDNR
Construct a conference room in an open area of the tenant space certificate of occupancy required: no special inspections required: no SAC: 14.01 Charges, 14.01 Credits = 0 Net SAC…
plaza repairs and waterproofing. engineer: Retterath Walker Parking Consultants
Tear Off & Reroof 4th Floor Eyebrow Flat Section (MAA)
Connect gas from lp tanks to heaters on tents for St Patrick's event.
1 mapped permit within 500 m, shown on the intelligence map above.
5 other addresses on Hennepin Ave with municipal permit records in Minneapolis.
This address has 33 permit records in PropertyLabs' public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 600 Hennepin Ave is dated Jan 14, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 600 Hennepin Ave in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Furnish and Install duct heaters 1. Approval of these plans shall not be construed as permitting a violation of the building codes or any other laws or ordinances. 2. The airside e…
interior plumbing of a tenant finish out from existing space request for plans sent 2024-11-08 - lea
(DMH-ProjectDox) SELECT DEMO AND REMODEL TO 1,600 SQFT. TENANT SPACE. REMODEL 2 SINGLE USER ADA RESTROOMS. Const type: 1-A Occupancy: B 2020 MSBC Certificate of Occupancy required:…
FOR SKYWAY LEVEL/NEW TIMBERWOLVES LOBBY - PLUMBING FIXTURES
chilled water system, ducts work. refer to plans. BLDG1078457
1st level - Install plumbing waste lines for fixtures on second floor. 2nd level - Install plumbing supply waste/vent for 3 hand sinks, 1 WC and 1 floor sink. Install CW backup wit…
Conversion of storage area in existing May Clinic Square 2nd floor space to a new CT Scan room and associated spaces. Existing procedures room will be converted to a reading room.…
Suite 260-Relocate 6 diffusers, add RA grills
Remodel part of the Existing Office and new finish (MAA) certificate of occupancy required: yes no mechanical plans required for certificate of occupancy mechanical plans/letter of…
Install will include rotating an existing exhaust fan, stainless steel ducting to a new type 1 stainless steel hood over a Nieco Searing unit, gas piping connections to the unit, a…
(DMH-ProjectDox) TEAR OFF EXISTING ROOF MEMBRANE TO EXISTING INSULATION AND INSTALL NEW 1/2" HD ISO BOARD AND MECHANICALLY FASTEND 60 MIL EPDM. APPORX 52,871 SQFT. PER PLAN. APPROV…
INSTALL ICEMAKER AND NEW FLOOR DRAIN
replace exhaust add inline fan
FOR #200/TIMBERWOLVES E-SPORTS - 2 PRIVATE RESTROOMS INCLUDING INSTANT TYPE WATER HEATER
NEW ADA BATHROOMS TO EXISTING SPACE. NO STRUCTURAL WORK. THIS PERMIT IS NOT VALID FOR ANY ADDITIONAL WORK. (JJL)************* certificate of occupancy required no mechanical plans…
RELOCATE DIFFUSERS ONLY FOR 2ND FLOOR
demo and reconfiguration suite #200. sck#1 professional video game training space. certificate of occupancy required no special inspections required no const type: 1a occupancy: A3…
Super Bowl - Temp Assembly Occupancy suite 160 First floor. VIP Space - Host Committee - Includes leveling floors, providing ADA accessibility and emergency lighting const type: I-…
Tech Center, Test Kitchen, and parking levels.
NEW HEADQUARTERS FOR JACK LINK BEEF JERKY. 2 STORY BUILD OUT WITH NEW OFFICE SPACE, LOBBY TEST KITCHEN AREA AND RD/TECH CENTER (WSS) certificate of occupancy required yes mechanica…
Work to include electric high pressure steam (60psi) boiler for process steam,, 48 electric duct heaters, 3 MUA Units 1@ 800MBH, 1 @ 600 MBH, & 1 without gas, (55) fan coil units,…
21,000 sf of tenant improvement located on the 2nd and 3rd floors of the Mayo Clinic Sports Medicine Center. certificate of occupancy required yes mechanical plans/letter of means…
INSTALL NEW RTU WITH DUCT DISTRIBUTION TO 83 CHILLED BEAMS - INSTALL NEW EXHAUST FAN - 2ND & 3RD FLOOR -
clinic buildout on 2nd and 3rd floors
Heat recovery unit @ 450 MBH gas / 6000 CFM / hot gas reheat - chilled water piping / water to water heat exchanger per engineered plans
Application for plumbing of restrooms, sinks, and lounge areas for office area only. Per permit and applicant, the Tech center and food area will be a different permit
INTERIOR DEMO 2ND AND 3RD FLOORS TO PREP FOR FUTURE REMODEL PHASE 2 AT MAYO CLINIC SQUARE.
STRUCTURAL AND INTERIOR DEMO OF PORTIONS OF FLOORS LEVEL 1 PARKING, LEVEL 2 PARKING, 1ST AND 2ND FLOOR. STRUCTURAL STEEL WORK INCLUDES REINFORCEMENT OF EXISTING BEAMS, INSTALLATION…